blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3617819

EP3617819 - INDUSTRIAL CONTROLLER AND DATA SHARING METHOD IN AN INDUSTRIAL CONTROLLER [Right-click to bookmark this link]
Former [2020/10]INDUSTRIAL CONTROLLER AND DATA SHARING METHOD IN INDUSTRIAL CONTROLLER
[2021/41]
StatusNo opposition filed within time limit
Status updated on  06.01.2023
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  28.01.2022
FormerGrant of patent is intended
Status updated on  10.10.2021
FormerExamination is in progress
Status updated on  09.04.2021
FormerRequest for examination was made
Status updated on  31.01.2020
FormerThe international publication has been made
Status updated on  02.11.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): MC
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Hitachi Industrial Equipment Systems Co., Ltd.
3, Kandaneribei-cho Chiyoda-ku
Tokyo 101-0022 / JP
[2020/10]
Inventor(s)01 / AMANO, Takashi
c/o HITACHI, LTD.
6-6, Marunouchi 1-chome
Chiyoda-ku
Tokyo 100-8280 / JP
02 / IMAI, Mitsuhiro
c/o HITACHI, LTD.
6-6, Marunouchi 1-chome
Chiyoda-ku
Tokyo 100-8280 / JP
 [2020/10]
Representative(s)MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB
Paul-Heyse-Strasse 29
80336 München / DE
[2020/10]
Application number, filing date17907828.228.12.2017
[2020/10]
WO2017JP47400
Priority number, dateJP2017008896227.04.2017         Original published format: JP 2017088962
[2020/10]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018198439
Date:01.11.2018
Language:JA
[2018/44]
Type: A1 Application with search report 
No.:EP3617819
Date:04.03.2020
Language:EN
[2020/10]
Type: B1 Patent specification 
No.:EP3617819
Date:02.03.2022
Language:EN
[2022/09]
Search report(s)International search report - published on:JP01.11.2018
(Supplementary) European search report - dispatched on:EP30.10.2020
ClassificationIPC:G05B19/05, G05B19/042, G06F8/73, H04L12/28
[2020/49]
CPC:
G05B19/056 (EP,US); G05B19/0426 (EP,US); G05B19/052 (US);
G06F8/73 (EP); G06F9/44 (US); H04L12/28 (US);
H04L12/2803 (EP); G05B2219/15118 (US); G05B2219/23334 (EP,US) (-)
Former IPC [2020/10]G05B19/05
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/10]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TNNot yet paid
TitleGerman:INDUSTRIELLES STEUERGERÄT UND VERFAHREN ZUR GEMEINSAMEN DATENNUTZUNG IN EINEM INDUSTRIELLEM STEUERGERÄT[2021/41]
English:INDUSTRIAL CONTROLLER AND DATA SHARING METHOD IN AN INDUSTRIAL CONTROLLER[2021/41]
French:CONTRÔLEUR INDUSTRIEL ET PROCÉDÉ DE PARTAGE DE DONNÉES DANS UN CONTRÔLEUR INDUSTRIEL[2020/10]
Former [2020/10]INDUSTRIELLES STEUERGERÄT UND VERFAHREN ZUR GEMEINSAMEN DATENNUTZUNG IN INDUSTRIELLEM STEUERGERÄT
Former [2020/10]INDUSTRIAL CONTROLLER AND DATA SHARING METHOD IN INDUSTRIAL CONTROLLER
Entry into regional phase23.08.2019Translation filed 
27.11.2019National basic fee paid 
27.11.2019Search fee paid 
27.11.2019Designation fee(s) paid 
27.11.2019Examination fee paid 
Examination procedure27.11.2019Examination requested  [2020/10]
23.03.2021Amendment by applicant (claims and/or description)
13.04.2021Despatch of a communication from the examining division (Time limit: M04)
03.08.2021Reply to a communication from the examining division
27.10.2021Communication of intention to grant the patent
25.01.2022Fee for grant paid
25.01.2022Fee for publishing/printing paid
25.01.2022Receipt of the translation of the claim(s)
Opposition(s)05.12.2022No opposition filed within time limit [2023/06]
Fees paidRenewal fee
02.01.2020Renewal fee patent year 03
11.01.2021Renewal fee patent year 04
03.01.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.12.2017
AL02.03.2022
AT02.03.2022
CY02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MC02.03.2022
MK02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
[2024/29]
Former [2024/27]HU28.12.2017
AL02.03.2022
AT02.03.2022
CY02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
MK02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2024/21]HU28.12.2017
AL02.03.2022
AT02.03.2022
CY02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2024/18]HU28.12.2017
AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2023/10]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SI02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2023/07]AL02.03.2022
AT02.03.2022
CZ02.03.2022
DK02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2023/01]AL02.03.2022
AT02.03.2022
CZ02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2022/51]AT02.03.2022
CZ02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
IS02.07.2022
PT04.07.2022
Former [2022/49]AT02.03.2022
CZ02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SK02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
PT04.07.2022
Former [2022/48]AT02.03.2022
CZ02.03.2022
EE02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
PT04.07.2022
Former [2022/47]AT02.03.2022
ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RO02.03.2022
RS02.03.2022
SE02.03.2022
SM02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
PT04.07.2022
Former [2022/39]ES02.03.2022
FI02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RS02.03.2022
SE02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
Former [2022/36]ES02.03.2022
HR02.03.2022
LT02.03.2022
LV02.03.2022
PL02.03.2022
RS02.03.2022
SE02.03.2022
BG02.06.2022
NO02.06.2022
GR03.06.2022
Former [2022/35]ES02.03.2022
HR02.03.2022
LT02.03.2022
RS02.03.2022
SE02.03.2022
BG02.06.2022
NO02.06.2022
Former [2022/34]ES02.03.2022
LT02.03.2022
NO02.06.2022
Former [2022/33]LT02.03.2022
NO02.06.2022
Documents cited:Search[X]US2009276059  (TONE YUZURU [JP], et al) [X] 1-8 * paragraph [0004] - paragraph [0034]; figures 1-1,1-2,3-1,3-2,4,13,14,19-22 ** paragraph [0129] - paragraph [0143] *
International search[A]JPH043205  (YOKOGAWA ELECTRIC CORP) [A] 1-8 * , page 2, lower right column, line 7 to page 4, lower left column, line 15, fig. 1-9 (Family: none) *;
 [A]JP2000132208  (OMRON TATEISI ELECTRONICS CO) [A] 1-8 * , paragraphs [0021]-[0041], fig. 2-4 (Family: none) *;
 [A]WO2007110953  (MITSUBISHI ELECTRIC CORP [JP], et al) [A] 1-8 * , paragraphs [0036]-[0079], fig. 8-22 & US 2009/0276059 A1, paragraphs [0099]-[0148], fig. 8-22 *;
 [A]JP5079166B  (MITSUBISHI ELECTRIC CORP.) [A] 1-8 * , paragraphs [0018]-[0031], fig. 2-8 & US 2013/0006397 A1, paragraphs [0026]-[0039], fig. 2-8 & WO 2013/005350 A1 *;
 [A]JP2015215865  (FUJI ELECTRIC CO LTD) [A] 1-8* , paragraphs [0018]-[0081], fig. 1-8 (Family: none) *
by applicantJP5079166B
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.