EP3566283 - DC FAST CHARGING STATION FOR ELECTRIC VEHICLES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.01.2024 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 27.01.2023 | ||
Former | Grant of patent is intended Status updated on 31.08.2022 | ||
Former | Examination is in progress Status updated on 02.04.2021 | ||
Former | Request for examination was made Status updated on 11.10.2019 | ||
Former | The international publication has been made Status updated on 13.07.2018 | Most recent event Tooltip | 30.08.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 02.10.2024 [2024/40] | Applicant(s) | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | [2019/46] | Inventor(s) | 01 /
XU, Fei 1800 Cai Lun Road ZhangJiang Hi-Tech Park Shanghai 201203 / CN | 02 /
ELASSER, Ahmed One Research Circle Building K1-3A59 Niskayuna, NY 12309 / US | 03 /
COLOMBI, Silvio Via Cantonale 50 Riazzino Ticino / CH | 04 /
HUH, Kum Kang One Research Circle Building K1-3A59 Niskayuna, NY 12309 / US | [2019/46] | Representative(s) | Dennemeyer & Associates S.A. Landaubogen 1-3 81373 München / DE | [2019/46] | Application number, filing date | 17890777.0 | 05.01.2017 | [2019/46] | WO2017CN70267 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018126393 | Date: | 12.07.2018 | Language: | EN | [2018/28] | Type: | A1 Application with search report | No.: | EP3566283 | Date: | 13.11.2019 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.07.2018 takes the place of the publication of the European patent application. | [2019/46] | Type: | B1 Patent specification | No.: | EP3566283 | Date: | 01.03.2023 | Language: | EN | [2023/09] | Search report(s) | International search report - published on: | CN | 12.07.2018 | (Supplementary) European search report - dispatched on: | EP | 12.05.2020 | Classification | IPC: | H02J7/02 | [2019/46] | CPC: |
H02M3/158 (EP,US);
H02J7/0013 (EP,US);
B60L53/10 (US);
B60L53/11 (US);
H02J3/322 (EP,US);
H02J7/02 (EP,US);
H02M3/1582 (US);
H02M3/33571 (EP,US);
H02M3/33573 (EP,US);
H02M7/06 (EP);
H02J2207/20 (EP,US);
H02J2310/48 (EP,US);
H02M1/007 (EP);
H02M1/0074 (EP);
H02M1/008 (EP);
H02M3/1584 (EP);
H02M3/33576 (EP);
H02M7/487 (EP);
Y02T10/70 (EP);
Y02T10/7072 (EP);
Y02T90/12 (EP);
Y02T90/14 (EP)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/46] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | GLEICHSTROMSCHNELLLADESTATION FÜR ELEKTROFAHRZEUGE | [2019/46] | English: | DC FAST CHARGING STATION FOR ELECTRIC VEHICLES | [2019/46] | French: | STATION DE RECHARGE RAPIDE C.C. POUR VÉHICULES ÉLECTRIQUES | [2019/46] | Entry into regional phase | 01.08.2019 | National basic fee paid | 01.08.2019 | Search fee paid | 01.08.2019 | Designation fee(s) paid | 01.08.2019 | Examination fee paid | Examination procedure | 01.08.2019 | Examination requested [2019/46] | 25.11.2020 | Amendment by applicant (claims and/or description) | 01.04.2021 | Despatch of a communication from the examining division (Time limit: M04) | 23.07.2021 | Reply to a communication from the examining division | 30.11.2021 | Despatch of a communication from the examining division (Time limit: M04) | 24.03.2022 | Reply to a communication from the examining division | 01.09.2022 | Communication of intention to grant the patent | 22.12.2022 | Fee for grant paid | 22.12.2022 | Fee for publishing/printing paid | 22.12.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 04.12.2023 | No opposition filed within time limit [2024/06] | Fees paid | Renewal fee | 08.07.2019 | Renewal fee patent year 03 | 21.01.2020 | Renewal fee patent year 04 | 20.01.2021 | Renewal fee patent year 05 | 20.01.2022 | Renewal fee patent year 06 | 19.01.2023 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 01.03.2023 | CZ | 01.03.2023 | DK | 01.03.2023 | EE | 01.03.2023 | ES | 01.03.2023 | FI | 01.03.2023 | HR | 01.03.2023 | IT | 01.03.2023 | LT | 01.03.2023 | LV | 01.03.2023 | MC | 01.03.2023 | NL | 01.03.2023 | PL | 01.03.2023 | RO | 01.03.2023 | RS | 01.03.2023 | SE | 01.03.2023 | SI | 01.03.2023 | SK | 01.03.2023 | SM | 01.03.2023 | NO | 01.06.2023 | GR | 02.06.2023 | IS | 01.07.2023 | PT | 03.07.2023 | [2024/40] |
Former [2024/26] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
IT | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/10] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/50] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/49] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/48] | AT | 01.03.2023 | |
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/46] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/38] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/37] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/36] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/35] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/34] | ES | 01.03.2023 | |
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
Former [2023/33] | ES | 01.03.2023 | |
LT | 01.03.2023 | Documents cited: | Search | [XYI]WO2014160488 (IDEAL POWER INC [US]); | [Y]US2016288664 (BIAGINI ERIC [FR], et al); | [YA]EP3113345 (ABB TECHNOLOGY AG [CH]); | International search | [Y]CN101728961 (EMERSON NETWORK POWER CO LTD); | [Y]CN102891613 (DELTA ELECTRONIC ENTPR MAN SHANGHAI CO LTD); | [Y]CN203883694U (ANYANG INST TECHNOLOGY); | [A]CN204597794U (SHANGHAI DYAO AUTOMATION TECHNOLOGY CO LTD); | [Y]CN105762803 (UNIV CHINA THREE GORGES CTGU) | Examination | WO9601518 | by applicant | EP3113345 |