EP3372830 - BOLT SLEEVE CONNECTOR, BLADE AND MANUFACTURING METHOD OF BLADE, AND WIND TURBINE SET [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.06.2021 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 10.07.2020 | ||
Former | Grant of patent is intended Status updated on 24.02.2020 | ||
Former | Request for examination was made Status updated on 10.08.2018 | ||
Former | The international publication has been made Status updated on 07.07.2018 | ||
Former | unknown Status updated on 14.05.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Beijing Goldwind Science & Creation Windpower Equipment Co. Ltd. No. 19 Kangding Road Beijing Economic & Technological Development Zone Daxing Beijing 100176 / CN | [2018/37] | Inventor(s) | 01 /
WANG, Xingbo No. 8 Boxing 1st Road Beijing Economic & Technological Development Zone Daxing District Beijing 100176 / CN | 02 /
HAO, Liufeng No. 8 Boxing 1st Road Beijing Economic & Technological Development Zone Daxing District Beijing 100176 / CN | [2018/37] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2018/37] | Application number, filing date | 17868480.9 | 20.06.2017 | [2018/37] | WO2017CN89104 | Priority number, date | CN201611243631 | 29.12.2016 Original published format: CN201611243631 | [2018/37] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018120677 | Date: | 05.07.2018 | Language: | ZH | [2018/27] | Type: | A1 Application with search report | No.: | EP3372830 | Date: | 12.09.2018 | Language: | EN | [2018/37] | Type: | B1 Patent specification | No.: | EP3372830 | Date: | 12.08.2020 | Language: | EN | [2020/33] | Search report(s) | International search report - published on: | CN | 05.07.2018 | (Supplementary) European search report - dispatched on: | EP | 29.05.2019 | Classification | IPC: | F03D80/00, F03D1/06 | [2019/26] | CPC: |
F03D1/0658 (EP);
F03D80/00 (EP,KR);
F03D1/0675 (KR,US);
B29C45/14 (KR,US);
B29C45/14467 (US);
B29C70/08 (KR);
B29C70/467 (KR);
B29C70/48 (US);
B29C70/68 (US);
F03D1/066 (US);
F03D13/00 (EP);
F03D13/10 (EP);
B29K2309/08 (US);
B29L2031/085 (KR,US);
F05B2220/30 (US);
F05B2230/20 (US);
F05B2240/221 (US);
F05B2240/30 (US);
|
Former IPC [2018/37] | F03D80/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SCHRAUBENHÜLSENVERBINDER, SCHAUFEL UND HERSTELLUNGSVERFAHREN DER SCHAUFEL SOWIE WINDTURBINENSATZ | [2018/37] | English: | BOLT SLEEVE CONNECTOR, BLADE AND MANUFACTURING METHOD OF BLADE, AND WIND TURBINE SET | [2018/37] | French: | RACCORD DE MANCHON DE BOULON, PALE ET PROCÉDÉ DE FABRICATION DE PALE, ET ENSEMBLE ÉOLIENNE | [2018/37] | Entry into regional phase | 14.05.2018 | Translation filed | 14.05.2018 | National basic fee paid | 14.05.2018 | Search fee paid | 14.05.2018 | Designation fee(s) paid | 14.05.2018 | Examination fee paid | Examination procedure | 14.05.2018 | Amendment by applicant (claims and/or description) | 14.05.2018 | Examination requested [2018/37] | 14.05.2018 | Date on which the examining division has become responsible | 25.02.2020 | Communication of intention to grant the patent | 06.07.2020 | Fee for grant paid | 06.07.2020 | Fee for publishing/printing paid | 06.07.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 14.05.2021 | No opposition filed within time limit [2021/29] | Fees paid | Renewal fee | 24.06.2019 | Renewal fee patent year 03 | 31.03.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.06.2017 | AL | 12.08.2020 | AT | 12.08.2020 | CY | 12.08.2020 | CZ | 12.08.2020 | DK | 12.08.2020 | EE | 12.08.2020 | FI | 12.08.2020 | HR | 12.08.2020 | IT | 12.08.2020 | LT | 12.08.2020 | LV | 12.08.2020 | MC | 12.08.2020 | MK | 12.08.2020 | NL | 12.08.2020 | PL | 12.08.2020 | RO | 12.08.2020 | RS | 12.08.2020 | SE | 12.08.2020 | SI | 12.08.2020 | SK | 12.08.2020 | SM | 12.08.2020 | TR | 12.08.2020 | BG | 12.11.2020 | NO | 12.11.2020 | GR | 13.11.2020 | IS | 12.12.2020 | PT | 14.12.2020 | [2024/29] |
