EP3495244 - ELECTRIC POWER STEERING APPARATUS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.11.2021 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 27.11.2020 | ||
Former | Grant of patent is intended Status updated on 23.07.2020 | ||
Former | Request for examination was made Status updated on 10.05.2019 | ||
Former | The international publication has been made Status updated on 04.05.2019 | ||
Former | unknown Status updated on 19.10.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states NSK Ltd. 1-6-3, Ohsaki Shinagawa-Ku Tokyo 141-8560 / JP | [2019/24] | Inventor(s) | 01 /
KITAZUME, Tetsuya c/o NSK LTD. 78 Toriba-Machi Maebashi-shi Gunma 371-8527 / JP | 02 /
SHIMOKAWABE, Satoshi c/o NSK LTD. 78 Toriba-Machi Maebashi-shi Gunma 371-8527 / JP | [2021/01] |
Former [2019/25] | 01 /
KITAZUME Tetsuya c/o NSK LTD. 78 Toriba-Machi Maebashi-shi Gunma 371-8527 / JP | ||
02 /
SHIMOKAWABE Satoshi c/o NSK LTD. 78 Toriba-Machi Maebashi-shi Gunma 371-8527 / JP | |||
Former [2019/24] | 01 /
KITAUME, Tetsuya c/o NSK Ltd. 78, Toriba-Machi, Maebashi-Shi Gunma 3718527 / JP | ||
02 /
SHIMOKAWABE, Satoshi c/o NSK Ltd. 78, Toriba-Machi, Maebashi-Shi Gunma 3718527 / JP | Representative(s) | Schmitt-Nilson Schraud Waibel Wohlfrom Patentanwälte Partnerschaft mbB Pelkovenstraße 143 80992 München / DE | [2019/24] | Application number, filing date | 17905009.1 | 24.10.2017 | [2019/24] | WO2017JP38348 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019082271 | Date: | 02.05.2019 | Language: | JA | [2019/18] | Type: | A1 Application with search report | No.: | EP3495244 | Date: | 12.06.2019 | Language: | EN | [2019/24] | Type: | B1 Patent specification | No.: | EP3495244 | Date: | 30.12.2020 | Language: | EN | [2020/53] | Search report(s) | International search report - published on: | JP | 02.05.2019 | (Supplementary) European search report - dispatched on: | EP | 09.12.2019 | Classification | IPC: | B62D6/00, B62D5/04, B62D101/00, B62D117/00, B62D119/00 | [2019/24] | CPC: |
B62D5/0466 (EP,US);
B62D5/0463 (US);
B62D5/0409 (US);
B62D5/0472 (US);
B62D6/10 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/24] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ELEKTRISCHE SERVOLENKUNG | [2019/24] | English: | ELECTRIC POWER STEERING APPARATUS | [2019/24] | French: | APPAREIL DE DIRECTION ASSISTÉE ÉLECTRIQUE | [2019/24] | Entry into regional phase | 18.10.2018 | Translation filed | 18.10.2018 | National basic fee paid | 18.10.2018 | Search fee paid | 18.10.2018 | Designation fee(s) paid | 18.10.2018 | Examination fee paid | Examination procedure | 20.03.2018 | Request for preliminary examination filed International Preliminary Examining Authority: JP | 18.10.2018 | Examination requested [2019/24] | 20.04.2020 | Amendment by applicant (claims and/or description) | 24.07.2020 | Communication of intention to grant the patent | 17.11.2020 | Fee for grant paid | 17.11.2020 | Fee for publishing/printing paid | 19.11.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 01.10.2021 | No opposition filed within time limit [2021/49] | Fees paid | Renewal fee | 15.10.2019 | Renewal fee patent year 03 | 14.10.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.10.2017 | AL | 30.12.2020 | AT | 30.12.2020 | CY | 30.12.2020 | CZ | 30.12.2020 | DK | 30.12.2020 | EE | 30.12.2020 | ES | 30.12.2020 | FI | 30.12.2020 | HR | 30.12.2020 | IT | 30.12.2020 | LT | 30.12.2020 | LV | 30.12.2020 | MC | 30.12.2020 | MK | 30.12.2020 | NL | 30.12.2020 | PL | 30.12.2020 | RO | 30.12.2020 | RS | 30.12.2020 | SE | 30.12.2020 | SI | 30.12.2020 | SK | 30.12.2020 | SM | 30.12.2020 | TR | 30.12.2020 | BG | 30.03.2021 | NO | 30.03.2021 | GR | 31.03.2021 | IS | 30.04.2021 | PT | 30.04.2021 | [2024/29] |
