| EP3535162 - ELECTROMAGNETIC SHIELD FOR REARVIEW ASSEMBLY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.01.2024 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 17.02.2023 | ||
| Former | Grant of patent is intended Status updated on 14.11.2022 | ||
| Former | Examination is in progress Status updated on 31.07.2020 | ||
| Former | Request for examination was made Status updated on 09.08.2019 | ||
| Former | The international publication has been made Status updated on 11.05.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Gentex Corporation 600 North Centennial Street Zeeland, MI 49464 / US | [2019/37] | Inventor(s) | 01 /
BOUWKAMP, David J. 600 North Centennial Street Zeeland Michigan 49464 / US | [2019/37] | Representative(s) | Müller-Boré & Partner Patentanwälte PartG mbB Friedenheimer Brücke 21 80639 München / DE | [2019/37] | Application number, filing date | 17867384.4 | 01.11.2017 | [2019/37] | WO2017US59496 | Priority number, date | US201662415916P | 01.11.2016 Original published format: US 201662415916 P | [2019/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018085368 | Date: | 11.05.2018 | Language: | EN | [2018/19] | Type: | A1 Application with search report | No.: | EP3535162 | Date: | 11.09.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.05.2018 takes the place of the publication of the European patent application. | [2019/37] | Type: | B1 Patent specification | No.: | EP3535162 | Date: | 22.03.2023 | Language: | EN | [2023/12] | Search report(s) | International search report - published on: | RU | 11.05.2018 | (Supplementary) European search report - dispatched on: | EP | 29.08.2019 | Classification | IPC: | H05K9/00, H05K7/20, G02F1/15, G02B5/08, B60R1/04 | [2022/49] | CPC: |
B60R1/04 (EP,KR,US);
H05K9/0032 (EP,KR,US);
B60R1/088 (KR,US);
G02B5/08 (EP,KR,US);
G02F1/1533 (KR,US);
G02F1/157 (KR,US);
H05K7/20436 (EP,KR,US);
H05K7/20454 (EP,KR,US);
H05K9/0081 (KR,US);
|
| Former IPC [2019/37] | B60R1/04, B60R1/12 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ELEKTROMAGNETISCHE ABSCHIRMUNG FÜR RÜCKSPIEGELANORDNUNG | [2019/37] | English: | ELECTROMAGNETIC SHIELD FOR REARVIEW ASSEMBLY | [2019/37] | French: | ÉCRAN ÉLECTROMAGNÉTIQUE POUR UN ENSEMBLE RÉTROVISEUR | [2019/37] | Entry into regional phase | 29.05.2019 | National basic fee paid | 29.05.2019 | Search fee paid | 29.05.2019 | Designation fee(s) paid | 29.05.2019 | Examination fee paid | Examination procedure | 29.05.2019 | Examination requested [2019/37] | 27.03.2020 | Amendment by applicant (claims and/or description) | 04.08.2020 | Despatch of a communication from the examining division (Time limit: M04) | 14.12.2020 | Reply to a communication from the examining division | 15.11.2022 | Communication of intention to grant the patent | 07.02.2023 | Receipt of the translation of the claim(s) | 09.02.2023 | Fee for grant paid | 09.02.2023 | Fee for publishing/printing paid | Opposition(s) | 02.01.2024 | No opposition filed within time limit [2024/09] | Fees paid | Renewal fee | 20.11.2019 | Renewal fee patent year 03 | 19.11.2020 | Renewal fee patent year 04 | 18.11.2021 | Renewal fee patent year 05 | 22.11.2022 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 01.11.2017 | HU | 01.11.2017 | AT | 22.03.2023 | BG | 22.03.2023 | CZ | 22.03.2023 | DK | 22.03.2023 | EE | 22.03.2023 | ES | 22.03.2023 | FI | 22.03.2023 | HR | 22.03.2023 | IT | 22.03.2023 | LT | 22.03.2023 | LV | 22.03.2023 | MC | 22.03.2023 | NL | 22.03.2023 | PL | 22.03.2023 | RO | 22.03.2023 | RS | 22.03.2023 | SE | 22.03.2023 | SI | 22.03.2023 | SK | 22.03.2023 | SM | 22.03.2023 | TR | 22.03.2023 | NO | 22.06.2023 | GR | 23.06.2023 | IS | 22.07.2023 | PT | 24.07.2023 | IE | 01.11.2023 | LU | 01.11.2023 | BE | 30.11.2023 | CH | 30.11.2023 | [2026/04] |
| Former [2025/39] | CY | 01.11.2017 | |
| HU | 01.11.2017 | ||
| AT | 22.03.2023 | ||
| BG | 22.03.2023 | ||
