Extract from the Register of European Patents

EP About this file: EP3561142

EP3561142 - HOT PRESS FORMING PLATED STEEL SHEET HAVING EXCELLENT IMPACT PROPERTY, HOT PRESS MOLDING MEMBER, AND MANUFACTURING METHOD THEREOF [Right-click to bookmark this link]
StatusThe patent has been granted
Status updated on  15.01.2021
Database last updated on 11.04.2026
FormerGrant of patent is intended
Status updated on  24.08.2020
FormerRequest for examination was made
Status updated on  27.09.2019
FormerThe international publication has been made
Status updated on  30.06.2018
Most recent event   Tooltip16.03.2026New entry: Despatch of examination report in opposition + time limit 
Applicant(s)For all designated states
POSCO Co., Ltd
6261, Donghaean-ro
Nam-gu
Pohang-si, Gyeongsangbuk-do 37859 / KR
[2026/05]
Former [2026/04]For all designated states
POSCO Holdings Inc.
440, Teheran-ro
Gangnam-gu
Seoul 06194 / KR
Former [2019/44]For all designated states
Posco
(Goedong-dong)
6261 Donghaean-ro
Nam-gu
Pohang-si, Gyeongsangbuk-do 37859 / KR
Inventor(s)01 / KIM, Seong-Woo
c/o Gwangyang Iron&Steel Works
20-26 Pokposarang-gil
Gwangyang-si Jeollanam-do 57807 / KR
02 / OH, Jin-Keun
c/o Gwangyang Iron&Steel Works
20-26 Pokposarang-gil
Gwangyang-si Jeollanam-do 57807 / KR
03 / CHO, Yeol-Rae
c/o Gwangyang Iron&Steel Works
20-26 Pokposarang-gil
Gwangyang-si Jeollanam-do 57807 / KR
 [2019/44]
Representative(s)Meissner Bolte Partnerschaft mbB
Patentanwälte Rechtsanwälte
Postfach 86 06 24
81633 München / DE
[N/P]
Former [2019/44]Zech, Stefan Markus
Meissner Bolte Patentanwälte
Rechtsanwälte Partnerschaft mbB
Postfach 86 06 24
81633 München / DE
Application number, filing date17883493.315.12.2017
[2019/44]
WO2017KR14843
Priority number, dateKR2016017823623.12.2016         Original published format: KR 20160178236
[2019/44]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018117543
Date:28.06.2018
Language:KO
[2018/26]
Type: A1 Application with search report 
No.:EP3561142
Date:30.10.2019
Language:EN
[2019/44]
Type: B1 Patent specification 
No.:EP3561142
Date:17.02.2021
Language:EN
[2021/07]
Search report(s)International search report - published on:KR28.06.2018
(Supplementary) European search report - dispatched on:EP06.12.2019
ClassificationIPC:C23C2/28, C23C2/12, C23C2/40, C23C2/02, C23C2/26, C22C38/04, C22C38/38, C22C21/02, C21D8/02
[2019/44]
CPC:
C22C38/02 (EP,US); C21D8/0226 (EP,KR,US); C21D9/46 (EP,KR,US);
B32B15/012 (EP,US); C21D1/18 (EP); C21D1/26 (EP);
C21D1/673 (EP); C21D1/76 (EP); C21D3/04 (EP);
C21D6/002 (US); C21D6/005 (US); C21D6/008 (US);
C21D7/13 (EP); C21D8/02 (EP,US); C21D8/0257 (EP);
C21D8/0263 (EP,KR); C21D8/0278 (EP); C22C21/02 (KR,US);
C22C38/001 (US); C22C38/002 (US); C22C38/04 (EP,KR);
C22C38/06 (US); C22C38/22 (EP,US); C22C38/24 (EP,US);
C22C38/26 (EP,US); C22C38/28 (EP,US); C22C38/32 (EP,US);
C22C38/38 (EP,KR,US); C23C2/02 (EP,KR,US); C23C2/0224 (EP,KR,US);
C23C2/024 (EP,KR,US); C23C2/12 (EP,KR,US); C23C2/28 (EP,KR,US);
C23C2/29 (EP,KR,US); C23C2/40 (EP,KR,US); C23C30/00 (EP);
C21D2211/001 (US); C21D2211/005 (EP,US); C21D2211/008 (US);
C21D2211/009 (EP,US); Y10T428/12757 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/44]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:HEISSGEPRESSTES PLATTIERTES STAHLBLECH MIT HERVORRAGENDER SCHLAGFESTIGKEIT, HEISSPRESSFORMELEMENT UND HERSTELLUNGSVERFAHREN DAFÜR[2019/44]
English:HOT PRESS FORMING PLATED STEEL SHEET HAVING EXCELLENT IMPACT PROPERTY, HOT PRESS MOLDING MEMBER, AND MANUFACTURING METHOD THEREOF[2019/44]
French:TÔLE D'ACIER PLAQUÉE PAR PRESSAGE À CHAUD DOTÉE D'UNE RÉSISTANCE ÉLEVÉE AUX CHOCS, ÉLÉMENT DE MOULAGE PAR PRESSAGE À CHAUD ET SON PROCÉDÉ DE FABRICATION[2019/44]
