Extract from the Register of European Patents

EP About this file: EP3552680

EP3552680 - WATER TREATMENT APPARATUS COMPRISING A FILTER MODULE [Right-click to bookmark this link]
Former [2019/42]FILTER MODULE FOR WATER TREATMENT APPARATUS, AND WATER TREATMENT APPARATUS COMPRISING SAID FILTER MODULE
[2022/02]
StatusNo opposition filed within time limit
Status updated on  17.02.2023
Database last updated on 10.03.2026
FormerThe patent has been granted
Status updated on  11.03.2022
FormerGrant of patent is intended
Status updated on  19.12.2021
FormerExamination is in progress
Status updated on  23.07.2021
FormerRequest for examination was made
Status updated on  13.09.2019
FormerThe international publication has been made
Status updated on  16.06.2018
Most recent event   Tooltip15.11.2024Change - lapse in a contracting state
Updated state(s): BG
published on 18.12.2024  [2024/51]
Applicant(s)For all designated states
LG Electronics Inc.
128, Yeoui-daero
Yeongdeungpo-gu
Seoul 07336 / KR
[2019/42]
Inventor(s)01 / CHOI, Yuseung
IP Center
LG Electronics Inc.
51 Gasan digital 1-ro
Geumcheon-gu
Seoul 08592 / KR
02 / LEE, Sangduck
IP Center
LG Electronics Inc.
51 Gasan digital 1-ro
Geumcheon-gu
Seoul 08592 / KR
03 / CHO, Suchang
IP Center
LG Electronics Inc.
51 Gasan digital 1-ro
Geumcheon-gu
Seoul 08592 / KR
 [2019/42]
Representative(s)Ter Meer Steinmeister & Partner
Patentanwälte mbB
Nymphenburger Straße 4
80335 München / DE
[2019/42]
Application number, filing date17878460.908.12.2017
[2019/42]
WO2017KR14390
Priority number, dateKR2016016776509.12.2016         Original published format: KR 20160167765
[2019/42]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018106061
Date:14.06.2018
Language:KO
[2018/24]
Type: A1 Application with search report 
No.:EP3552680
Date:16.10.2019
Language:EN
[2019/42]
Type: B1 Patent specification 
No.:EP3552680
Date:13.04.2022
Language:EN
[2022/15]
Search report(s)International search report - published on:KR14.06.2018
(Supplementary) European search report - dispatched on:EP21.04.2020
ClassificationIPC:C02F1/469, B01D35/06, B01D39/20, B01D35/16, B01D61/14, C02F1/44, B01D35/30, C02F1/28, B01J20/20, B01J20/28, C02F9/00, C02F1/461, // C02F101/20
[2020/21]
CPC:
C02F1/4691 (EP,KR); B01D35/06 (EP,KR); C02F1/4695 (US);
B01D15/203 (US); B01D15/3885 (US); B01D35/16 (EP,KR);
B01D35/30 (EP,KR); B01D39/20 (EP); B01D39/2062 (KR);
B01D61/14 (EP); B01D61/145 (KR); C02F1/283 (EP,US);
C02F1/444 (EP,KR); C02F9/20 (EP); C02F2001/46133 (EP);
C02F2001/46152 (EP); C02F2101/20 (EP); C02F2201/4613 (EP);
C02F2301/08 (EP); C02F2303/04 (EP,US); C02F2303/22 (US);
C02F2307/10 (EP) (-)
Former IPC [2019/42]B01D35/06, B01D39/20, C02F1/469, B01D35/16, B01D61/14, C02F1/44, B01D35/30
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/42]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:WASSERBEHANDLUNGSVORRICHTUNG MIT EINEM FILTERMODUL[2022/02]
English:WATER TREATMENT APPARATUS COMPRISING A FILTER MODULE[2022/02]
French:APPAREIL DE TRAITEMENT D'EAU COMPRENANT UN MODULE DE FILTRE[2022/02]
Former [2019/42]FILTERMODUL FÜR WASSERBEHANDLUNGSVORRICHTUNG UND WASSERBEHANDLUNGSVORRICHTUNG MIT DIESEM FILTERMODUL
Former [2019/42]FILTER MODULE FOR WATER TREATMENT APPARATUS, AND WATER TREATMENT APPARATUS COMPRISING SAID FILTER MODULE
Former [2019/42]MODULE DE FILTRE POUR APPAREIL DE TRAITEMENT D'EAU, ET APPAREIL DE TRAITEMENT D'EAU COMPRENANT LEDIT MODULE DE FILTRE
Entry into regional phase01.07.2019Translation filed 
01.07.2019National basic fee paid 
01.07.2019Search fee paid 
01.07.2019Designation fee(s) paid 