| CZ | 22.03.2023 | ||
| DK | 22.03.2023 | ||
| EE | 22.03.2023 | ||
| ES | 22.03.2023 | ||
| FI | 22.03.2023 | ||
| HR | 22.03.2023 | ||
| IT | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| MC | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| PL | 22.03.2023 | ||
| RO | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| SI | 22.03.2023 | ||
| SK | 22.03.2023 | ||
| SM | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| IS | 22.07.2023 | ||
| PT | 24.07.2023 | ||
| IE | 01.11.2023 | ||
| LU | 01.11.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2025/36] | CY | 01.11.2017 | |
| AT | 22.03.2023 | ||
| BG | 22.03.2023 | ||
| CZ | 22.03.2023 | ||
| DK | 22.03.2023 | ||
| EE | 22.03.2023 | ||
| ES | 22.03.2023 | ||
| FI | 22.03.2023 | ||
| HR | 22.03.2023 | ||
| IT | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| MC | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| PL | 22.03.2023 | ||
| RO | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| SI | 22.03.2023 | ||
| SK | 22.03.2023 | ||
| SM | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| IS | 22.07.2023 | ||
| PT | 24.07.2023 | ||
| IE | 01.11.2023 | ||
| LU | 01.11.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/51] | AT | 22.03.2023 | |
| BG | 22.03.2023 | ||
| CZ | 22.03.2023 | ||
| DK | 22.03.2023 | ||
| EE | 22.03.2023 | ||
| ES | 22.03.2023 | ||
| FI | 22.03.2023 | ||
| HR | 22.03.2023 | ||
| IT | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| MC | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| PL | 22.03.2023 | ||
| RO | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| SI | 22.03.2023 | ||
| SK | 22.03.2023 | ||
| SM | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| IS | 22.07.2023 | ||
| PT | 24.07.2023 | ||
| IE | 01.11.2023 | ||
| LU | 01.11.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/47] | AT | 22.03.2023 | |
| CZ | 22.03.2023 | ||
| DK | 22.03.2023 | ||
| EE | 22.03.2023 | ||
| ES | 22.03.2023 | ||
| FI | 22.03.2023 | ||
| HR | 22.03.2023 | ||
| IT | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| MC | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| PL | 22.03.2023 | ||
| RO | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| SI | 22.03.2023 | ||
| SK | 22.03.2023 | ||
| SM | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| IS | 22.07.2023 | ||
| PT | 24.07.2023 | ||
| IE | 01.11.2023 | ||
| LU | 01.11.2023 | ||
| BE | 30.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/46] | AT | 22.03.2023 | |
| CZ | 22.03.2023 | ||
| DK | 22.03.2023 | ||
| EE | 22.03.2023 | ||
| ES | 22.03.2023 | ||
| FI | 22.03.2023 | ||
| HR | 22.03.2023 | ||
| IT | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| MC | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| PL | 22.03.2023 | ||
| RO | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| SI | 22.03.2023 | ||
| SK | 22.03.2023 | ||
| SM | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| IS | 22.07.2023 | ||
| PT | 24.07.2023 | ||
| IE | 01.11.2023 | ||
| LU | 01.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/34] | AT | 22.03.2023 | |
| CZ | 22.03.2023 | ||
| DK | 22.03.2023 | ||
| EE | 22.03.2023 | ||
| ES | 22.03.2023 | ||
| FI | 22.03.2023 | ||
| HR | 22.03.2023 | ||
| IT | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| MC | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| PL | 22.03.2023 | ||
| RO | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| SI | 22.03.2023 | ||
| SK | 22.03.2023 | ||
| SM | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| IS | 22.07.2023 | ||
| PT | 24.07.2023 | ||
| LU | 01.11.2023 | ||
| CH | 30.11.2023 | ||
| Former [2024/32] | AT | 22.03.2023 | |
| CZ | 22.03.2023 | ||
| DK | 22.03.2023 | ||
| EE | 22.03.2023 | ||
| ES | 22.03.2023 | ||
| FI | 22.03.2023 | ||
| HR | 22.03.2023 | ||
