EP3551914 - FLOW AND PRESSURE STABILIZATION SYSTEMS, METHODS, AND DEVICES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.07.2022 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 30.07.2021 | ||
Former | Grant of patent is intended Status updated on 30.03.2021 | ||
Former | Request for examination was made Status updated on 13.09.2019 | ||
Former | The international publication has been made Status updated on 16.06.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Blacoh Fluid Controls, Inc. 601 Columbia Avenue Riverside, CA 92507 / US | [2019/42] | Inventor(s) | 01 /
MCCOMB, David, Dean c/o Blacoh Fluid Controls Inc. 601 Columbia Avenue Building D Riverside, CA 92507 / US | 02 /
YE, Alvin c/o Blacoh Fluid Controls Inc. 601 Columbia Avenue Building D Riverside, CA 92507 / US | 03 /
BURKE, James, Stanley c/o Blacoh Fluid Controls Inc. 601 Columbia Avenue Building D Riverside, CA 92507 / US | 04 /
DUNCAN, Gregory, Scott c/o Blacoh Fluid Controls Inc. 601 Columbia Avenue Building D Riverside, CA 92507 / US | [2019/42] | Representative(s) | Klickow & Wetzel PartGmbB Jessenstraße 4 22767 Hamburg / DE | [2019/42] | Application number, filing date | 17877774.4 | 01.12.2017 | [2019/42] | WO2017US64342 | Priority number, date | US201662430228P | 05.12.2016 Original published format: US 201662430228 P | [2019/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018106547 | Date: | 14.06.2018 | Language: | EN | [2018/24] | Type: | A1 Application with search report | No.: | EP3551914 | Date: | 16.10.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.06.2018 takes the place of the publication of the European patent application. | [2019/42] | Type: | B1 Patent specification | No.: | EP3551914 | Date: | 01.09.2021 | Language: | EN | [2021/35] | Search report(s) | International search report - published on: | US | 14.06.2018 | (Supplementary) European search report - dispatched on: | EP | 22.04.2020 | Classification | IPC: | G05D16/06, G05D16/04, F16K17/04, F16K31/126, F16K31/385, G05D7/01, F16K17/06 | [2020/21] | CPC: |
F16K31/126 (EP,US);
G05D16/0655 (US);
F15B13/00 (US);
F16K17/04 (EP,US);
F16K17/06 (EP,US);
F16K31/385 (EP,US);
F16K47/16 (US);
G05D16/0402 (EP,US);
G05D16/0658 (EP);
G05D7/0106 (EP,US)
(-)
|
Former IPC [2019/42] | F16K17/04, F16K31/126, F16K31/385, G05D16/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SYSTEME, VERFAHREN UND VORRICHTUNGEN ZUR FLUSS- UND DRUCKSTABILISIERUNG | [2019/42] | English: | FLOW AND PRESSURE STABILIZATION SYSTEMS, METHODS, AND DEVICES | [2019/42] | French: | SYSTÈMES, PROCÉDÉS ET DISPOSITIFS DE STABILISATION DE FLUX ET DE PRESSION | [2019/42] | Entry into regional phase | 18.06.2019 | National basic fee paid | 18.06.2019 | Search fee paid | 18.06.2019 | Designation fee(s) paid | 18.06.2019 | Examination fee paid | Examination procedure | 18.06.2019 | Examination requested [2019/42] | 16.11.2020 | Amendment by applicant (claims and/or description) | 31.03.2021 | Communication of intention to grant the patent | 26.07.2021 | Fee for grant paid | 26.07.2021 | Fee for publishing/printing paid | 26.07.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 02.06.2022 | No opposition filed within time limit [2022/32] | Fees paid | Renewal fee | 14.11.2019 | Renewal fee patent year 03 | 02.06.2021 | Renewal fee patent year 04 | Penalty fee | Additional fee for renewal fee | 31.12.2020 | 04   M06   Fee paid on   02.06.2021 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.12.2017 | AL | 01.09.2021 | AT | 01.09.2021 | CY | 01.09.2021 | CZ | 01.09.2021 | DK | 01.09.2021 | EE | 01.09.2021 | ES | 01.09.2021 | FI | 01.09.2021 | HR | 01.09.2021 | IT | 01.09.2021 | LT | 01.09.2021 | LV | 01.09.2021 | MC | 01.09.2021 | MK | 01.09.2021 | NL | 01.09.2021 | PL | 01.09.2021 | RO | 01.09.2021 | RS | 01.09.2021 | SE | 01.09.2021 | SI | 01.09.2021 | SK | 01.09.2021 | SM | 01.09.2021 | BG | 01.12.2021 | IE | 01.12.2021 | LU | 01.12.2021 | NO | 01.12.2021 | GR | 02.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | IS | 01.01.2022 | PT | 03.01.2022 | [2024/23] |
Former [2023/33] | HU | 01.12.2017 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2023/30] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2023/03] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2023/01] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
BE | 31.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/48] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
IE | 01.12.2021 | ||
LU | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/46] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
LU | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/36] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/33] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/29] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/25] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/24] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/21] | AT | 01.09.2021 | |
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/10] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/09] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/08] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/07] | LT | 01.09.2021 | |
NO | 01.12.2021 | Documents cited: | Search | [XAI]DE804635 (MAJERT RUDOLF GMBH) [X] 1,10-14 * figure 1 * [A] 7,8 [I] 2-6,9,15; | [XAI]US4802507 (WILLSON JAMES R [US]) [X] 1-3,6,13,14 * figure 1 * [A] 7,8[I] 4,5,9-12,15; | [XAI]US5065788 (MCMANIGAL PAUL G [US], et al) [X] 1,7,8,13,14 * figure 1 * [A] 2-6 [I] 9-12,15; | [XI]US6173735 (PERRY JR MARNEY DUNMAN [US], et al) [X] 1,7-13 * figures 1,4 * [I] 2-6,14,15 | International search | [X]GB668451 (SHELL REFINING & MARKETING CO) [X] 12, 15, 17-20 * ; figure 1; page 2, lines 24-99 *; | [XY]US3052378 (WRIGHT GEORGE W, et al) [X] 12, 13, 16 * ; figure 3; column 3, lines 60-63; column 4, lines 10-28 * [Y] 1-10; | [Y]US3418708 (SIVER CHESTER A) [Y] 5 * ; figures 1, 5; column 5, lines 6-18 *; | [XY]US3470910 (LOVELESS STANLEY M) [X] 12-14, 16-18 * ; figures 1, 2; column 4, lines 46-49; column 4, line 74 - column 5, line 12; column 7, lines 60-73 * [Y] 1-10; | [A]US4782204 (GARTLAND THOMAS J [US]) [A] 1-20* ; entire document *; | [A]US6386509 (MATSUZAWA HIRONORI [JP], et al) [A] 1-20 * ; entire document * | by applicant | DE804635 | US4802507 | US5065788 | US6173735 |