01.07.2019Examination fee paid 
Examination procedure01.07.2019Examination requested  [2019/42]
01.09.2020Amendment by applicant (claims and/or description)
22.07.2021Despatch of a communication from the examining division (Time limit: M04)
25.11.2021Reply to a communication from the examining division
20.12.2021Communication of intention to grant the patent
08.03.2022Fee for grant paid
08.03.2022Fee for publishing/printing paid
08.03.2022Receipt of the translation of the claim(s)
Opposition(s)16.01.2023No opposition filed within time limit [2023/12]
Fees paidRenewal fee
23.12.2019Renewal fee patent year 03
24.12.2020Renewal fee patent year 04
24.12.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.12.2017
AL13.04.2022
AT13.04.2022
BG13.04.2022
CY13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
MC13.04.2022
MK13.04.2022
MT13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SI13.04.2022
SK13.04.2022
SM13.04.2022
TR13.04.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
GB08.12.2022
IE08.12.2022
LU08.12.2022
BE31.12.2022
CH31.12.2022
FR31.12.2022
LI31.12.2022
[2024/51]
Former [2024/42]HU08.12.2017
AL13.04.2022
AT13.04.2022
CY13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
MC13.04.2022
MK13.04.2022
MT13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SI13.04.2022
SK13.04.2022
SM13.04.2022
TR13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
GB08.12.2022
IE08.12.2022
LU08.12.2022
BE31.12.2022
CH31.12.2022
FR31.12.2022
LI31.12.2022
Former [2024/29]HU08.12.2017
AL13.04.2022
AT13.04.2022
CY13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
MC13.04.2022
MK13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SI13.04.2022
SK13.04.2022
SM13.04.2022
TR13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
GB08.12.2022
IE08.12.2022
LU08.12.2022
BE31.12.2022
CH31.12.2022
FR31.12.2022
LI31.12.2022
Former [2024/27]HU08.12.2017
AL13.04.2022
AT13.04.2022
CY13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
MK13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SI13.04.2022
SK13.04.2022
SM13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
GB08.12.2022
IE08.12.2022
LU08.12.2022
BE31.12.2022
CH31.12.2022
FR31.12.2022
LI31.12.2022
Former [2024/21]HU08.12.2017
AL13.04.2022
AT13.04.2022
CY13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SI13.04.2022
SK13.04.2022
SM13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
GB08.12.2022
IE08.12.2022
LU08.12.2022
BE31.12.2022
CH31.12.2022
FR31.12.2022
LI31.12.2022
Former [2024/18]HU08.12.2017
AL13.04.2022
AT13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SI13.04.2022
SK13.04.2022
SM13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
GB08.12.2022
IE08.12.2022
LU08.12.2022
BE31.12.2022
CH31.12.2022
FR31.12.2022
LI31.12.2022
Former [2023/52]AL13.04.2022
AT13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SI13.04.2022
SK13.04.2022
SM13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
GB08.12.2022
IE08.12.2022
LU08.12.2022
BE31.12.2022
CH31.12.2022
FR31.12.2022
LI31.12.2022
Former [2023/49]AL13.04.2022
AT13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SI13.04.2022
SK13.04.2022
SM13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
GB08.12.2022
IE08.12.2022
LU08.12.2022
BE31.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/48]AL13.04.2022
AT13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SI13.04.2022
SK13.04.2022
SM13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
GB08.12.2022
IE08.12.2022
LU08.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/47]AL13.04.2022
