blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3554010

EP3554010 - METHOD AND SYSTEM FOR USE IN CONSTRUCTING CONTENT DELIVERY NETWORK PLATFORM ON HETEROGENEOUS RESOURCES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.05.2022
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  18.06.2021
FormerGrant of patent is intended
Status updated on  15.02.2021
FormerExamination is in progress
Status updated on  11.07.2020
FormerRequest for examination was made
Status updated on  13.09.2019
FormerThe international publication has been made
Status updated on  16.11.2018
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Wangsu Science & Technology Co., Ltd.
Building A Floor 5
Guangqi Culture Plaza
2899 Xietu Road
Xuhui District
Shanghai 200030 / CN
[2019/42]
Inventor(s)01 / TIAN, Lingxiang
Building A Floor 5
Guangqi Culture Plaza
No. 2899 Xietu Road
Xuhui District
Shanghai 200030 / CN
 [2019/42]
Representative(s)de Arpe Fernandez, Manuel, et al
Arpe Patentes y Marcas
Edificio Aqua, Calle Agustín de Foxá 4-10
28036 Madrid / ES
[N/P]
Former [2021/29]de Arpe Fernandez, Manuel, et al
Arpe Patentes y Marcas
Alcalá, 26, 5ª Planta
28014 Madrid / ES
Former [2019/42]Hanna Moore + Curley
Garryard House
25/26 Earlsfort Terrace
Dublin 2, D02 PX51 / IE
Application number, filing date17909038.601.06.2017
[2019/42]
WO2017CN86770
Priority number, dateCN20171031660208.05.2017         Original published format: CN201710316602
[2019/42]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2018205325
Date:15.11.2018
Language:ZH
[2018/46]
Type: A1 Application with search report 
No.:EP3554010
Date:16.10.2019
Language:EN
[2019/42]
Type: B1 Patent specification 
No.:EP3554010
Date:21.07.2021
Language:EN
[2021/29]
Search report(s)International search report - published on:CN15.11.2018
(Supplementary) European search report - dispatched on:EP07.10.2019
ClassificationIPC:H04L12/24, H04L29/06
[2019/42]
CPC:
H04L41/40 (EP); H04L41/044 (EP,CN,US); H04L41/509 (EP,US);
H04L41/06 (CN,US); H04L41/145 (CN,US); H04L41/5051 (EP,US);
H04L65/40 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/42]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN UND SYSTEM ZUR VERWENDUNG BEI DER HERSTELLUNG EINER INHALTSBEREITSTELLUNGSNETZWERK-PLATTFORM AUF HETEROGENEN RESSOURCEN[2019/42]
English:METHOD AND SYSTEM FOR USE IN CONSTRUCTING CONTENT DELIVERY NETWORK PLATFORM ON HETEROGENEOUS RESOURCES[2019/42]
French:PROCÉDÉ ET SYSTÈME DESTINÉS À ÊTRE UTILISÉS POUR LA CONSTRUCTION D'UNE PLATEFORME DE RÉSEAU DE DISTRIBUTION DE CONTENU SUR DES RESSOURCES HÉTÉROGÈNES[2019/42]
Entry into regional phase12.07.2019Translation filed 
12.07.2019National basic fee paid 
12.07.2019Search fee paid 
12.07.2019Designation fee(s) paid 
12.07.2019Examination fee paid 
Examination procedure12.07.2019Examination requested  [2019/42]
27.04.2020Amendment by applicant (claims and/or description)
15.07.2020Despatch of a communication from the examining division (Time limit: M04)
25.11.2020Reply to a communication from the examining division
16.02.2021Communication of intention to grant the patent
12.04.2021Fee for grant paid
12.04.2021Fee for publishing/printing paid
14.06.2021Receipt of the translation of the claim(s)
Opposition(s)22.04.2022No opposition filed within time limit [2022/26]
Fees paidRenewal fee
12.07.2019Renewal fee patent year 03
22.05.2020Renewal fee patent year 04
28.05.2021Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.06.2017
AL21.07.2021
AT21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
MK21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
[2024/23]
Former [2024/20]HU01.06.2017
AL21.07.2021
AT21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2024/18]HU01.06.2017
AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2023/08]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/36]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/29]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/25]AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/24]AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SK21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/21]AT21.07.2021
DK21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/11]AT21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/09]AT21.07.2021
ES21.07.2021
FI21.07.2021
LT21.07.2021
NL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
PT22.11.2021
Former [2022/08]AT21.07.2021
ES21.07.2021
FI21.07.2021
LT21.07.2021
NL21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
Former [2022/07]AT21.07.2021
LT21.07.2021
NL21.07.2021
NO21.10.2021
Documents cited:Search[I]CN101388785  (CHINA TELECOM CO LTD [CN]) [I] 1-15 * page 5, line 14 - page 11, line 23 * * figures 1-6 *;
 [A]WO2013101217  (INTEL CORP [US], et al) [A] 1,7 * paragraphs [0018] - [0020] ** figure 2 *;
 [XI]  - CHUANYANG MIAO ZTE CORPORATION P R CHINA, "H.VCDN.1-NV "Virtual content delivery network Network virtualization" (New): Updated draft (Geneva, 16 - 27 January 2017);TD60 (WP 1/16)", vol. 21/16, (20170126), pages 1 - 17, ITU-T DRAFT; STUDY PERIOD 2017-2020; STUDY GROUP 16; SERIES TD60 (WP 1/16), INTERNATIONAL TELECOMMUNICATION UNION, GENEVA ; CH, URL: https://www.itu.int/ifa/t/2017/sg16/docs/170116/td/ties/wp1/T17-SG16-170116-TD-WP1-0060!!MSW-E.docx, (20170126), XP044215551 [X] 1,7 * chapters 6-8 * * figures 6-1,7-2,8-1,8-2 * [I] 2-6,8-15
 [A]  - COSTA-PEREZ XAVIER ET AL, "5G-Crosshaul: An SDN/NFV Integrated Fronthaul/Backhaul Transport Network Architecture", TECHNICAL REPORT OF WIRELESS NETWORKING GROUP, COORDINATED SCIENCE LABORATORY; DEPT. ELECTRICAL AND COMPUTER ENGINEERING; UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN, US, vol. 24, no. 1, doi:10.1109/MWC.2017.1600181WC, ISSN 1536-1284, (20170228), pages 38 - 45, (20170224), XP011641906 [A] 1-15 * chapter 5G-crosshAul Architecture, pages 39-40 * * chapter 5G-crosshaul Architecture Main Components, pages 41-42 * * figures 1-3 *

DOI:   http://dx.doi.org/10.1109/MWC.2017.1600181WC
International search[X]CN101388785  (CHINA TELECOM CO LTD [CN]) [X] 1-14;
 [A]CN101764810  (CHINESE ACAD INST ACOUSTICS) [A] 1-14;
 [A]WO2012034397  (ZTE CORP [CN], et al)[A] 1-14;
 [A]CN102624684  (ZTE CORP) [A] 1-14
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.