EP3614762 - DEVICE-TO-DEVICE (D2D) COMMUNICATION METHOD AND TERMINAL DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.02.2022 Database last updated on 02.08.2024 | |
Former | The patent has been granted Status updated on 12.03.2021 | ||
Former | Grant of patent is intended Status updated on 24.11.2020 | ||
Former | Request for examination was made Status updated on 24.01.2020 | ||
Former | The international publication has been made Status updated on 16.02.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan Guangdong 523860 / CN | [2021/15] |
Former [2020/09] | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan Guangdong 523860 / CN | Inventor(s) | 01 /
LIN, Yanan No.18 Haibin Road Wusha Chang'an Dongguan, Guangdong 523860 / CN | [2020/09] | Representative(s) | Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB Martin-Greif-Strasse 1 80336 München / DE | [2020/09] | Application number, filing date | 17921315.2 | 10.08.2017 | [2020/09] | WO2017CN96858 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019028748 | Date: | 14.02.2019 | Language: | ZH | [2019/07] | Type: | A1 Application with search report | No.: | EP3614762 | Date: | 26.02.2020 | Language: | EN | [2020/09] | Type: | B1 Patent specification | No.: | EP3614762 | Date: | 14.04.2021 | Language: | EN | [2021/15] | Search report(s) | International search report - published on: | CN | 14.02.2019 | (Supplementary) European search report - dispatched on: | EP | 17.03.2020 | Classification | IPC: | H04W72/04, H04W76/14 | [2020/16] | CPC: |
H04W76/14 (EP,US);
H04W72/20 (US);
H04W4/40 (US);
H04W72/0446 (US)
|
Former IPC [2020/09] | H04W72/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/09] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | D2D-KOMMUNIKATIONSVERFAHREN UND ENDGERÄT | [2020/09] | English: | DEVICE-TO-DEVICE (D2D) COMMUNICATION METHOD AND TERMINAL DEVICE | [2020/09] | French: | PROCÉDÉ DE COMMUNICATION DE DISPOSITIF À DISPOSITIF (D2D), ET DISPOSITIF TERMINAL | [2020/09] | Entry into regional phase | 21.11.2019 | Translation filed | 21.11.2019 | National basic fee paid | 21.11.2019 | Search fee paid | 21.11.2019 | Designation fee(s) paid | 21.11.2019 | Examination fee paid | Examination procedure | 21.11.2019 | Examination requested [2020/09] | 09.10.2020 | Amendment by applicant (claims and/or description) | 25.11.2020 | Communication of intention to grant the patent | 05.03.2021 | Fee for grant paid | 05.03.2021 | Fee for publishing/printing paid | 05.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 17.01.2022 | No opposition filed within time limit [2022/12] | Fees paid | Renewal fee | 21.11.2019 | Renewal fee patent year 03 | 28.08.2020 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.08.2017 | AL | 14.04.2021 | AT | 14.04.2021 | CY | 14.04.2021 | CZ | 14.04.2021 | DK | 14.04.2021 | EE | 14.04.2021 | ES | 14.04.2021 | FI | 14.04.2021 | HR | 14.04.2021 | IT | 14.04.2021 | LT | 14.04.2021 | LV | 14.04.2021 | MC | 14.04.2021 | MK | 14.04.2021 | NL | 14.04.2021 | PL | 14.04.2021 | RO | 14.04.2021 | RS | 14.04.2021 | SE | 14.04.2021 | SI | 14.04.2021 | SK | 14.04.2021 | SM | 14.04.2021 | TR | 14.04.2021 | BG | 14.07.2021 | NO | 14.07.2021 | GR | 15.07.2021 | GB | 10.08.2021 | IE | 10.08.2021 | LU | 10.08.2021 | IS | 14.08.2021 | PT | 16.08.2021 | BE | 31.08.2021 | CH | 31.08.2021 | FR | 31.08.2021 | LI | 31.08.2021 | [2024/29] |
Former [2024/23] | HU | 10.08.2017 | |
AL | 14.04.2021 | ||
AT | 14.04.2021 | ||
CY | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
MK | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
GB | 10.08.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2023/33] | HU | 10.08.2017 | |
AL | 14.04.2021 | ||
AT | 14.04.2021 | ||
CY | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
GB | 10.08.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2023/30] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CY | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
GB | 10.08.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/36] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
IT | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
GB | 10.08.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/35] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
