EP3570479 - INFORMATION INDICATION METHOD, DEVICE, AND SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.02.2023 Database last updated on 03.06.2024 | |
Former | The patent has been granted Status updated on 11.03.2022 | ||
Former | Grant of patent is intended Status updated on 12.10.2021 | ||
Former | Examination is in progress Status updated on 17.06.2020 | ||
Former | Request for examination was made Status updated on 18.10.2019 | ||
Former | The international publication has been made Status updated on 18.08.2018 | Most recent event Tooltip | 31.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 03.07.2024 [2024/27] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2019/47] | Inventor(s) | 01 /
TANG, Xiaoyong Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 02 /
YU, Jian Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2019/47] | Representative(s) | Gill Jennings & Every LLP The Broadgate Tower 20 Primrose Street London EC2A 2ES / GB | [2019/47] | Application number, filing date | 17895808.8 | 25.10.2017 | [2019/47] | WO2017CN107717 | Priority number, date | CN20171074440 | 10.02.2017 Original published format: CN201710074440 | [2019/47] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018145488 | Date: | 16.08.2018 | Language: | ZH | [2018/33] | Type: | A1 Application with search report | No.: | EP3570479 | Date: | 20.11.2019 | Language: | EN | [2019/47] | Type: | B1 Patent specification | No.: | EP3570479 | Date: | 13.04.2022 | Language: | EN | [2022/15] | Search report(s) | International search report - published on: | CN | 16.08.2018 | (Supplementary) European search report - dispatched on: | EP | 11.12.2019 | Classification | IPC: | H04L5/00, H04W72/04 | [2019/47] | CPC: |
H04L5/0048 (EP,CN,US);
H04L5/00 (EP);
H04L5/0007 (EP,US);
H04L5/0094 (EP);
H04W72/04 (EP);
H04W72/0446 (CN);
H04W72/0453 (CN);
H04W72/23 (US);
H04L5/0016 (EP);
H04W72/044 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/47] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN, VORRICHTUNG UND SYSTEM ZUR INFORMATIONSANZEIGE | [2019/47] | English: | INFORMATION INDICATION METHOD, DEVICE, AND SYSTEM | [2019/47] | French: | PROCÉDÉ D'INDICATION D'INFORMATIONS, DISPOSITIF ET SYSTÈME | [2019/47] | Entry into regional phase | 13.08.2019 | Translation filed | 13.08.2019 | National basic fee paid | 13.08.2019 | Search fee paid | 13.08.2019 | Designation fee(s) paid | 13.08.2019 | Examination fee paid | Examination procedure | 13.08.2019 | Examination requested [2019/47] | 16.04.2020 | Amendment by applicant (claims and/or description) | 19.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 27.08.2020 | Reply to a communication from the examining division | 17.12.2020 | Despatch of a communication from the examining division (Time limit: M04) | 24.02.2021 | Reply to a communication from the examining division | 28.10.2021 | Communication of intention to grant the patent | 04.03.2022 | Fee for grant paid | 04.03.2022 | Fee for publishing/printing paid | 04.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 16.01.2023 | No opposition filed within time limit [2023/12] | Fees paid | Renewal fee | 31.10.2019 | Renewal fee patent year 03 | 31.10.2020 | Renewal fee patent year 04 | 31.10.2021 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.10.2017 | AL | 13.04.2022 | AT | 13.04.2022 | CY | 13.04.2022 | CZ | 13.04.2022 | DK | 13.04.2022 | EE | 13.04.2022 | ES | 13.04.2022 | FI | 13.04.2022 | HR | 13.04.2022 | IT | 13.04.2022 | LT | 13.04.2022 | LV | 13.04.2022 | MC | 13.04.2022 | MK | 13.04.2022 | NL | 13.04.2022 | PL | 13.04.2022 | RO | 13.04.2022 | RS | 13.04.2022 | SE | 13.04.2022 | SI | 13.04.2022 | SK | 13.04.2022 | SM | 13.04.2022 | BG | 13.07.2022 | NO | 13.07.2022 | GR | 14.07.2022 | IS | 13.08.2022 | PT | 16.08.2022 | IE | 25.10.2022 | LU | 25.10.2022 | BE | 31.10.2022 | CH | 31.10.2022 | FR | 31.10.2022 | LI | 31.10.2022 | [2024/27] |
Former [2024/21] | HU | 25.10.2017 | |
AL | 13.04.2022 | ||
AT | 13.04.2022 | ||
CY | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
IT | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
NL | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SI | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
IE | 25.10.2022 | ||
LU | 25.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2024/18] | HU | 25.10.2017 | |