Former [2024/23] | HU | 20.06.2017 | |
AL | 12.08.2020 | ||
AT | 12.08.2020 | ||
CY | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
MK | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
PT | 14.12.2020 | ||
Former [2023/33] | HU | 20.06.2017 | |
AL | 12.08.2020 | ||
AT | 12.08.2020 | ||
CY | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
PT | 14.12.2020 | ||
Former [2023/30] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CY | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
PT | 14.12.2020 | ||
Former [2023/20] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
PT | 14.12.2020 | ||
Former [2022/08] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
MC | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/36] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SI | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/34] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
IT | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/28] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SK | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/25] | AL | 12.08.2020 | |
AT | 12.08.2020 | ||
CZ | 12.08.2020 | ||
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/22] | CZ | 12.08.2020 | |
DK | 12.08.2020 | ||
EE | 12.08.2020 | ||
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RO | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
SM | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/21] | DK | 12.08.2020 | |
FI | 12.08.2020 | ||
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/12] | FI | 12.08.2020 | |
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
NL | 12.08.2020 | ||
PL | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/10] | FI | 12.08.2020 | |
HR | 12.08.2020 | ||
LT | 12.08.2020 | ||
LV | 12.08.2020 | ||
PL | 12.08.2020 | ||
RS | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
IS | 12.12.2020 | ||
Former [2021/09] | FI | 12.08.2020 | |
LT | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
GR | 13.11.2020 | ||
Former [2021/08] | FI | 12.08.2020 | |
LT | 12.08.2020 | ||
SE | 12.08.2020 | ||
BG | 12.11.2020 | ||
NO | 12.11.2020 | ||
Former [2021/07] | FI | 12.08.2020 | |
LT | 12.08.2020 | ||
NO | 12.11.2020 | Documents cited: | Search | [A]EP2532880 (SIEMENS AG [DE]) [A] 1-24 * paragraph [0017]; figures 1-9 *; | [A]EP2944803 (INGENIERIA PROSIX S L [ES]) [A] 1-24 * paragraphs [0037] - [0044]; figures 2,4,5 *; | [A]CN106121935 (SANY HEAVY ENERGY EQUIPMENT CO LTD) [A] 1-24* figures 1-5 * | International search | [A]CN102220936 (BEIJING CENTURY ENERGY WIND POWER EQUIPMENT CO LTD) [A] 1-24 * , entire document *; | [A]US2012230827 (DAWSON MARK [US], et al) [A] 1-24* , entire document *; | [A]CN103061995 (CHONGQING GENERAL IND GROUP CO) [A] 1-24 * , entire document *; | [A]CN103264510 (LIANYUNGANG ZHONGFU LIANZHONG COMPOSITES GROUP CO LTD) [A] 1-24 * , entire document *; | [A]CN106121935 (SANY HEAVY ENERGY EQUIPMENT CO LTD) [A] 1-24 * , description, paragraphs 20-69, and figures 1 and 3-5 *; | [A]CN205841105U (UNIV YICHUN) [A] 1-24 * , entire document *; | [PX]CN106762462 (BEIJING GOLDWIND SCIENCE & CREATION WINDPOWER EQUIPMENT CO LTD) [PX] 1-24 * , description, paragraphs 58-98, and figures 2-11 * |