GB | 10.08.2021 | ||
IE | 10.08.2021 | ||
LU | 10.08.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/34] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
LU | 10.08.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
BE | 31.08.2021 | ||
CH | 31.08.2021 | ||
FR | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/29] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SI | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
LU | 10.08.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/26] | AL | 14.04.2021 | |
AT | 14.04.2021 | ||
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
LU | 10.08.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/23] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
LU | 10.08.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
Former [2022/21] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
PT | 16.08.2021 | ||
CH | 31.08.2021 | ||
LI | 31.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/18] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
MC | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
PT | 16.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/10] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
EE | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
PT | 16.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RO | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SK | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/08] | AT | 14.04.2021 | |
CZ | 14.04.2021 | ||
DK | 14.04.2021 | ||
ES | 14.04.2021 | ||
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2022/07] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
SM | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/52] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
PL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/51] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
RS | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
IS | 14.08.2021 | ||
PT | 16.08.2021 | ||
Former [2021/50] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
PT | 16.08.2021 | ||
Former [2021/49] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
HR | 14.04.2021 | ||
LT | 14.04.2021 | ||
LV | 14.04.2021 | ||
NL | 14.04.2021 | ||
SE | 14.04.2021 | ||
BG | 14.07.2021 | ||
NO | 14.07.2021 | ||
GR | 15.07.2021 | ||
Former [2021/46] | AT | 14.04.2021 | |
FI | 14.04.2021 | ||
LT | 14.04.2021 | ||
NL | 14.04.2021 | ||
BG | 14.07.2021 | Documents cited: | Search | [A]KR20160118905 (SAMSUNG ELECTRONICS CO LTD [KR]) [A] 1-15 * figure 5 *; | US2018359745 [ ] (YEO JEONGHO [KR], et al) [ ] * First embodiment; paragraphs [0134] - [0153] *; | [XAYI] - ZTE ET AL, "Discussion on Short TTI with eV2X", vol. RAN WG1, no. Spokane, Washington, USA; 20170403 - 20170407, (20170324), 3GPP DRAFT; R1-1704655 - 7.2.3.3 DISCUSSION ON SHORT TTI WITH V2X, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRAN, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_88b/Docs/, (20170324), XP051250551 [X] 2,9,10 * Section 2.1 Resource pool sharing, Section 3 Impact on sensing and resource selection; page 3; figures 1, 2, 3 * [A] 1,3-8 [Y] 11,12 [I] 13-15 | [A] - ERICSSON, "Short TTI transmission for PC5-based V2X", vol. RAN WG1, no. Hangzhou, China; 20170515 - 20170519, (20170506), 3GPP DRAFT; R1-1708969 STTI OVERVIEW - ERICSSON, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_89/Docs/, (20170506), XP051262793 [A] 1-15 * Section 2.2 SA formats for sTTI, Observation 3 on page 2; page 2 * | [Y] - NOKIA ET AL, "Further Discussion On short TTI", vol. RAN WG1, no. Hangzhou; 20170515 - 20170519, (20170514), 3GPP DRAFT; R1-1708560-NOKIA-FURTHER_DISCUSSION_ON_SHORT_TTI, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN1/Docs/, (20170514), XP051273752 [Y] 11,12 * Section 2.2.2.1 Potential contents of proxy SA; page 5 * | International search | [A]CN105873218 (BEIJING NORTHERN FIBERHOME TECH CO LTD) [A] 1-26; | [A]US2017142704 (JUNG SOOJUNG [KR], et al)[A] 1-26; | [A]CN106961732 (ALCATEL LUCENT SHANGHAI BELL, et al) [A] 1-26; | [A]WO2017126266 (NEC CORP [JP]) [A] 1-26; | [A] - "Considerations on Support of Short TTI for LTE V2V Side- link Communication", 3GPP TSG RAN WG1 Meeting #89, Rl-1707307, (20170519), XP051272520 [A] 1-26 * , * |