| EP3552680 - WATER TREATMENT APPARATUS COMPRISING A FILTER MODULE [Right-click to bookmark this link] | |||
| Former [2019/42] | FILTER MODULE FOR WATER TREATMENT APPARATUS, AND WATER TREATMENT APPARATUS COMPRISING SAID FILTER MODULE | ||
| [2022/02] | Status | No opposition filed within time limit Status updated on 17.02.2023 Database last updated on 10.03.2026 | |
| Former | The patent has been granted Status updated on 11.03.2022 | ||
| Former | Grant of patent is intended Status updated on 19.12.2021 | ||
| Former | Examination is in progress Status updated on 23.07.2021 | ||
| Former | Request for examination was made Status updated on 13.09.2019 | ||
| Former | The international publication has been made Status updated on 16.06.2018 | Most recent event Tooltip | 15.11.2024 | Change - lapse in a contracting state Updated state(s): BG | published on 18.12.2024 [2024/51] | Applicant(s) | For all designated states LG Electronics Inc. 128, Yeoui-daero Yeongdeungpo-gu Seoul 07336 / KR | [2019/42] | Inventor(s) | 01 /
CHOI, Yuseung IP Center LG Electronics Inc. 51 Gasan digital 1-ro Geumcheon-gu Seoul 08592 / KR | 02 /
LEE, Sangduck IP Center LG Electronics Inc. 51 Gasan digital 1-ro Geumcheon-gu Seoul 08592 / KR | 03 /
CHO, Suchang IP Center LG Electronics Inc. 51 Gasan digital 1-ro Geumcheon-gu Seoul 08592 / KR | [2019/42] | Representative(s) | Ter Meer Steinmeister & Partner Patentanwälte mbB Nymphenburger Straße 4 80335 München / DE | [2019/42] | Application number, filing date | 17878460.9 | 08.12.2017 | [2019/42] | WO2017KR14390 | Priority number, date | KR20160167765 | 09.12.2016 Original published format: KR 20160167765 | [2019/42] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018106061 | Date: | 14.06.2018 | Language: | KO | [2018/24] | Type: | A1 Application with search report | No.: | EP3552680 | Date: | 16.10.2019 | Language: | EN | [2019/42] | Type: | B1 Patent specification | No.: | EP3552680 | Date: | 13.04.2022 | Language: | EN | [2022/15] | Search report(s) | International search report - published on: | KR | 14.06.2018 | (Supplementary) European search report - dispatched on: | EP | 21.04.2020 | Classification | IPC: | C02F1/469, B01D35/06, B01D39/20, B01D35/16, B01D61/14, C02F1/44, B01D35/30, C02F1/28, B01J20/20, B01J20/28, C02F9/00, C02F1/461, // C02F101/20 | [2020/21] | CPC: |
C02F1/4691 (EP,KR);
B01D35/06 (EP,KR);
C02F1/4695 (US);
B01D15/203 (US);
B01D15/3885 (US);
B01D35/16 (EP,KR);
B01D35/30 (EP,KR);
B01D39/20 (EP);
B01D39/2062 (KR);
B01D61/14 (EP);
B01D61/145 (KR);
C02F1/283 (EP,US);
C02F1/444 (EP,KR);
C02F9/20 (EP);
C02F2001/46133 (EP);
C02F2001/46152 (EP);
C02F2101/20 (EP);
C02F2201/4613 (EP);
C02F2301/08 (EP);
C02F2303/04 (EP,US);
C02F2303/22 (US);
C02F2307/10 (EP)
(-)
|
| Former IPC [2019/42] | B01D35/06, B01D39/20, C02F1/469, B01D35/16, B01D61/14, C02F1/44, B01D35/30 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | WASSERBEHANDLUNGSVORRICHTUNG MIT EINEM FILTERMODUL | [2022/02] | English: | WATER TREATMENT APPARATUS COMPRISING A FILTER MODULE | [2022/02] | French: | APPAREIL DE TRAITEMENT D'EAU COMPRENANT UN MODULE DE FILTRE | [2022/02] |
| Former [2019/42] | FILTERMODUL FÜR WASSERBEHANDLUNGSVORRICHTUNG UND WASSERBEHANDLUNGSVORRICHTUNG MIT DIESEM FILTERMODUL | ||
| Former [2019/42] | FILTER MODULE FOR WATER TREATMENT APPARATUS, AND WATER TREATMENT APPARATUS COMPRISING SAID FILTER MODULE | ||