| IT | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| MC | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| PL | 22.03.2023 | ||
| RO | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| SI | 22.03.2023 | ||
| SK | 22.03.2023 | ||
| SM | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| IS | 22.07.2023 | ||
| PT | 24.07.2023 | ||
| Former [2024/26] | AT | 22.03.2023 | |
| CZ | 22.03.2023 | ||
| DK | 22.03.2023 | ||
| EE | 22.03.2023 | ||
| ES | 22.03.2023 | ||
| FI | 22.03.2023 | ||
| HR | 22.03.2023 | ||
| IT | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| PL | 22.03.2023 | ||
| RO | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| SI | 22.03.2023 | ||
| SK | 22.03.2023 | ||
| SM | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| IS | 22.07.2023 | ||
| PT | 24.07.2023 | ||
| Former [2024/10] | AT | 22.03.2023 | |
| CZ | 22.03.2023 | ||
| DK | 22.03.2023 | ||
| EE | 22.03.2023 | ||
| ES | 22.03.2023 | ||
| FI | 22.03.2023 | ||
| HR | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| PL | 22.03.2023 | ||
| RO | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| SI | 22.03.2023 | ||
| SK | 22.03.2023 | ||
| SM | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| IS | 22.07.2023 | ||
| PT | 24.07.2023 | ||
| Former [2023/50] | AT | 22.03.2023 | |
| EE | 22.03.2023 | ||
| ES | 22.03.2023 | ||
| FI | 22.03.2023 | ||
| HR | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| PL | 22.03.2023 | ||
| RO | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| SK | 22.03.2023 | ||
| SM | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| IS | 22.07.2023 | ||
| PT | 24.07.2023 | ||
| Former [2023/49] | AT | 22.03.2023 | |
| EE | 22.03.2023 | ||
| ES | 22.03.2023 | ||
| FI | 22.03.2023 | ||
| HR | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| RO | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| SM | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| PT | 24.07.2023 | ||
| Former [2023/48] | AT | 22.03.2023 | |
| EE | 22.03.2023 | ||
| ES | 22.03.2023 | ||
| FI | 22.03.2023 | ||
| HR | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| SM | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| PT | 24.07.2023 | ||
| Former [2023/46] | ES | 22.03.2023 | |
| FI | 22.03.2023 | ||
| HR | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| SM | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| PT | 24.07.2023 | ||
| Former [2023/38] | FI | 22.03.2023 | |
| HR | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| NL | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| Former [2023/37] | FI | 22.03.2023 | |
| HR | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| GR | 23.06.2023 | ||
| Former [2023/36] | FI | 22.03.2023 | |
| HR | 22.03.2023 | ||
| LT | 22.03.2023 | ||
| LV | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| SE | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| Former [2023/35] | HR | 22.03.2023 | |
| LT | 22.03.2023 | ||
| RS | 22.03.2023 | ||
| NO | 22.06.2023 | ||
| Former [2023/34] | LT | 22.03.2023 | |
| RS | 22.03.2023 | ||
| Former [2023/33] | LT | 22.03.2023 | Documents cited: | Search | [A] US2017231123 (BALL SHELBY et al.) [A] 1-11 * abstract * * figures 1-3 * * paragraphs [0016] - [0022] * | [A] WO2007103733 (LAIRD TECHNOLOGIES INC et al.) [A] 1-11 | [XP] US2002166683 (SHLAHTICHMAN ANATOLIY et al.) [XP] 1-11 * abstract * * paragraphs [0002] - [0007] - [0022] - [0023] - [0026] - [0027] - [0024] , [0005] , [0029] , [0031] , [0032] * * figures 1-7 * | International search | [A] US2015232034 (WELLER ANDREW D et al.) [A] 1-4, 12-14, 17-19 * , abstract, paragraphs [0180]-[0189], fig. 1-45 * | [A] US2015029574 (DRISCOLL DAVID I et al.) [A] 1-4, 12-14, 17-19 * , paragraphs [0019]-[0026], fig. 1-6 * | [A] US2014307344 (CAMMENGA DAVID J et al.) [A] 1-4, 12-14, 17-19 * , abstract, claims, fig. 1 -50 * | Examination | US2004052064 | EP1997363 | by applicant | US2017231123 | US2002166683 | WO2007103733 |