blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3580436

EP3580436 - DUAL STAGE INTERNAL COMBUSTION ENGINE AFTERTREATMENT SYSTEM USING COMMON RADIATOR COOLING FLUID CIRCUITS FOR EXHAUST GAS INTERCOOLING AND CHARGER-DRIVEN EJECTOR [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  28.05.2021
Database last updated on 19.10.2024
FormerRequest for examination was made
Status updated on  15.11.2019
FormerThe international publication has been made
Status updated on  18.08.2018
Most recent event   Tooltip28.05.2021Application deemed to be withdrawnpublished on 30.06.2021  [2021/26]
Applicant(s)For all designated states
Tecogen, Inc.
45 First Avenue
Waltham, MA 02451 / US
[2019/51]
Inventor(s)01 / GHONIEM, Ahmed, F.
99 High Street
Winchester, MA 01890 / US
 [2019/51]
Representative(s)Russell, Tim, et al
Venner Shipley LLP
200 Aldersgate
London EC1A 4HD / GB
[2019/51]
Application number, filing date17895755.125.07.2017
[2019/51]
WO2017US43711
Priority number, dateUS201762457846P11.02.2017         Original published format: US 201762457846 P
WO2017US2942325.04.2017         Original published format: PCT/US2017/029423
US20171549682825.04.2017         Original published format: US201715496828
[2019/51]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018147896
Date:16.08.2018
Language:EN
[2018/33]
Type: A1 Application with search report 
No.:EP3580436
Date:18.12.2019
Language:EN
The application published by WIPO in one of the EPO official languages on 16.08.2018 takes the place of the publication of the European patent application.
[2019/51]
Search report(s)International search report - published on:US16.08.2018
ClassificationIPC:F01N3/02, F01N3/00
[2019/51]
CPC:
F01N13/009 (EP,US); B01D53/9418 (US); B01D53/9445 (US);
B01D53/9454 (EP,US); B01D53/9477 (EP,US); B01D53/9495 (EP,US);
B01D53/96 (EP,US); F01N11/007 (US); F01N13/08 (US);
F01N3/0205 (EP,US); F01N3/021 (EP,US); F01N3/035 (US);
F01N3/0821 (EP,US); F01N3/0835 (EP,US); F01N3/10 (US);
F01N3/32 (EP,US); F01N9/00 (US); F01N9/002 (EP,US);
B01D2255/102 (EP,US); B01D2255/904 (EP,US); B01D2255/915 (EP,US);
F01N2240/22 (EP); F01N2900/0418 (US); F01N2900/08 (EP,US);
F01N2900/10 (EP,US); F01N2900/1404 (EP,US); Y02A50/20 (EP,US);
Y02T10/12 (EP,US); Y02T10/30 (US); Y02T10/40 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/51]
TitleGerman:VERFAHREN ZUR ZWEISTUFIGEN VERBRENNUNGSMOTORNACHBEHANDLUNG MIT VERWENDUNG VON GEMEINSAMEN KÜHLERKÜHLFLÜSSIGKEITSKREISLÄUFEN ZUR ABGASZWISCHENKÜHLUNG UND LADERGESTEUERTER EJEKTOR[2019/51]
English:DUAL STAGE INTERNAL COMBUSTION ENGINE AFTERTREATMENT SYSTEM USING COMMON RADIATOR COOLING FLUID CIRCUITS FOR EXHAUST GAS INTERCOOLING AND CHARGER-DRIVEN EJECTOR[2019/51]
French:SYSTÈME DE POST-TRAITEMENT DE MOTEUR À COMBUSTION INTERNE À DEUX ÉTAGES UTILISANT DES CIRCUITS DE LIQUIDE DE REFROIDISSEMENT DE RADIATEUR COMMUNS POUR LE REFROIDISSEMENT INTERMÉDIAIRE DE GAZ D'ÉCHAPPEMENT ET ÉJECTEUR ENTRAÎNÉ PAR CHARGEUR[2019/51]
Entry into regional phase21.08.2019National basic fee paid 
21.08.2019Search fee paid 
21.08.2019Designation fee(s) paid 
21.08.2019Examination fee paid 
Examination procedure21.08.2019Examination requested  [2019/51]
30.03.2020Loss of particular rights, legal effect: Claims
24.06.2020Despatch of communication of loss of particular rights: Claims {1}
02.02.2021Application deemed to be withdrawn, date of legal effect  [2021/26]
23.02.2021Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2021/26]
Fees paidRenewal fee
21.08.2019Renewal fee patent year 03
Penalty fee
Additional fee for renewal fee
31.07.202004   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[Y]US2006130469  (BAEUERLE MICHAEL [DE], et al) [Y] 1, 5-8, 12-14, 17-20 * entire document. See pg 6 of the ISA/237 *;
 [Y]US2011265451  (GEHRET JOSEPH B [US], et al) [Y] 1, 5-8, 12-14, 17-20 * entire document *;
 [Y]US2011138807  (ULREY JOSEPH NORMAN [US], et al) [Y] 1, 5-8, 12-14, 17-20 * entire document *;
 [A]US5894834  (KIM JUNG-SHIK [KR]) [A] 1-20 * entire document *;
 [A]US2010043413  (ORIHASHI MANABU [JP], et al) [A] 1-20 * entire document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.