Former [2024/23] | HU | 24.10.2017 | |
AL | 30.12.2020 | ||
AT | 30.12.2020 | ||
CY | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
MK | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
SM | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2023/33] | HU | 24.10.2017 | |
AL | 30.12.2020 | ||
AT | 30.12.2020 | ||
CY | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
SM | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2023/30] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CY | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2023/29] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
NL | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2022/33] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
MC | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2022/23] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2022/13] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SI | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2022/10] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2022/08] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
ES | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/49] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
DK | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/48] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
IT | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/45] | AL | 30.12.2020 | |
AT | 30.12.2020 | ||
CZ | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/42] | AT | 30.12.2020 | |
CZ | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
IS | 30.04.2021 | ||
PT | 30.04.2021 | ||
Former [2021/39] | AT | 30.12.2020 | |
CZ | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
PL | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/37] | AT | 30.12.2020 | |
CZ | 30.12.2020 | ||
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/36] | CZ | 30.12.2020 | |
EE | 30.12.2020 | ||
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/35] | CZ | 30.12.2020 | |
FI | 30.12.2020 | ||
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
RO | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
SK | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/33] | FI | 30.12.2020 | |
HR | 30.12.2020 | ||
LT | 30.12.2020 | ||
LV | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
PT | 30.04.2021 | ||
Former [2021/28] | FI | 30.12.2020 | |
HR | 30.12.2020 | ||
LV | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
Former [2021/23] | FI | 30.12.2020 | |
LV | 30.12.2020 | ||
RS | 30.12.2020 | ||
SE | 30.12.2020 | ||
BG | 30.03.2021 | ||
NO | 30.03.2021 | ||
GR | 31.03.2021 | ||
Former [2021/22] | FI | 30.12.2020 | |
RS | 30.12.2020 | ||
NO | 30.03.2021 | ||
Former [2021/20] | FI | 30.12.2020 | Documents cited: | Search | [AD]JP4685557B (SHOWA CORP) [AD] 1 * the whole document *; | [A]JP5880801B (NSK LTD.); | [AD]JP5896091B [AD] 1-9; | [A]EP3025932 (NSK LTD [JP]) [A] 1-9 * paragraph [0040] - paragraph [0041]; figures 3,8,9 *; | [A]EP3031701 (NSK LTD [JP]) [A] 1 * abstract *; | [A]EP3141458 (JTEKT CORP [JP]) [A] 1 * paragraph [0019] *; | [A]JP2017052477 (JTEKT CORP) [A] 1; | [E]JP2018043730 (NSK LTD) [E] 1* the whole document * | International search | [A]JP5880801B (NSK LTD.) [A] 1-9* & US 2017/0183028 A1 & WO 2016/017235 A1 & EP 3031701 A1 *; | [YA]JP5896091B (NSK LTD.) [Y] 1-2, 7-9 * , fig. 2, 3 & US 2017/0137057 A1, fig. 2, 3 & WO 2016/017234 A1 & EP 3025932 A1 * [A] 3-6; | [YA]JP2017052477 (JTEKT CORP) [Y] 1-2, 7-9 * , paragraphs [0005], [0046], fig. 3 & US 2017/0073001 A1, paragraphs [0007], [0049], fig. 3 & EP 3141458 A1 * [A] 3-6 | by applicant | JP4685557B | JP5896091B |