| Former [2019/42] | MODULE DE FILTRE POUR APPAREIL DE TRAITEMENT D'EAU, ET APPAREIL DE TRAITEMENT D'EAU COMPRENANT LEDIT MODULE DE FILTRE | Entry into regional phase | 01.07.2019 | Translation filed | 01.07.2019 | National basic fee paid | 01.07.2019 | Search fee paid | 01.07.2019 | Designation fee(s) paid | 01.07.2019 | Examination fee paid | Examination procedure | 01.07.2019 | Examination requested [2019/42] | 01.09.2020 | Amendment by applicant (claims and/or description) | 22.07.2021 | Despatch of a communication from the examining division (Time limit: M04) | 25.11.2021 | Reply to a communication from the examining division | 20.12.2021 | Communication of intention to grant the patent | 08.03.2022 | Fee for grant paid | 08.03.2022 | Fee for publishing/printing paid | 08.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 16.01.2023 | No opposition filed within time limit [2023/12] | Fees paid | Renewal fee | 23.12.2019 | Renewal fee patent year 03 | 24.12.2020 | Renewal fee patent year 04 | 24.12.2021 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.12.2017 | AL | 13.04.2022 | AT | 13.04.2022 | BG | 13.04.2022 | CY | 13.04.2022 | CZ | 13.04.2022 | DK | 13.04.2022 | EE | 13.04.2022 | ES | 13.04.2022 | FI | 13.04.2022 | HR | 13.04.2022 | LT | 13.04.2022 | LV | 13.04.2022 | MC | 13.04.2022 | MK | 13.04.2022 | MT | 13.04.2022 | NL | 13.04.2022 | PL | 13.04.2022 | RO | 13.04.2022 | RS | 13.04.2022 | SE | 13.04.2022 | SI | 13.04.2022 | SK | 13.04.2022 | SM | 13.04.2022 | TR | 13.04.2022 | NO | 13.07.2022 | GR | 14.07.2022 | IS | 13.08.2022 | PT | 16.08.2022 | GB | 08.12.2022 | IE | 08.12.2022 | LU | 08.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | FR | 31.12.2022 | LI | 31.12.2022 | [2024/51] |
| Former [2024/42] | HU | 08.12.2017 | |
| AL | 13.04.2022 | ||
| AT | 13.04.2022 | ||
| CY | 13.04.2022 | ||
| CZ | 13.04.2022 | ||
| DK | 13.04.2022 | ||
| EE | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| MC | 13.04.2022 | ||
| MK | 13.04.2022 | ||
| MT | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RO | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| SI | 13.04.2022 | ||
| SK | 13.04.2022 | ||
| SM | 13.04.2022 | ||
| TR | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| GB | 08.12.2022 | ||
| IE | 08.12.2022 | ||
| LU | 08.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| FR | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2024/29] | HU | 08.12.2017 | |
| AL | 13.04.2022 | ||
| AT | 13.04.2022 | ||
| CY | 13.04.2022 | ||
| CZ | 13.04.2022 | ||
| DK | 13.04.2022 | ||
| EE | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| MC | 13.04.2022 | ||
| MK | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RO | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| SI | 13.04.2022 | ||
| SK | 13.04.2022 | ||
| SM | 13.04.2022 | ||
| TR | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| GB | 08.12.2022 | ||
| IE | 08.12.2022 | ||
| LU | 08.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| FR | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2024/27] | HU | 08.12.2017 | |
| AL | 13.04.2022 | ||
| AT | 13.04.2022 | ||
| CY | 13.04.2022 | ||
| CZ | 13.04.2022 | ||
| DK | 13.04.2022 | ||
| EE | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| MK | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RO | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| SI | 13.04.2022 | ||
| SK | 13.04.2022 | ||
| SM | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| GB | 08.12.2022 | ||
| IE | 08.12.2022 | ||
