blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3535995

EP3535995 - NETWORK SELECTION WITH STATELESS NETWORK FUNCTIONS [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  26.01.2024
Database last updated on 05.10.2024
FormerExamination is in progress
Status updated on  27.03.2020
FormerRequest for examination was made
Status updated on  25.03.2020
FormerExamination is in progress
Status updated on  07.03.2020
FormerRequest for examination was made
Status updated on  09.08.2019
FormerThe international publication has been made
Status updated on  08.06.2018
Formerunknown
Status updated on  08.05.2018
Most recent event   Tooltip26.01.2024Application deemed to be withdrawnpublished on 28.02.2024  [2024/09]
Applicant(s)For all designated states
Nokia Technologies Oy
Karakaari 7
02610 Espoo / FI
[2019/37]
Inventor(s)01 / CHANDRAMOULI, Devaki
3532 Thorp Springs Drive
Plano TX 75025 / US
02 / CASATI, Alessio
34 Molesham Way
West Molesey Surrey KT8 1NT / GB
 [2019/37]
Representative(s)Samson & Partner Patentanwälte mbB
Widenmayerstraße 6
80538 München / DE
[N/P]
Former [2019/37]Nokia EPO representatives
Nokia Technologies Oy
Karaportti 3
02610 Espoo / FI
Application number, filing date17866362.103.11.2017
[2019/37]
WO2017US59938
Priority number, dateUS201662417004P03.11.2016         Original published format: US 201662417004 P
[2019/37]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2018102073
Date:07.06.2018
Language:EN
[2018/23]
Type: A2 Application without search report 
No.:EP3535995
Date:11.09.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 07.06.2018 takes the place of the publication of the European patent application.
[2019/37]
Search report(s)International search report - published on:EP12.07.2018
ClassificationIPC:H04W8/04
[2019/37]
CPC:
H04W8/04 (EP,US); H04W76/11 (US); H04L67/142 (US);
H04W80/10 (US); H04L67/51 (EP,US); H04W84/042 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/37]
TitleGerman:NETZWERKAUSWAHL MIT ZUSTANDSLOSEN NETZWERKFUNKTIONEN[2019/37]
English:NETWORK SELECTION WITH STATELESS NETWORK FUNCTIONS[2019/37]
French:SÉLECTION DE RÉSEAU À FONCTIONS DE RÉSEAU SANS ÉTAT[2019/37]
Entry into regional phase03.06.2019National basic fee paid 
03.06.2019Designation fee(s) paid 
03.06.2019Examination fee paid 
Examination procedure27.05.2019Amendment by applicant (claims and/or description)
03.06.2019Examination requested  [2019/37]
03.06.2019Date on which the examining division has become responsible
31.03.2020Despatch of a communication from the examining division (Time limit: M06)
12.10.2020Reply to a communication from the examining division
27.08.2021Despatch of a communication from the examining division (Time limit: M06)
08.06.2022Reply to a communication from the examining division
15.05.2023Despatch of a communication from the examining division (Time limit: M04)
26.09.2023Application deemed to be withdrawn, date of legal effect  [2024/09]
17.10.2023Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2024/09]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
08.06.2022Request for further processing filed
08.06.2022Full payment received (date of receipt of payment)
Request granted
20.06.2022Decision despatched
Fees paidRenewal fee
14.11.2019Renewal fee patent year 03
13.11.2020Renewal fee patent year 04
21.10.2021Renewal fee patent year 05
13.10.2022Renewal fee patent year 06
Penalty fee
Additional fee for renewal fee
30.11.202307   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[A]US2014206314  (ABDALLAS ISAM [US]) [A] 1-25 * paragraph [0005] * * paragraph [0031] * * paragraph [0033] - paragraph [0034] ** paragraph [0038] - paragraph [0046] *;
 [X]  - SAMSUNG, "Update on solution 1.2: Extending the Slice Type components of an MDD vector", vol. SA WG2, no. Kaohsiung City, Taiwan; 20161017 - 20161021, (20161016), 3GPP DRAFT; S2-165853 UPDATE ON SOLUTION 1.2 - EXTENDING THE SLICE TYPE COMPONENTS OF AN MDD VECTOR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-0, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/SA2/Docs/, (20161016), XP051155434 [X] 1-25 * paragraphs 6.1.2, 6.1.2.2.1, 6.1.2.2.3.1 and 6.1.2.2.3.2 * * figures 6.1.2.2.3.1-1 and 6.1.2.2.3.2-1 *
 [A]  - DRAFTING EDITOR (NOKIA) ET AL, "Interim Agreements based on Way forward on Solutions for Key Issue 1 on Network Slicing", vol. SA WG2, no. Kaohsiung, Taiwan; 20161017 - 20161021, (20161024), 3GPP DRAFT; S2-166097-NETSLICING_PROPOSED AGREEMENTS-MERGED- REVISION 3 UPDATED DURING TUE NG SESSION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F, URL: http://www.3gpp.org/ftp/tsg_sa/WG2_Arch/TSGS2_117_Kaohsiung_City/Docs/, (20161024), XP051170058 [A] 1-25 * Paragraph 4 *
 [A]  - NOKIA, "Reply to SM and MM decoupling: S2-165642", vol. SA WG2, no. Kaohsiung city, Taiwan; 20161017 - 20161021, (20161024), 3GPP DRAFT; S2-165911 REPLY S2-165642-DISCUSSION ON SM AND MM DECOUPLING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX, URL: http://www.3gpp.org/ftp/tsg_sa/WG2_Arch/TSGS2_117_Kaohsiung_City/Docs/, (20161024), XP051169894 [A] 1-25
 [A]  - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Study on New Radio Access Technology; Radio Access Architecture and Interfaces (Release 14)", (20161101), 3GPP DRAFT; R3-162527_TR 38 801 V060, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG3_Iu/TSGR3_93bis/Docs/, (20161101), XP051163420 [A] 1-25 * Paragraph 8.2.3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.