EP3581793 - WIND POWER GENERATION SYSTEM USING JET STREAM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.06.2022 Database last updated on 29.06.2024 | |
Former | The patent has been granted Status updated on 25.06.2021 | ||
Former | Grant of patent is intended Status updated on 10.03.2021 | ||
Former | Request for examination was made Status updated on 15.11.2019 | ||
Former | The international publication has been made Status updated on 18.08.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states An, Kwangwoo 33106 47th Place South Federal Way WA 98001 / US | [2019/51] | Inventor(s) | 01 /
AHN, You Jin 503dong 305ho, 403, Beonyeong-ro Gunpo-si Gyeonggi-do 15869 / KR | [2019/51] | Representative(s) | FRKelly Waterways House Grand Canal Quay Dublin D02 PD39 / IE | [N/P] |
Former [2021/30] | FRKelly 27 Clyde Road Dublin D04 F838 / IE | ||
Former [2019/51] | FRKelly 27 Clyde Road Dublin D04 F838 / IE | Application number, filing date | 17895594.4 | 29.11.2017 | [2019/51] | WO2017KR13823 | Priority number, date | KR20170016756 | 07.02.2017 Original published format: KR 20170016756 | [2019/51] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018147535 | Date: | 16.08.2018 | Language: | KO | [2018/33] | Type: | A1 Application with search report | No.: | EP3581793 | Date: | 18.12.2019 | Language: | EN | [2019/51] | Type: | B1 Patent specification | No.: | EP3581793 | Date: | 28.07.2021 | Language: | EN | [2021/30] | Search report(s) | International search report - published on: | KR | 16.08.2018 | (Supplementary) European search report - dispatched on: | EP | 09.10.2020 | Classification | IPC: | F03D9/32, F03D9/11, B64B1/36, B64C39/02 | [2019/51] | CPC: |
F03D9/32 (EP,KR,RU,US);
B64B1/36 (KR,US);
B64B1/62 (US);
B64C39/02 (US);
B64U10/30 (EP);
F03D1/06 (US);
F03D13/20 (EP,US);
F03D80/00 (EP,US);
F03D9/11 (KR,US);
H02J50/30 (RU,US);
H02K7/183 (US);
B64U2101/10 (EP,KR,RU);
F03D1/04 (EP,US);
F05B2240/922 (EP,US);
F05B2260/40 (EP,US);
F05B2260/42 (US);
F05B2270/18 (EP,US);
Y02E10/72 (EP);
Y02E10/728 (EP,US);
Y02E10/76 (KR);
Y02E70/30 (EP);
Y02T50/50 (KR)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/51] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | WINDENERGIEERZEUGUNGSSYSTEM MIT VERWENDUNG EINES DÜSENSTRAHLS | [2019/51] | English: | WIND POWER GENERATION SYSTEM USING JET STREAM | [2019/51] | French: | SYSTÈME DE PRODUCTION D'ÉNERGIE ÉOLIENNE À L'AIDE D'UN COURANT-JET | [2021/10] |
Former [2019/51] | SYSTÈME DE PRODUCTION D'ÉNERGIE ÉOLIENNE À L'AIDE D'UN FLUX D'ÉJECTION | Entry into regional phase | 15.03.2019 | Translation filed | 15.03.2019 | National basic fee paid | 15.03.2019 | Search fee paid | 15.03.2019 | Designation fee(s) paid | 15.03.2019 | Examination fee paid | Examination procedure | 15.03.2019 | Examination requested [2019/51] | 11.01.2021 | Amendment by applicant (claims and/or description) | 11.03.2021 | Communication of intention to grant the patent | 21.06.2021 | Fee for grant paid | 21.06.2021 | Fee for publishing/printing paid | 21.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 29.04.2022 | No opposition filed within time limit [2022/27] | Fees paid | Renewal fee | 06.11.2019 | Renewal fee patent year 03 | 24.11.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.11.2017 | AL | 28.07.2021 | AT | 28.07.2021 | CY | 28.07.2021 | CZ | 28.07.2021 | DK | 28.07.2021 | EE | 28.07.2021 | ES | 28.07.2021 | FI | 28.07.2021 | HR | 28.07.2021 | IT | 28.07.2021 | LT | 28.07.2021 | LV | 28.07.2021 | MC | 28.07.2021 | MK | 28.07.2021 | NL | 28.07.2021 | PL | 28.07.2021 | RO | 28.07.2021 | RS | 28.07.2021 | SE | 28.07.2021 | SI | 28.07.2021 | SK | 28.07.2021 | SM | 28.07.2021 | BG | 28.10.2021 | NO | 28.10.2021 | GR | 29.10.2021 | IS | 28.11.2021 | IE | 29.11.2021 | LU | 29.11.2021 | PT | 29.11.2021 | BE | 30.11.2021 | CH | 30.11.2021 | LI | 30.11.2021 | [2024/23] |
