EP3641102 - METHOD FOR CONTROLLING NONCONTACT ELECTRIC POWER SUPPLY SYSTEM, AND NONCONTACT ELECTRIC POWER SUPPLY SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.12.2021 Database last updated on 28.05.2024 | |
Former | The patent has been granted Status updated on 15.01.2021 | ||
Former | Grant of patent is intended Status updated on 26.10.2020 | ||
Former | Request for examination was made Status updated on 20.03.2020 | ||
Former | The international publication has been made Status updated on 22.12.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Nissan Motor Co., Ltd. 2 Takara-cho Kanagawa-ku Yokohama-shi, Kanagawa 221-0023 / JP | [2020/17] | Inventor(s) | 01 /
TSUKAMOTO, Yukinori c/o NISSAN MOTOR CO., LTD. Intellectual Property Department 1-1 Morinosatoaoyama Atsugi-shi, Kanagawa 243-0123 / JP | 02 /
MO, Shihang c/o NISSAN MOTOR CO., LTD. Intellectual Property Department 1-1 Morinosatoaoyama Atsugi-shi, Kanagawa 243-0123 / JP | [2020/17] | Representative(s) | Hoefer & Partner Patentanwälte mbB Pilgersheimer Straße 20 81543 München / DE | [2020/17] | Application number, filing date | 17913228.7 | 13.06.2017 | [2020/17] | WO2017JP21771 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2018229858 | Date: | 20.12.2018 | Language: | JA | [2018/51] | Type: | A1 Application with search report | No.: | EP3641102 | Date: | 22.04.2020 | Language: | EN | [2020/17] | Type: | B1 Patent specification | No.: | EP3641102 | Date: | 17.02.2021 | Language: | EN | [2021/07] | Search report(s) | International search report - published on: | JP | 20.12.2018 | (Supplementary) European search report - dispatched on: | EP | 20.02.2020 | Classification | IPC: | H02J50/70, B60L53/12, H02J50/10, B60L53/36, B60L53/37, B60L53/39, B60L53/66 | [2020/45] | CPC: |
B60L53/12 (EP,KR,RU,US);
B60L53/38 (KR);
B60L53/36 (EP);
B60L53/37 (EP,KR);
B60L53/39 (EP);
B60L53/66 (EP);
B60R25/24 (RU);
B60R25/245 (US);
G07C9/00182 (US);
H02J50/10 (EP,KR,RU,US);
H02J50/70 (EP,RU,US);
H02J50/90 (KR);
B60L2260/22 (KR);
B60Y2200/91 (KR);
B60Y2200/92 (KR);
G07C2009/00793 (US);
H02J2310/48 (EP);
Y02T10/70 (EP);
|
Former IPC [2020/17] | H02J50/70, H02J50/10, B60L53/12 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/17] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR STEUERUNG EINES KONTAKTLOSEN ELEKTRISCHEN STROMVERSORGUNGSSYSTEMS UND KONTAKTLOSES ELEKTRISCHES STROMVERSORGUNGSSYSTEM | [2020/17] | English: | METHOD FOR CONTROLLING NONCONTACT ELECTRIC POWER SUPPLY SYSTEM, AND NONCONTACT ELECTRIC POWER SUPPLY SYSTEM | [2020/17] | French: | PROCÉDÉ DE COMMANDE D'UN SYSTÈME D'ALIMENTATION ÉLECTRIQUE SANS CONTACT, ET SYSTÈME D'ALIMENTATION ÉLECTRIQUE SANS CONTACT | [2020/17] | Entry into regional phase | 09.12.2019 | Translation filed | 09.12.2019 | National basic fee paid | 09.12.2019 | Search fee paid | 09.12.2019 | Designation fee(s) paid | 09.12.2019 | Examination fee paid | Examination procedure | 09.12.2019 | Examination requested [2020/17] | 23.06.2020 | Amendment by applicant (claims and/or description) | 27.10.2020 | Communication of intention to grant the patent | 23.12.2020 | Fee for grant paid | 23.12.2020 | Fee for publishing/printing paid | 23.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 18.11.2021 | No opposition filed within time limit [2022/04] | Fees paid | Renewal fee | 09.12.2019 | Renewal fee patent year 03 | 30.06.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.06.2017 | AL | 17.02.2021 | AT | 17.02.2021 | CY | 17.02.2021 | CZ | 17.02.2021 | DK | 17.02.2021 | EE | 17.02.2021 | ES | 17.02.2021 | FI | 17.02.2021 | HR | 17.02.2021 | IT | 17.02.2021 | LT | 17.02.2021 | LV | 17.02.2021 | MC | 17.02.2021 | MK | 17.02.2021 | NL | 17.02.2021 | PL | 17.02.2021 | RO | 17.02.2021 | RS | 17.02.2021 | SE | 17.02.2021 | SI | 17.02.2021 | SK | 17.02.2021 | SM | 17.02.2021 | BG | 17.05.2021 | NO | 17.05.2021 | GR | 18.05.2021 | IE | 13.06.2021 | LU | 13.06.2021 | IS | 17.06.2021 | PT | 17.06.2021 | BE | 30.06.2021 | CH | 30.06.2021 | LI | 30.06.2021 | [2024/23] |
Former [2023/33] | HU | 13.06.2017 | |
AL | 17.02.2021 | ||
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IE | 13.06.2021 | ||
LU | 13.06.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2023/30] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CY | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IE | 13.06.2021 | ||
LU | 13.06.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/34] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IE | 13.06.2021 | ||
LU | 13.06.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/23] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
IT | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IE | 13.06.2021 | ||
LU | 13.06.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/21] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IE | 13.06.2021 | ||
LU | 13.06.2021 | ||
PT | 17.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/18] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
LU | 13.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/13] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SI | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/10] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2022/08] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
ES | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2022/07] | AL | 17.02.2021 | |
AT | 17.02.2021 | ||
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
MC | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/50] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RO | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SK | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/49] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
DK | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/48] | AT | 17.02.2021 | |
CZ | 17.02.2021 | ||
EE | 17.02.2021 | ||
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/46] | AT | 17.02.2021 | |
FI | 17.02.2021 | ||
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
SM | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/42] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
IS | 17.06.2021 | ||
PT | 17.06.2021 | ||
Former [2021/39] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
PL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/38] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
NL | 17.02.2021 | ||
RS | 17.02.2021 | ||
SE | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/37] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
LV | 17.02.2021 | ||
RS | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/36] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
BG | 17.05.2021 | ||
NO | 17.05.2021 | ||
GR | 18.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/35] | FI | 17.02.2021 | |
HR | 17.02.2021 | ||
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | ||
Former [2021/33] | FI | 17.02.2021 | |
LT | 17.02.2021 | ||
NO | 17.05.2021 | ||
PT | 17.06.2021 | Documents cited: | Search | [A]US2016039302 (SCHWAB AXEL [DE]) [A] 1-8* the whole document * | International search | [A]WO2012176265 (TOYOTA MOTOR CO LTD [JP], et al) [A] 1-8* , fig. 5 to 15 & US 2014/0092243 A1 fig. 5 to 15 & EP 2722217 A1 & CN 103228481 A *; | [A]JP2014116999 (DENSO CORP) [A] 1-8 * , paragraphs [0060] to [0101]; fig. 6 to 9 & WO 2014/087589 A1 *; | [A]JP2016047983 (TOKAI RIKA CO LTD) [A] 1-8 * , entire text; all drawings (Family: none) * | by applicant | JPS6036348B |