| LU | 08.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| FR | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2024/21] | HU | 08.12.2017 | |
| AL | 13.04.2022 | ||
| AT | 13.04.2022 | ||
| CY | 13.04.2022 | ||
| CZ | 13.04.2022 | ||
| DK | 13.04.2022 | ||
| EE | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RO | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| SI | 13.04.2022 | ||
| SK | 13.04.2022 | ||
| SM | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| GB | 08.12.2022 | ||
| IE | 08.12.2022 | ||
| LU | 08.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| FR | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2024/18] | HU | 08.12.2017 | |
| AL | 13.04.2022 | ||
| AT | 13.04.2022 | ||
| CZ | 13.04.2022 | ||
| DK | 13.04.2022 | ||
| EE | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RO | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| SI | 13.04.2022 | ||
| SK | 13.04.2022 | ||
| SM | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| GB | 08.12.2022 | ||
| IE | 08.12.2022 | ||
| LU | 08.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| FR | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2023/52] | AL | 13.04.2022 | |
| AT | 13.04.2022 | ||
| CZ | 13.04.2022 | ||
| DK | 13.04.2022 | ||
| EE | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RO | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| SI | 13.04.2022 | ||
| SK | 13.04.2022 | ||
| SM | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| GB | 08.12.2022 | ||
| IE | 08.12.2022 | ||
| LU | 08.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| FR | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2023/49] | AL | 13.04.2022 | |
| AT | 13.04.2022 | ||
| CZ | 13.04.2022 | ||
| DK | 13.04.2022 | ||
| EE | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RO | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| SI | 13.04.2022 | ||
| SK | 13.04.2022 | ||
| SM | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| GB | 08.12.2022 | ||
| IE | 08.12.2022 | ||
| LU | 08.12.2022 | ||
| BE | 31.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2023/48] | AL | 13.04.2022 | |
| AT | 13.04.2022 | ||
| CZ | 13.04.2022 | ||
| DK | 13.04.2022 | ||
| EE | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RO | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| SI | 13.04.2022 | ||
| SK | 13.04.2022 | ||
| SM | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| GB | 08.12.2022 | ||
| IE | 08.12.2022 | ||
| LU | 08.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2023/47] | AL | 13.04.2022 | |
| AT | 13.04.2022 | ||
| CZ | 13.04.2022 | ||
| DK | 13.04.2022 | ||
| EE | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RO | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| SI | 13.04.2022 | ||
| SK | 13.04.2022 | ||
| SM | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| GB | 08.12.2022 | ||
| LU | 08.12.2022 | ||
| CH | 31.12.2022 | ||
| LI | 31.12.2022 | ||
| Former [2023/38] | AL | 13.04.2022 | |
| AT | 13.04.2022 | ||
| CZ | 13.04.2022 | ||
| DK | 13.04.2022 | ||
| EE | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RO | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| SI | 13.04.2022 | ||
| SK | 13.04.2022 | ||
| SM | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| LU | 08.12.2022 | ||
| Former [2023/25] | AL | 13.04.2022 | |
| AT | 13.04.2022 | ||
| CZ | 13.04.2022 | ||
| DK | 13.04.2022 | ||
| EE | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RO | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| SI | 13.04.2022 | ||
