blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3499804

EP3499804 - NETWORK SWITCHING METHOD AND TERMINAL DEVICE [Right-click to bookmark this link]
Former [2019/25]NETWORK SWITCHING METHOD, TERMINAL DEVICE, AND NETWORK DEVICE
[2020/13]
StatusNo opposition filed within time limit
Status updated on  16.04.2021
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  08.05.2020
FormerGrant of patent is intended
Status updated on  11.03.2020
FormerRequest for examination was made
Status updated on  17.05.2019
FormerThe international publication has been made
Status updated on  06.04.2019
Formerunknown
Status updated on  14.03.2019
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD.
No. 18 Haibin Road
Wusha, Chang'an
Dongguan, Guangdong 523860 / CN
[N/P]
Former [2019/50]For all designated states
GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD.
No. 18 Haibin Road
Wusha, Chang'an
Dongguan
Guangdong 523860 / CN
Former [2019/25]For all designated states
Guangdong OPPO Mobile Telecommunications Corp., Ltd.
No.18, Haibin Road
Wusha
Chang'an
Dongguan, Guangdong 523860 / CN
Inventor(s)01 / YANG, Ning
No.18 Haibin Road
Wusha
Chang'an
Dongguan Guangdong 523860 / CN
02 / LIU, Jianhua
No.18 Haibin Road
Wusha
Chang'an
Dongguan Guangdong 523860 / CN
 [2019/25]
Representative(s)Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB
Martin-Greif-Strasse 1
80336 München / DE
[2019/25]
Application number, filing date17923980.126.09.2017
[2019/25]
WO2017CN103532
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2019061039
Date:04.04.2019
Language:ZH
[2019/14]
Type: A1 Application with search report 
No.:EP3499804
Date:19.06.2019
Language:EN
[2019/25]
Type: B1 Patent specification 
No.:EP3499804
Date:10.06.2020
Language:EN
[2020/24]
Search report(s)International search report - published on:CN04.04.2019
(Supplementary) European search report - dispatched on:EP06.08.2019
ClassificationIPC:H04W36/12, // H04W48/12
[2019/36]
CPC:
H04W36/12 (EP,US); H04L41/0816 (US); H04W36/00837 (EP,US);
H04W36/1443 (EP,US); H04W36/362 (EP,US); H04W76/27 (US);
H04W48/12 (EP,US); H04W80/02 (US) (-)
Former IPC [2019/25]H04L12/26
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/25]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:NETZWERKSCHALTVERFAHREN UND ENDGERÄTEVORRICHTUNG[2020/13]
English:NETWORK SWITCHING METHOD AND TERMINAL DEVICE[2020/13]
French:PROCÉDÉ DE COMMUTATION DE RÉSEAU ET DISPOSITIF TERMINAL[2020/13]
Former [2019/25]NETZWERKSCHALTVERFAHREN, ENDGERÄTEVORRICHTUNG UND NETZWERKVORRICHTUNG
Former [2019/25]NETWORK SWITCHING METHOD, TERMINAL DEVICE, AND NETWORK DEVICE
Former [2019/25]PROCÉDÉ DE COMMUTATION DE RÉSEAU, DISPOSITIF TERMINAL ET DISPOSITIF DE RÉSEAU
Entry into regional phase13.03.2019Translation filed 
13.03.2019National basic fee paid 
13.03.2019Search fee paid 
13.03.2019Designation fee(s) paid 
13.03.2019Examination fee paid 
Examination procedure13.03.2019Examination requested  [2019/25]
07.10.2019Amendment by applicant (claims and/or description)
12.03.2020Communication of intention to grant the patent
27.04.2020Fee for grant paid
27.04.2020Fee for publishing/printing paid
27.04.2020Receipt of the translation of the claim(s)
Opposition(s)11.03.2021No opposition filed within time limit [2021/20]
Fees paidRenewal fee
27.09.2019Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.09.2017
AL10.06.2020
AT10.06.2020
CY10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
MK10.06.2020
MT10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
TR10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IE26.09.2020
LU26.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
IS10.10.2020
PT12.10.2020
[2022/33]
Former [2022/28]HU26.09.2017
AL10.06.2020
AT10.06.2020
CY10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MC10.06.2020
MT10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
TR10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IE26.09.2020
LU26.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
IS10.10.2020
PT12.10.2020
Former [2022/27]HU26.09.2017
AL10.06.2020
AT10.06.2020
CY10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
MT10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
TR10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IE26.09.2020
LU26.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/37]AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IE26.09.2020
LU26.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/36]AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
LU26.09.2020
BE30.09.2020
FR30.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/35]AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
LU26.09.2020
FR30.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/27]AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
LU26.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/24]AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SI10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/21]AL10.06.2020
AT10.06.2020
CZ10.06.2020
DK10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/10]AL10.06.2020
AT10.06.2020
CZ10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
PL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SK10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
IS10.10.2020
PT12.10.2020
Former [2021/09]AL10.06.2020
AT10.06.2020
CZ10.06.2020
EE10.06.2020
ES10.06.2020
FI10.06.2020
HR10.06.2020
IT10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
RO10.06.2020
RS10.06.2020
SE10.06.2020
SM10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
PT12.10.2020
Former [2021/04]AL10.06.2020
FI10.06.2020
HR10.06.2020
LT10.06.2020
LV10.06.2020
NL10.06.2020
RS10.06.2020
SE10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
Former [2021/01]FI10.06.2020
HR10.06.2020
LT10.06.2020
LV10.06.2020
RS10.06.2020
SE10.06.2020
BG10.09.2020
NO10.09.2020
GR11.09.2020
Former [2020/51]FI10.06.2020
HR10.06.2020
LT10.06.2020
LV10.06.2020
RS10.06.2020
SE10.06.2020
NO10.09.2020
GR11.09.2020
Former [2020/50]FI10.06.2020
HR10.06.2020
LT10.06.2020
LV10.06.2020
SE10.06.2020
NO10.09.2020
GR11.09.2020
Former [2020/48]FI10.06.2020
LT10.06.2020
SE10.06.2020
NO10.09.2020
Former [2020/47]LT10.06.2020
NO10.09.2020
Documents cited:Search[XY]US2017034749  (CHANDRAMOULI DEVAKI [US], et al);
 [YA]WO2017119247  (NEC CORP [JP]);
 EP3402267  [ ] (NEC CORP [JP]);
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.