blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3539350

EP3539350 - METHOD AND USER EQUIPMENT FOR RECEIVING DOWNLINK SIGNALS [Right-click to bookmark this link]
StatusExamination is in progress
Status updated on  21.05.2021
Database last updated on 26.06.2024
FormerRequest for examination was made
Status updated on  16.08.2019
FormerThe international publication has been made
Status updated on  18.05.2018
Most recent event   Tooltip24.11.2023New entry: Renewal fee paid 
Applicant(s)For all designated states
LG Electronics Inc.
128, Yeoui-daero
Yeongdeungpo-gu
Seoul 07336 / KR
[2019/38]
Inventor(s)01 / YI, Seungjune
IP Center
LG Electronics Inc.
19 Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
02 / LEE, Sunyoung
IP Center
LG Electronics Inc.
19 Yangjae-daero 11-gil
Seocho-gu
Seoul 06772 / KR
 [2019/38]
Representative(s)Plasseraud IP
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
[N/P]
Former [2019/38]Cabinet Plasseraud
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
Application number, filing date17869354.510.11.2017
[2019/38]
WO2017KR12728
Priority number, dateUS201662421291P13.11.2016         Original published format: US 201662421291 P
US201662421972P14.11.2016         Original published format: US 201662421972 P
[2019/38]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018088840
Date:17.05.2018
Language:EN
[2018/20]
Type: A1 Application with search report 
No.:EP3539350
Date:18.09.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 17.05.2018 takes the place of the publication of the European patent application.
[2019/38]
Search report(s)International search report - published on:KR17.05.2018
(Supplementary) European search report - dispatched on:EP15.05.2020
ClassificationIPC:H04W76/20, H04W72/02, H04W52/02, H04W68/02, // H04W76/28
[2020/25]
CPC:
H04W68/02 (EP,US); H04L5/0055 (US); H04W52/0216 (EP);
H04W74/006 (US); H04W76/27 (US); H04W76/28 (EP,US);
Y02D30/70 (EP) (-)
Former IPC [2019/38]H04W76/20
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/38]
TitleGerman:VERFAHREN UND BENUTZERGERÄT ZUM EMPFANGEN VON DOWNLINK-SIGNALEN[2019/38]
English:METHOD AND USER EQUIPMENT FOR RECEIVING DOWNLINK SIGNALS[2019/38]
French:PROCÉDÉ ET ÉQUIPEMENT UTILISATEUR DESTINÉS À LA RÉCEPTION DE SIGNAUX DE LIAISON DESCENDANTE[2019/38]
Entry into regional phase15.05.2019National basic fee paid 
15.05.2019Search fee paid 
15.05.2019Designation fee(s) paid 
15.05.2019Examination fee paid 
Examination procedure15.05.2019Examination requested  [2019/38]
09.12.2020Amendment by applicant (claims and/or description)
21.05.2021Despatch of a communication from the examining division (Time limit: M04)
28.09.2021Reply to a communication from the examining division
20.03.2023Despatch of a communication from the examining division (Time limit: M04)
20.07.2023Reply to a communication from the examining division
Fees paidRenewal fee
26.11.2019Renewal fee patent year 03
20.11.2020Renewal fee patent year 04
24.11.2021Renewal fee patent year 05
24.11.2022Renewal fee patent year 06
24.11.2023Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[Y]EP2265079  (HTC CORP [TW]) [Y] 1-11 * paragraph [0006] - paragraph [0008] * * paragraph [0010] - paragraph [0017] * * figures 2,4,5 *;
 [Y]US2011002281  (TERRY STEPHEN E [US], et al) [Y] 1-11 * paragraph [0022] * * paragraph [0042] - paragraph [0047] * * paragraph [0077] - paragraph [0084] *;
 [A]  - CATT, "Small data transmission in inactive state", vol. RAN WG2, no. Kaohsiung; 20161010 - 20161014, (20161009), 3GPP DRAFT; R2-166118, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20161009), XP051150736 [A] 1-11 * paragraphs [001.] , [002.] * * paragraphs [03.2] , [03.3] *
 [A]  - NOKIA ET AL, "DRX principles for NR", vol. RAN WG2, no. Reno, USA; 20161114 - 20161118, (20161104), 3GPP DRAFT; R2-167707 DRX PRINCIPLES IN NR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_96/Docs/, (20161104), XP051192253 [A] 1-11 * the whole document *
 [A]  - HUAWEI ET AL, "DL data transmission in RRC_INACTIVE", vol. RAN WG2, no. Reno, Nevada, USA; 20161114 - 20161118, (20161105), 3GPP DRAFT; R2-168546 DL DATA TRANSMISSION IN RRC_INACTIVE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_96/Docs/, (20161105), XP051193091 [A] 1-11 * paragraph [02.2] *
 [A]  - ERICSSON, "DRX in idle and RRC_INACTIVE state", vol. RAN WG2, no. Reno, Nevada, U.S.; 20161114 - 20161118, (20161104), 3GPP DRAFT; R2-168488 - DRX IN IDLE AND INACTIVE STATE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_96/Docs/, (20161104), XP051192515 [A] 1-11 * paragraph [001.] - paragraph [003.] *
 [XP]  - LG ELECTRONICS INC, "Notification triggered DL data transmission in RRC_INACTIVE", vol. RAN WG2, no. Spokane, USA; 20170117 - 20170119, (20170107), 3GPP DRAFT; R2-1700440 NOTIFICATION BASED DOWNLINK TRANSMISSION IN RRC_INACTIVE_R1, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIP, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_AHs/2017_01_NR/Docs/, (20170107), XP051204005 [XP] 1-11 * the whole document *
International search[Y]US2016128129  (KAHTAVA JUSSI [GB], et al) [Y] 1-20 * See paragraphs [0057], [0090], [0115]; and claim 1. *;
 [Y]WO2015173197  (SONY CORP [JP], et al) [Y] 1-20 * See page 12, lines 1-6; page 13, lines 3-6; page 14, lines 26-28; and claims 1, 4, 11, 12. *;
 [Y]WO2015054886  (NOKIA SIEMENS NETWORKS OY [FI], et al) [Y] 7-8, 17-18 * See claims 1-3. *;
 [A]US2016007170  (VAIDYA MAULIK VIJAY [US], et al) [A] 1-20 * See paragraphs [0186]-[0191]; and claims 1-4. *;
 [A]US2016044605  (VAJAPEYAM MADHAVAN SRINIVASAN [US], et al) [A] 1-20 * See paragraphs [0093]-[0095]; and figure 5. *;
 [A]US2013329637  (KODALI SREE RAM [US], et al) [A] 1-20 * See claims 12-15. *
by applicantEP2265079
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.