| EP3556666 - DEPLOYABLE RADIATOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.01.2024 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 03.02.2023 | ||
| Former | Grant of patent is intended Status updated on 13.09.2022 | ||
| Former | Examination is in progress Status updated on 22.07.2022 | ||
| Former | Grant of patent is intended Status updated on 22.03.2022 | ||
| Former | Examination is in progress Status updated on 26.11.2020 | ||
| Former | Request for examination was made Status updated on 20.09.2019 | ||
| Former | The international publication has been made Status updated on 30.06.2018 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Mitsubishi Electric Corporation 7-3, Marunouchi 2-chome Chiyoda-ku Tokyo 100-8310 / JP | [2019/43] | Inventor(s) | 01 /
KAWAMURA, Shunichi c/o Mitsubishi Electric Corporation 7-3, Marunouchi 2-chome Chiyoda-ku Tokyo 100-8310 / JP | [2019/43] | Representative(s) | Meissner Bolte Partnerschaft mbB Patentanwälte Rechtsanwälte Postfach 86 06 24 81633 München / DE | [N/P] |
| Former [2019/43] | Sajda, Wolf E. Meissner Bolte Patentanwälte Rechtsanwälte Partnerschaft mbB Postfach 86 06 24 81633 München / DE | Application number, filing date | 17884097.1 | 09.03.2017 | [2019/43] | WO2017JP09513 | Priority number, date | JP20160245932 | 19.12.2016 Original published format: JP 2016245932 | [2019/43] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018116490 | Date: | 28.06.2018 | Language: | JA | [2018/26] | Type: | A1 Application with search report | No.: | EP3556666 | Date: | 23.10.2019 | Language: | EN | [2019/43] | Type: | B1 Patent specification | No.: | EP3556666 | Date: | 08.03.2023 | Language: | EN | [2023/10] | Search report(s) | International search report - published on: | JP | 28.06.2018 | (Supplementary) European search report - dispatched on: | EP | 10.10.2019 | Classification | IPC: | B64G1/50, // B64G1/58 | [2019/46] | CPC: |
B64G1/503 (EP,US);
B23P15/26 (US);
B64G1/44 (US);
B64G1/506 (US);
B64G1/58 (EP)
|
| Former IPC [2019/43] | B64G1/50 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ENTFALTBARER RADIATOR | [2019/43] | English: | DEPLOYABLE RADIATOR | [2019/43] | French: | RADIATEUR DÉPLOYABLE | [2019/43] | Entry into regional phase | 13.06.2019 | Translation filed | 13.06.2019 | National basic fee paid | 13.06.2019 | Search fee paid | 13.06.2019 | Designation fee(s) paid | 13.06.2019 | Examination fee paid | Examination procedure | 13.06.2019 | Examination requested [2019/43] | 27.04.2020 | Amendment by applicant (claims and/or description) | 25.11.2020 | Despatch of a communication from the examining division (Time limit: M04) | 01.04.2021 | Reply to a communication from the examining division | 19.07.2021 | Despatch of a communication from the examining division (Time limit: M04) | 19.11.2021 | Reply to a communication from the examining division | 23.03.2022 | Communication of intention to grant the patent | 21.07.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 21.07.2022 | Fee for grant paid | 21.07.2022 | Fee for publishing/printing paid | 21.09.2022 | Communication of intention to grant the patent | 23.01.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 11.12.2023 | No opposition filed within time limit [2024/07] | Fees paid | Renewal fee | 27.06.2019 | Renewal fee patent year 03 | 12.03.2020 | Renewal fee patent year 04 | 12.03.2021 | Renewal fee patent year 05 | 22.02.2022 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 09.03.2017 | HU | 09.03.2017 | AT | 08.03.2023 | BG | 08.03.2023 | CZ | 08.03.2023 | DK | 08.03.2023 | EE | 08.03.2023 | ES | 08.03.2023 | FI | 08.03.2023 | HR | 08.03.2023 | IT | 08.03.2023 | LT | 08.03.2023 | LV | 08.03.2023 | MC | 08.03.2023 | NL | 08.03.2023 | PL | 08.03.2023 | RO | 08.03.2023 | RS | 08.03.2023 | SE | 08.03.2023 | SI | 08.03.2023 | SK | 08.03.2023 | SM | 08.03.2023 | TR | 08.03.2023 | IE | 09.03.2023 | LU | 09.03.2023 | BE | 31.03.2023 | CH | 31.03.2023 | LI | 31.03.2023 | GB | 08.06.2023 | NO | 08.06.2023 | GR | 09.06.2023 | IS | 08.07.2023 | PT | 10.07.2023 | [2026/04] |
| Former [2025/39] | CY | 09.03.2017 | |
| HU | 09.03.2017 | ||
| AT | 08.03.2023 | ||
| BG | 08.03.2023 | ||
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| IT | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| IE | 09.03.2023 | ||
| LU | 09.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| GB | 08.06.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| Former [2025/36] | CY | 09.03.2017 | |
| AT | 08.03.2023 | ||
| BG | 08.03.2023 | ||
