blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3527022

EP3527022 - METHOD AND APPARATUS FOR TRANSMITTING AND RECEIVING DATA OF TERMINAL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  05.11.2021
Database last updated on 24.04.2024
FormerThe patent has been granted
Status updated on  27.11.2020
FormerGrant of patent is intended
Status updated on  15.07.2020
FormerRequest for examination was made
Status updated on  19.07.2019
FormerThe international publication has been made
Status updated on  11.06.2018
Most recent event   Tooltip14.07.2023Lapse of the patent in a contracting state
New state(s): HU, SM
published on 16.08.2023  [2023/33]
Applicant(s)For all designated states
Samsung Electronics Co., Ltd.
129, Samsung-ro
Yeongtong-gu
Suwon-si, Gyeonggi-do 16677 / KR
[2019/34]
Inventor(s)01 / KIM, Youngbum
Samsung Electronics Co., Ltd.
129 Samsung-ro
Yeongtong-gu
Suwon-si
Gyeonggi-do 16677 / KR
02 / KIM, Donghan
Samsung Electronics Co., Ltd.
129 Samsung-ro
Yeongtong-gu
Suwon-si
Gyeonggi-do 16677 / KR
03 / KWAK, Yongjun
Samsung Electronics Co., Ltd.
129 Samsung-ro
Yeongtong-gu
Suwon-si
Gyeonggi-do 16677 / KR
04 / KIM, Taehyoung
Samsung Electronics Co., Ltd.
129 Samsung-ro
Yeongtong-gu
Suwon-si
Gyeonggi-do 16677 / KR
05 / CHOI, Seunghoon
Samsung Electronics Co., Ltd.
129 Samsung-ro
Yeongtong-gu
Suwon-si
Gyeonggi-do 16677 / KR
 [2019/34]
Representative(s)HGF
HGF Limited
1 City Walk
Leeds LS11 9DX / GB
[N/P]
Former [2021/01]HGF
1 City Walk
Leeds LS11 9DX / GB
Former [2019/34]HGF Limited
Saviour House
9 St. Saviourgate
York YO1 8NQ / GB
Application number, filing date17874041.122.11.2017
[2019/34]
WO2017KR13350
Priority number, dateUS201662425369P22.11.2016         Original published format: US 201662425369 P
KR2016017061114.12.2016         Original published format: KR 20160170611
[2019/34]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2018097597
Date:31.05.2018
Language:EN
[2018/22]
Type: A2 Application without search report 
No.:EP3527022
Date:21.08.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 31.05.2018 takes the place of the publication of the European patent application.
[2019/34]
Type: B1 Patent specification 
No.:EP3527022
Date:30.12.2020
Language:EN
[2020/53]
Search report(s)International search report - published on:KR26.07.2018
(Supplementary) European search report - dispatched on:EP06.09.2019
ClassificationIPC:H04L5/00, H04W24/04, H04W72/00, H04W76/00, H04W52/28, H04W52/32, // H04W28/20, H04W72/04
[2020/32]
CPC:
H04W52/322 (EP,US); H04W72/20 (KR); H04L5/001 (EP);
H04L5/0098 (EP); H04W24/04 (EP); H04W52/283 (EP);
H04W52/325 (EP,US); H04W56/00 (KR); H04W72/0453 (EP,KR);
H04W76/00 (EP); H04W28/20 (EP) (-)
Former IPC [2019/41]H04L5/00, H04W72/04, H04W56/00, H04W24/04, H04W72/00, H04W76/00, H04W52/28, H04W52/32
Former IPC [2019/34]H04W72/04, H04W56/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/34]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUM SENDEN UND EMPFANGEN VON DATEN EINES ENDGERÄTS[2019/34]
English:METHOD AND APPARATUS FOR TRANSMITTING AND RECEIVING DATA OF TERMINAL[2019/34]
French:PROCÉDÉ ET APPAREIL D'ÉMISSION ET DE RÉCEPTION DE DONNÉES DE TERMINAL[2019/34]
Entry into regional phase17.05.2019National basic fee paid 
17.05.2019Search fee paid 
17.05.2019Designation fee(s) paid 
17.05.2019Examination fee paid 
Examination procedure17.05.2019Examination requested  [2019/34]
27.01.2020Amendment by applicant (claims and/or description)
16.07.2020Communication of intention to grant the patent
19.11.2020Fee for grant paid
19.11.2020Fee for publishing/printing paid
19.11.2020Receipt of the translation of the claim(s)
Divisional application(s)EP20217072.6  / EP3829099
Opposition(s)01.10.2021No opposition filed within time limit [2021/49]
Fees paidRenewal fee
22.11.2019Renewal fee patent year 03
24.11.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.11.2017
AL30.12.2020
AT30.12.2020
CY30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SI30.12.2020
SK30.12.2020
SM30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
[2023/33]