AT13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SI13.04.2022
SK13.04.2022
SM13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
GB08.12.2022
LU08.12.2022
CH31.12.2022
LI31.12.2022
Former [2023/38]AL13.04.2022
AT13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SI13.04.2022
SK13.04.2022
SM13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
LU08.12.2022
Former [2023/25]AL13.04.2022
AT13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SI13.04.2022
SK13.04.2022
SM13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
Former [2023/17]AL13.04.2022
AT13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SK13.04.2022
SM13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
Former [2023/09]AT13.04.2022
CZ13.04.2022
DK13.04.2022
EE13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
PL13.04.2022
RO13.04.2022
RS13.04.2022
SE13.04.2022
SK13.04.2022
SM13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
Former [2023/07]AT13.04.2022
DK13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
PL13.04.2022
RS13.04.2022
SE13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
Former [2022/51]AT13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
PL13.04.2022
RS13.04.2022
SE13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
IS13.08.2022
PT16.08.2022
Former [2022/50]AT13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
PL13.04.2022
RS13.04.2022
SE13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
PT16.08.2022
Former [2022/49]AT13.04.2022
ES13.04.2022
FI13.04.2022
HR13.04.2022
LT13.04.2022
LV13.04.2022
NL13.04.2022
SE13.04.2022
BG13.07.2022
NO13.07.2022
GR14.07.2022
PT16.08.2022
Former [2022/47]AT13.04.2022
ES13.04.2022
FI13.04.2022
LT13.04.2022
NL13.04.2022
SE13.04.2022
NO13.07.2022
PT16.08.2022
Former [2022/44]NL13.04.2022
Documents cited:Search[XI] US2015299002  (SMITH MARK FORREST et al.) [X] 1-5,10 * paragraph [0018] - paragraph [0021] * * paragraph [0023] - paragraph [0027] * * paragraph [0028] * * paragraph [0030] - paragraph [0031] * * paragraph [0034] - paragraph [0040] * * paragraph [0043] * * paragraph [0048] * * paragraph [0075] - paragraph [0077] * * paragraph [0080] * * paragraph [0086] * * figures 1-2 *[I] 6-9,11-15
 [XI] WO0109907  (ANDELMAN MARC D et al.) [X] 1-5,10 * page 3, lines 4-27 * * page 6, lines 3-12 * * page 7, line 1 - page 10, line 10 * * page 11, line 4 - page 13, line 9 * * page 14; example 4 * * figures 1-2 *[I] 6-9,11-15
 [XI] EP2098485  (SAMSUNG ELECTRONICS CO LTD et al.) [X] 1-5,10 * figures 1-6 * * paragraphs [0001] , [0008] - [0019] - [0049] - [0075] *[I] 6-9,11-15
 [I] WO2012161534  (WOONGJIN COWAY CO LTD et al.) [I] 1-15 * paragraphs [0001] - [0003] * * paragraphs [0023] - [0026] * * paragraphs [0095] - [0096] * * paragraphs [0097] - [0100] * * paragraph [0101] * * paragraphs [0108] - [0112] * * paragraph [0116] * * paragraphs [0165] - [0168] * * figures 1-8 *
 [I] US2013277222  (KWON CLAUDE et al.) [I] 1-15 * figures 1-9 * * paragraphs [0001] , [0006] - [0009] - [0060] - [0071] - [0078] - [0092] *
International search[XY] KR20120032100  (KOREA ELECTRIC POWER CORP et al.) [X] 1-5 * See paragraphs [0001], [0010], [0014], [0022], [0029]-[0033]; claims 6, 7; and figure 1. *[Y] 6-9
 [Y] KR101110709   [Y] 6-9 * See abstract; paragraphs [0021], [0033]; and figure 3. *
 [A] KR100953085  (JA CON CO LTD et al.) [A] 1-9 * See the entire document. *
 [A] KR20150059202  (CHEONGYEON et al.) [A] 1-9 * See the entire document. *
 [A] US2015299002  (SMITH MARK FORREST et al.) [A] 1-9 * See the entire document. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.