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| IT | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| IE | 09.03.2023 | ||
| LU | 09.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| GB | 08.06.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| Former [2024/51] | AT | 08.03.2023 | |
| BG | 08.03.2023 | ||
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| IT | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| IE | 09.03.2023 | ||
| LU | 09.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| GB | 08.06.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| Former [2024/26] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| IT | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| IE | 09.03.2023 | ||
| LU | 09.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| GB | 08.06.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| Former [2024/24] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| IE | 09.03.2023 | ||
| LU | 09.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| GB | 08.06.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| Former [2024/10] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SI | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| IE | 09.03.2023 | ||
| LU | 09.03.2023 | ||
| BE | 31.03.2023 | ||
| CH | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| Former [2024/09] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| DK | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| IE | 09.03.2023 | ||
| LU | 09.03.2023 | ||
| CH | 31.03.2023 | ||
| LI | 31.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| Former [2024/08] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| MC | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| IE | 09.03.2023 | ||
| LU | 09.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| Former [2024/02] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| LU | 09.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| Former [2023/50] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| PL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SK | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| IS | 08.07.2023 | ||
| PT | 10.07.2023 | ||
| Former [2023/49] | AT | 08.03.2023 | |
| CZ | 08.03.2023 | ||
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| RO | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| PT | 10.07.2023 | ||
| Former [2023/48] | AT | 08.03.2023 | |
| EE | 08.03.2023 | ||
| ES | 08.03.2023 | ||
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| PT | 10.07.2023 | ||
| Former [2023/46] | ES | 08.03.2023 | |
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| SM | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| PT | 10.07.2023 | ||
| Former [2023/38] | ES | 08.03.2023 | |
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| NL | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| Former [2023/37] | ES | 08.03.2023 | |
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| GR | 09.06.2023 | ||
| Former [2023/36] | ES | 08.03.2023 | |
| FI | 08.03.2023 | ||
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| LV | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| SE | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| Former [2023/35] | ES | 08.03.2023 | |
| HR | 08.03.2023 | ||
| LT | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| NO | 08.06.2023 | ||
| Former [2023/34] | ES | 08.03.2023 | |
| LT | 08.03.2023 | ||
| RS | 08.03.2023 | ||
| Former [2023/33] | ES | 08.03.2023 | |
| LT | 08.03.2023 | Documents cited: | Search | [Y] US2008289801 (BATTY J CLAIR et al.) [Y] 1,6,7 * paragraph [0014]; figures 7-11 * * paragraph [0042] - paragraph [0048] * * paragraph [0063] - paragraph [0074] * | [XYI] US6220548 (HYMAN NELSON L et al.) [X] 2-4,8 * column 3, line 12 - column 3, line 32; figures 1a-2b *[Y] 1,6,7,9 [I] 5 | [Y] WO2014126591 (LOCKHEED CORP et al.) [Y] 9 * paragraph [0030]; figures 4a-4b * | [A] EP0780304 (HUGHES AIRCRAFT CO et al.) [A] 1-9 * column 3, line 33 - column 5, line 51; figures 1-3 * | [A] US4832113 (MIMS JAMES et al.) [A] 1-9 * figures 4-5 * | [A] US2002145082 (BERTHEUX PHILIPPE et al.) [A] 1-9 * figures 1-9 * | International search | [Y] JP2005178773 (CIT ALCATEL et al.) [y] 1-9 | [Y] JP2003276696 (MITSUBISHI ELECTRIC CORP et al.) [y] 1-9 | [Y] JPS6361700 (AGENCY IND SCIENCE TECHN et al.) [y] 2-9 | [YA] JP2008265522 (JAPAN AEROSPACE EXPLORATION et al.) [y] 3-9 [a] 1-2 | [A] EP0780304 (HUGHES AIRCRAFT CO et al.) [a] 1-9 | by applicant | JP2003312600 | JP2016521225 | US2013200221 |