Former [2023/33] | HU | 29.11.2017 | |
AL | 28.07.2021 | ||
AT | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
IE | 29.11.2021 | ||
LU | 29.11.2021 | ||
PT | 29.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2023/30] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CY | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
IE | 29.11.2021 | ||
LU | 29.11.2021 | ||
PT | 29.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2022/48] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
IE | 29.11.2021 | ||
LU | 29.11.2021 | ||
PT | 29.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2022/37] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
LU | 29.11.2021 | ||
PT | 29.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2022/36] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
IT | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
LU | 29.11.2021 | ||
PT | 29.11.2021 | ||
BE | 30.11.2021 | ||
Former [2022/34] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
LU | 29.11.2021 | ||
PT | 29.11.2021 | ||
BE | 30.11.2021 | ||
Former [2022/33] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
MC | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
BE | 30.11.2021 | ||
Former [2022/29] | AL | 28.07.2021 | |
AT | 28.07.2021 | ||
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SI | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/25] | AT | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SK | 28.07.2021 | ||
SM | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/24] | AT | 28.07.2021 | |
CZ | 28.07.2021 | ||
DK | 28.07.2021 | ||
EE | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RO | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
SK | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/21] | AT | 28.07.2021 | |
DK | 28.07.2021 | ||
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/10] | AT | 28.07.2021 | |
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
HR | 28.07.2021 | ||
LT | 28.07.2021 | ||
LV | 28.07.2021 | ||
NL | 28.07.2021 | ||
PL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
GR | 29.10.2021 | ||
IS | 28.11.2021 | ||
PT | 29.11.2021 | ||
Former [2022/09] | AT | 28.07.2021 | |
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
RS | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
PT | 29.11.2021 | ||
Former [2022/08] | AT | 28.07.2021 | |
ES | 28.07.2021 | ||
FI | 28.07.2021 | ||
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
SE | 28.07.2021 | ||
BG | 28.10.2021 | ||
NO | 28.10.2021 | ||
Former [2022/07] | AT | 28.07.2021 | |
LT | 28.07.2021 | ||
NL | 28.07.2021 | ||
NO | 28.10.2021 | Documents cited: | Search | [Y]US2010140390 (GOODALL PETER ROBERT [GB]) [Y] 1-3,5 * paragraphs [0080] , [0081] , [0092] , [0129] * * figures 15,16 * * claim 15 *; | [Y]GB2499010 (AL-RUBB KHALIL ABU [GB]) [Y] 1-3,5 * page 1, line 30 - page 2, line 4 * * page 2, lines 6-17 * * page 2, line 28 - page 3, line 6 * * page 4, lines 4-8,13-16 * * page 8, lines 6-9 *; | [A]US2016122014 (JANG SOO-YOUNG [KR]) [A] 1,2,4,6-8 * paragraphs [0108] , [0127] , [0128] , [0132] , [0146] , [0155] ** figure 7 *; | [AP]WO2017195963 (AN KWANGWOO [KR]) [AP] 1-9 * figures 1,5 * * paragraphs [0055] - [0058] - [0061] , [0070] , [0076] - [0079] * | International search | [Y]JPH07236204 (HITACHI LTD) [Y] 1-9 * See paragraphs [0017]-[0076] and figure 1. *; | [A]KR20060011477 (TOTAL FINE SPRING CO LTD [KR]) [A] 1-9* See claim 1 and figure 1. *; | [Y]KR20110108633 (ENERGALE CO LTD [KR]) [Y] 1-9 * See paragraphs [0001]-[0049] and figures 1-7. *; | [A]KR20130002080 (DAEWOO SHIPBUILDING & MARINE [KR]) [A] 1-9 * See claim 1 and figure 2. *; | [A]KR20140001293U (DAEWOO SHIPBUILDING & MARINE ENGINEERING CO., LTD.) [A] 1-9 * See paragraphs [0067]-[0070] and figure 2. * |