Entry into regional phase19.07.2019Translation filed 
19.07.2019National basic fee paid 
19.07.2019Search fee paid 
19.07.2019Designation fee(s) paid 
19.07.2019Examination fee paid 
Examination procedure19.07.2019Examination requested  [2019/44]
08.07.2020Amendment by applicant (claims and/or description)
25.08.2020Communication of intention to grant the patent
30.12.2020Fee for grant paid
30.12.2020Fee for publishing/printing paid
30.12.2020Receipt of the translation of the claim(s)
Opposition(s)Opponent(s)01  16.11.2021  23.11.2021  ADMISSIBLE
ArcelorMittal
24-26, Boulevard d'Avranches
1160 Luxembourg / LU
Opponent's representative
Lavoix
2, place d'Estienne d'Orves
75441 Paris Cedex 09 / FR
 [2023/03]
Former [2021/51]
Opponent(s)01  16.11.2021   
ArcelorMittal
24-26, Boulevard d'Avranches
1160 Luxembourg / LU
Opponent's representative
Plaisant, Sophie Marie
ArcelorMittal France
Research & Development
Intellectual Property
6, rue André Campra
93200 Saint-Denis / FR
29.11.2021Invitation to proprietor to file observations on the notice of opposition
08.04.2022Reply of patent proprietor to notice(s) of opposition
09.11.2023Date of oral proceedings
29.11.2023Despatch of interlocutory decision in opposition
29.11.2023Despatch of minutes of oral proceedings
16.03.2026Despatch of a communication from the opposition division (Time limit: M04)
Appeal following opposition29.01.2024Appeal received No.  T0117/24
29.01.2024Payment of appeal fee
28.03.2024Statement of grounds filed
06.11.2025Result of appeal procedure: maintenance in amended form
22.12.2025Despatch of the decision of the Board of Appeal
19.01.2024Appeal received No.  T0117/24
19.01.2024Payment of appeal fee
27.03.2024Statement of grounds filed
06.11.2025Result of appeal procedure: maintenance in amended form
22.12.2025Despatch of the decision of the Board of Appeal
06.11.2025Date of oral proceedings
Fees paidRenewal fee
26.12.2019Renewal fee patent year 03
24.12.2020Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.12.2017
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
MT17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
TR17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.12.2021
IE15.12.2021
BE31.12.2021
CH31.12.2021
LI31.12.2021
[2026/04]
Former [2024/42]HU15.12.2017
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
MT17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.12.2021
IE15.12.2021
BE31.12.2021
CH31.12.2021
LI31.12.2021
Former [2024/23]HU15.12.2017
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
MK17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.12.2021
IE15.12.2021
BE31.12.2021
CH31.12.2021
LI31.12.2021
Former [2023/33]HU15.12.2017
AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.12.2021
IE15.12.2021
BE31.12.2021
CH31.12.2021
LI31.12.2021
Former [2023/30]AL17.02.2021
AT17.02.2021
CY17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.12.2021
IE15.12.2021
BE31.12.2021
CH31.12.2021
LI31.12.2021
Former [2023/03]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.12.2021
IE15.12.2021
BE31.12.2021
CH31.12.2021
LI31.12.2021
Former [2023/01]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.12.2021
IE15.12.2021
BE31.12.2021
Former [2022/48]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.12.2021
IE15.12.2021
Former [2022/47]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
GB15.12.2021
Former [2022/33]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
MC17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/23]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
IT17.02.2021
LT17.02.2021