Former [2023/30]AL30.12.2020
AT30.12.2020
CY30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SI30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2022/33]AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
MC30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SI30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2022/23]AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SI30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2022/13]AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SI30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
PT30.04.2021
Former [2022/10]AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/49]AL30.12.2020
AT30.12.2020
CZ30.12.2020
DK30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2021/45]AL30.12.2020
AT30.12.2020
CZ30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2021/42]AT30.12.2020
CZ30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
IS30.04.2021
PT30.04.2021
Former [2021/39]AT30.12.2020
CZ30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
PL30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/37]AT30.12.2020
CZ30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/36]CZ30.12.2020
EE30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/35]CZ30.12.2020
FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
RO30.12.2020
RS30.12.2020
SK30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/33]FI30.12.2020
HR30.12.2020
LT30.12.2020
LV30.12.2020
RS30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
PT30.04.2021
Former [2021/28]FI30.12.2020
HR30.12.2020
LV30.12.2020
RS30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
Former [2021/23]FI30.12.2020
LV30.12.2020
RS30.12.2020
BG30.03.2021
NO30.03.2021
GR31.03.2021
Former [2021/22]FI30.12.2020
RS30.12.2020
NO30.03.2021
Former [2021/20]FI30.12.2020
Documents cited:Search[I]US2016302228  (KAZMI MUHAMMAD [SE], et al) [I] 1-15 * paragraphs [0013] - [0017] - [0104] - [0136] *;
 [I]  - MEDIATEK INC, "Discussion on initial access for NR", vol. RAN WG1, no. Gothenburg, Sweden; 20160822 - 20160826, (20160821), 3GPP DRAFT; R1-167542 DISCUSSION ON INITIAL ACCESS IN NR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20160821), XP051125968 [I] 1-15 * sections 2.1, 2.2 *
 [XP]  - QUALCOMM INCORPORATED, "Open Issues on BWP", vol. RAN WG1, no. Reno, NV, USA; 20171127 - 20171201, (20171118), 3GPP DRAFT; R1-1720693 OPEN ISSUES ON BWP, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F91/Docs/, (20171118), XP051370154 [XP] 1-15 * sections 2.1, 2.2.6, 2.2.7 *
 [XP]  - INTERDIGITAL ET AL, "Details of BWP switching operation", vol. RAN WG1, no. Reno, U.S.A; 20171127 - 20171201, (20171118), 3GPP DRAFT; R1-1720556 (R15 NR WI AI 7341 DETAILS OF BWP SWITCHING OPERATION), 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS, URL: http://www.3gpp.org/ftp/tsg%5Fran/WG1%5FRL1/TSGR1%5F91/Docs/, (20171118), XP051370043 [XP] 1-15 * sections 1, 2 *
 [A]  - HUAWEI ET AL, "Support of flexible bandwidth", vol. RAN WG1, no. Lisbon, Portugal; 20161010 - 20161014, (20161009), 3GPP DRAFT; R1-1608841, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20161009), XP051148895 [A] 1-15 * the whole document *
International search[A]US2015078300  (XU HAO [US], et al) [A] 1-15 * See paragraphs [0049]-[0080]; and figure 6A. *;
 [Y]WO2016036142  (LG ELECTRONICS INC [KR]) [Y] 1-15 * See paragraphs [140]-[143]. *;
 [Y]  - ZTE et al., "Considerations on SS block design", RI-1611268, 3GPP TSG RAN WG1 Meeting #87, Reno, USA, (20161105), XP051189832 [Y] 1-15 * See sections 1, 2; and figure 1. *
 [Y]  - SAMSUNG, "Carrier raster and synchronization signal transmission", RI-1609114, 3GPP TSG RAN WG1 Meeting #86bis, Lisbon, Portugal, (20160930), XP051158429 [Y] 3, 7, 11, 15 * See section 2. *
 [A]  - SAMSUNG, "Multiplexing of synchronization signals and system information delivery channels for below 6 GHz and above 6 GHz", RI-1609111, 3GPP TSG RAN WG1 Meeting #86bis, Lisbon, Portugal, (20160930), XP051158427 [A] 1-15 * See sections 2, 3. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.