AL | 13.04.2022 | ||
AT | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
IT | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
NL | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SI | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
IE | 25.10.2022 | ||
LU | 25.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2024/11] | AL | 13.04.2022 | |
AT | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
IT | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
NL | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SI | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
IE | 25.10.2022 | ||
LU | 25.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/48] | AL | 13.04.2022 | |
AT | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
NL | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SI | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
IE | 25.10.2022 | ||
LU | 25.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/42] | AL | 13.04.2022 | |
AT | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
NL | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SI | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
LU | 25.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/35] | AL | 13.04.2022 | |
AT | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
NL | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SI | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
LU | 25.10.2022 | ||
CH | 31.10.2022 | ||
FR | 31.10.2022 | ||
LI | 31.10.2022 | ||
Former [2023/30] | AL | 13.04.2022 | |
AT | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
NL | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SI | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
LU | 25.10.2022 | ||
Former [2023/25] | AL | 13.04.2022 | |
AT | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
MC | 13.04.2022 | ||
NL | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SI | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2023/17] | AL | 13.04.2022 | |
AT | 13.04.2022 | ||
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
NL | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2023/09] | AT | 13.04.2022 | |
CZ | 13.04.2022 | ||
DK | 13.04.2022 | ||
EE | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
NL | 13.04.2022 | ||
PL | 13.04.2022 | ||
RO | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
SK | 13.04.2022 | ||
SM | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2023/07] | AT | 13.04.2022 | |
DK | 13.04.2022 | ||
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
NL | 13.04.2022 | ||
PL | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2022/51] | AT | 13.04.2022 | |
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
NL | 13.04.2022 | ||
PL | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
IS | 13.08.2022 | ||
PT | 16.08.2022 | ||
Former [2022/50] | AT | 13.04.2022 | |
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
NL | 13.04.2022 | ||
PL | 13.04.2022 | ||
RS | 13.04.2022 | ||
SE | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
PT | 16.08.2022 | ||
Former [2022/49] | AT | 13.04.2022 | |
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
HR | 13.04.2022 | ||
LT | 13.04.2022 | ||
LV | 13.04.2022 | ||
NL | 13.04.2022 | ||
SE | 13.04.2022 | ||
BG | 13.07.2022 | ||
NO | 13.07.2022 | ||
GR | 14.07.2022 | ||
PT | 16.08.2022 | ||
Former [2022/47] | AT | 13.04.2022 | |
ES | 13.04.2022 | ||
FI | 13.04.2022 | ||
LT | 13.04.2022 | ||
NL | 13.04.2022 | ||
SE | 13.04.2022 | ||
NO | 13.07.2022 | ||
PT | 16.08.2022 | ||
Former [2022/44] | NL | 13.04.2022 | Documents cited: | Search | [X]EP2905935 (LG ELECTRONICS INC [KR]) [X] 1-15 * paragraphs [0081] , [0 84] , [0 87] , [0 91] *; | [X]KR20160123873 (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1-15 * paragraphs [0018] , [0 78] , [0 87] , [0100] *; | [E]US2018076994 (LEE KEONKOOK [KR], et al)[E] 1-15 | Examination | - INTEL CORPORATION, "Remaining details on overhead reduction for Class B FD-MIMO", vol. RAN WG1, no. Reno, USA; 20161114 - 20161118, (20161106), 3GPP DRAFT; R1-1611930 REMAINING DETAILS ON OVERHEAD REDUCTION FOR CLASS B FD-MIMO, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIP, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_87/Docs/, (20161106), XP051190742 |