LV17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/13]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SI17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
IS22.12.2021
Former [2022/10]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
IS22.12.2021
Former [2022/08]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
ES17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2022/07]AL17.02.2021
AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/50]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
PL17.02.2021
RO17.02.2021
RS17.02.2021
SE17.02.2021
SK17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/49]AT17.02.2021
CZ17.02.2021
DK17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/48]AT17.02.2021
CZ17.02.2021
EE17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/46]AT17.02.2021
FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
SM17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/42]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
IS17.06.2021
PT17.06.2021
Former [2021/39]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
PL17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/38]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
RS17.02.2021
SE17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/37]FI17.02.2021
HR17.02.2021
LT17.02.2021
LV17.02.2021
RS17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/36]FI17.02.2021
HR17.02.2021
LT17.02.2021
BG17.05.2021
NO17.05.2021
GR18.05.2021
PT17.06.2021
Former [2021/35]FI17.02.2021
HR17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Former [2021/33]FI17.02.2021
LT17.02.2021
NO17.05.2021
PT17.06.2021
Documents cited:Search[XA] US2016362763  (OH JIN-KEUN et al.)
International search[A] US6296805  (LAURENT JEAN-PIERRE et al.) [A] 1-19
 [A] KR20160078852  (POSCO et al.) [A] 1-19
 [A] KR20100047011  (HYUNDAI STEEL CO et al.) [A] 1-19
 [A] KR100723157  (POSCO et al.) [A] 1-19
 [A] KR20090070150  (POSCO et al.) [A] 1-19
by applicantUS6296805
 KR20100047011
OppositionUS2016017452
 EP2086755
   MALINOWSKI ZBIGNIEW: "Implementation of the axially symmetrical and three dimensional finite element models to the determination of the heat transfer coefficient distribution on the hot plate surface cooled by the water spray nozzle", KEY ENGINEERING MATERIALS, vol. 504-506, 14 March 2012 (2012-03-14), pages 1055 - 1060, XP055873139
   HONDA TATSURO, ET AL: "Temperature Measurement Technology in Water Cooling Process and High Accuracy Cooling Control Technology for High Tensile Hot Rolled Strip", NIPPON STEEL & SUMITOMO METAL TECHNICAL REPORT, vol. 111, 1 March 2016 (2016-03-01), pages 18 - 23, XP055873141
   BRANGER, GRARD ET AL (EDS.): "The book of Steel. Excerpt", pages 1221 - 1225
   QUANTIN DANILE: "Galvanisation a chaud - Procds", TECHNIQUES DE I'INGNIEUR, vol. M 1531, 10 September 2004 (2004-09-10), pages 1 - 24, XP055873143
   BUSCARLET ERIC: "Techniques de l'Ingenieur : Galvanisation et aluminiage en continu", LES SELECTIONS, no. M1536, 10 April 1996 (1996-04-10), pages 1 - 20, XP055841275
   WANG JEFF, ET AL: "Effect of Prior Austenite Grain Size on Impact Toughness of Press Hardened Steel", SAE INT. J. MATER. MANF., vol. 9, no. 2, 1 May 2016 (2016-05-01), pages 488 - 493, XP055872909
   M. SUEHIRO, K. KUSUMI, T. MIYAKOSHI, J. MAKI, M. OHGAMI: "Properties of aluminium-coated steels for hot forming", NIPPON STEEL TECHNICAL REPORT OVERSEAS, no. 88, 1 July 2003 (2003-07-01), JP , pages 16 - 21, XP002393305, ISSN: 0300-306X
   SINGH JHAJJ KAMALPREET: "Heat Transfer Modeling of Roller Hearth and Muffle Furnace", THESIS UNIVERSITY OF WATERLOO, 1 January 2015 (2015-01-01), pages 1 - 53, XP055808280
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.