| SK | 13.04.2022 | ||
| SM | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| Former [2023/17] | AL | 13.04.2022 | |
| AT | 13.04.2022 | ||
| CZ | 13.04.2022 | ||
| DK | 13.04.2022 | ||
| EE | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RO | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| SK | 13.04.2022 | ||
| SM | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| Former [2023/09] | AT | 13.04.2022 | |
| CZ | 13.04.2022 | ||
| DK | 13.04.2022 | ||
| EE | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RO | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| SK | 13.04.2022 | ||
| SM | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| Former [2023/07] | AT | 13.04.2022 | |
| DK | 13.04.2022 | ||
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| Former [2022/51] | AT | 13.04.2022 | |
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| IS | 13.08.2022 | ||
| PT | 16.08.2022 | ||
| Former [2022/50] | AT | 13.04.2022 | |
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| PL | 13.04.2022 | ||
| RS | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| PT | 16.08.2022 | ||
| Former [2022/49] | AT | 13.04.2022 | |
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| HR | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| LV | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| BG | 13.07.2022 | ||
| NO | 13.07.2022 | ||
| GR | 14.07.2022 | ||
| PT | 16.08.2022 | ||
| Former [2022/47] | AT | 13.04.2022 | |
| ES | 13.04.2022 | ||
| FI | 13.04.2022 | ||
| LT | 13.04.2022 | ||
| NL | 13.04.2022 | ||
| SE | 13.04.2022 | ||
| NO | 13.07.2022 | ||
| PT | 16.08.2022 | ||
| Former [2022/44] | NL | 13.04.2022 | Documents cited: | Search | [XI] US2015299002 (SMITH MARK FORREST et al.) [X] 1-5,10 * paragraph [0018] - paragraph [0021] * * paragraph [0023] - paragraph [0027] * * paragraph [0028] * * paragraph [0030] - paragraph [0031] * * paragraph [0034] - paragraph [0040] * * paragraph [0043] * * paragraph [0048] * * paragraph [0075] - paragraph [0077] * * paragraph [0080] * * paragraph [0086] * * figures 1-2 *[I] 6-9,11-15 | [XI] WO0109907 (ANDELMAN MARC D et al.) [X] 1-5,10 * page 3, lines 4-27 * * page 6, lines 3-12 * * page 7, line 1 - page 10, line 10 * * page 11, line 4 - page 13, line 9 * * page 14; example 4 * * figures 1-2 *[I] 6-9,11-15 | [XI] EP2098485 (SAMSUNG ELECTRONICS CO LTD et al.) [X] 1-5,10 * figures 1-6 * * paragraphs [0001] , [0008] - [0019] - [0049] - [0075] *[I] 6-9,11-15 | [I] WO2012161534 (WOONGJIN COWAY CO LTD et al.) [I] 1-15 * paragraphs [0001] - [0003] * * paragraphs [0023] - [0026] * * paragraphs [0095] - [0096] * * paragraphs [0097] - [0100] * * paragraph [0101] * * paragraphs [0108] - [0112] * * paragraph [0116] * * paragraphs [0165] - [0168] * * figures 1-8 * | [I] US2013277222 (KWON CLAUDE et al.) [I] 1-15 * figures 1-9 * * paragraphs [0001] , [0006] - [0009] - [0060] - [0071] - [0078] - [0092] * | International search | [XY] KR20120032100 (KOREA ELECTRIC POWER CORP et al.) [X] 1-5 * See paragraphs [0001], [0010], [0014], [0022], [0029]-[0033]; claims 6, 7; and figure 1. *[Y] 6-9 | [Y] KR101110709 [Y] 6-9 * See abstract; paragraphs [0021], [0033]; and figure 3. * | [A] KR100953085 (JA CON CO LTD et al.) [A] 1-9 * See the entire document. * | [A] KR20150059202 (CHEONGYEON et al.) [A] 1-9 * See the entire document. * | [A] US2015299002 (SMITH MARK FORREST et al.) [A] 1-9 * See the entire document. * |