EP3668816 - A SYSTEM AND METHOD FOR DECOMPOSING GASEOUS HYDROGEN SULFIDE INTO HYDROGEN GAS AND ELEMENTARY SULFUR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.05.2024 Database last updated on 16.07.2024 | |
Former | The patent has been granted Status updated on 09.06.2023 | ||
Former | Grant of patent is intended Status updated on 22.02.2023 | ||
Former | Examination is in progress Status updated on 13.08.2021 | ||
Former | Request for examination was made Status updated on 22.05.2020 | ||
Former | The international publication has been made Status updated on 22.02.2019 | ||
Former | unknown Status updated on 19.12.2018 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Turkiye Petrol Rafinerileri Anonim Sirketi Tupras Tupras Genel Mudurlugu Guney Mahallesi Petrol Caddesi, No:25 41780 Korfez/Kocaeli / TR | [2020/26] | Inventor(s) | 01 /
KARAKAYA, Cuneyt Turkiye Petrol Rafinerileri A.S. TUPRAS Genel Mudurlugu 41780 Korfez/Kocaeli / TR | [2020/26] | Representative(s) | Cayli, Hülya Paragon Consultancy Incorporated Koza Sokak No: 63/2 GOP Cankaya 06540 Ankara / TR | [N/P] |
Former [2020/26] | Cayli, Hülya Paragon Consultancy Incorporated Koza Sokak No: 63/2 GOP 06540 Ankara / TR | Application number, filing date | 17913115.6 | 29.12.2017 | [2020/26] | WO2017TR50724 | Priority number, date | TR20170012330 | 18.08.2017 Original published format: TR 201712330 | [2020/26] | Filing language | TR | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019035789 | Date: | 21.02.2019 | Language: | EN | [2019/08] | Type: | A1 Application with search report | No.: | EP3668816 | Date: | 24.06.2020 | Language: | EN | The application published by WIPO in one of the EPO official languages on 21.02.2019 takes the place of the publication of the European patent application. | [2020/26] | Type: | B1 Patent specification | No.: | EP3668816 | Date: | 12.07.2023 | Language: | EN | [2023/28] | Search report(s) | International search report - published on: | EP | 21.02.2019 | Classification | IPC: | C01B17/04, C01B3/00, C25B1/02, C25B1/00, C25B1/55, C25B15/08 | [2023/10] | CPC: |
C01B17/0495 (EP,US);
C25B1/55 (EP,US);
C25B1/00 (EP);
C25B1/02 (EP,US);
C25B15/08 (EP,US);
C25B9/67 (US);
|
Former IPC [2020/26] | C01B17/04, C01B3/00, C25B1/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/26] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | TN | Not yet paid | Title | German: | SYSTEM UND VERFAHREN ZUR ZERSETZUNG VON GASFÖRMIGEM SCHWEFELWASSERSTOFF ZU WASSERSTOFFGAS UND ELEMENTAREM SCHWEFEL | [2020/26] | English: | A SYSTEM AND METHOD FOR DECOMPOSING GASEOUS HYDROGEN SULFIDE INTO HYDROGEN GAS AND ELEMENTARY SULFUR | [2020/26] | French: | SYSTÈME ET PROCÉDÉ DE DÉCOMPOSITION DE SULFURE D'HYDROGÈNE GAZEUX EN GAZ HYDROGÈNE ET SOUFRE ÉLÉMENTAIRE | [2020/26] | Entry into regional phase | 13.03.2020 | National basic fee paid | 13.03.2020 | Designation fee(s) paid | 13.03.2020 | Examination fee paid | Examination procedure | 11.06.2019 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 13.03.2020 | Examination requested [2020/26] | 13.03.2020 | Date on which the examining division has become responsible | 10.09.2020 | Amendment by applicant (claims and/or description) | 12.08.2021 | Despatch of a communication from the examining division (Time limit: M04) | 07.12.2021 | Reply to a communication from the examining division | 23.02.2023 | Communication of intention to grant the patent | 05.06.2023 | Fee for grant paid | 05.06.2023 | Fee for publishing/printing paid | 05.06.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 15.04.2024 | No opposition filed within time limit [2024/25] | Fees paid | Renewal fee | 13.03.2020 | Renewal fee patent year 03 | 21.12.2020 | Renewal fee patent year 04 | 21.12.2021 | Renewal fee patent year 05 | 23.12.2022 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 12.07.2023 | CZ | 12.07.2023 | DK | 12.07.2023 | EE | 12.07.2023 | ES | 12.07.2023 | FI | 12.07.2023 | HR | 12.07.2023 | IT | 12.07.2023 | LT | 12.07.2023 | LV | 12.07.2023 | PL | 12.07.2023 | RO | 12.07.2023 | RS | 12.07.2023 | SE | 12.07.2023 | SK | 12.07.2023 | SM | 12.07.2023 | NO | 12.10.2023 | GR | 13.10.2023 | IS | 12.11.2023 | PT | 13.11.2023 | [2024/26] |
Former [2024/23] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
EE | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SK | 12.07.2023 | ||
SM | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/22] | AT | 12.07.2023 | |
CZ | 12.07.2023 | ||
DK | 12.07.2023 | ||
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
PL | 12.07.2023 | ||
RO | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SM | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/20] | AT | 12.07.2023 | |
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
PL | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
SM | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/10] | AT | 12.07.2023 | |
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
HR | 12.07.2023 | ||
LT | 12.07.2023 | ||
LV | 12.07.2023 | ||
PL | 12.07.2023 | ||
RS | 12.07.2023 | ||
SE | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
PT | 13.11.2023 | ||
Former [2024/09] | AT | 12.07.2023 | |
ES | 12.07.2023 | ||
FI | 12.07.2023 | ||
LT | 12.07.2023 | ||
SE | 12.07.2023 | ||
NO | 12.10.2023 | ||
GR | 13.10.2023 | ||
IS | 12.11.2023 | ||
Former [2024/08] | LT | 12.07.2023 | |
NO | 12.10.2023 | ||
GR | 13.10.2023 | Cited in | International search | [A]EP0127595 (ENERGY CONVERSION DEVICES INC [US]) [A] 1-18 * examples 1,3; claim 1 *; | [A]US4526774 (MAAS JR EDWARD T [US], et al) [A] 1-18* the whole document *; | [I]WO9832518 (GAS RES INST INC [US]) [I] 1-18 * claims 1-4,6,8,9-12,14,16 * * example IX * * figure 1 *; | [A]US5908545 (DONINI JOHN C [CA], et al) [A] 1-18 * claim 1 * * figure 1 * |