| EP3709784 - COMPONENT MOUNTING LINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.09.2023 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 23.09.2022 | ||
| Former | Grant of patent is intended Status updated on 13.07.2022 | ||
| Former | Request for examination was made Status updated on 14.08.2020 | ||
| Former | The international publication has been made Status updated on 11.05.2019 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Fuji Corporation 19, Chausuyama Yamamachi Chiryu-shi, Aichi 472-8686 / JP | [2020/38] | Inventor(s) | 01 /
KURODA, Hideya c/o FUJI MACHINE MFG. CO. LTD. 19 Chausuyama Yamamachi Chiryu-shi Aichi 472-8686 / JP | [2020/38] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2020/38] | Application number, filing date | 17930236.9 | 06.11.2017 | [2020/38] | WO2017JP39927 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2019087391 | Date: | 09.05.2019 | Language: | JA | [2019/19] | Type: | A1 Application with search report | No.: | EP3709784 | Date: | 16.09.2020 | Language: | EN | [2020/38] | Type: | B1 Patent specification | No.: | EP3709784 | Date: | 26.10.2022 | Language: | EN | [2022/43] | Search report(s) | International search report - published on: | JP | 09.05.2019 | (Supplementary) European search report - dispatched on: | EP | 30.09.2020 | Classification | IPC: | H05K13/02, H05K13/04, H05K13/08 | [2020/44] | CPC: |
H05K13/086 (EP);
H05K13/0452 (US);
H05K13/0495 (EP);
H05K13/0882 (EP,US)
|
| Former IPC [2020/38] | H05K13/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/38] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | KOMPONENTENMONTAGELINIE | [2020/38] | English: | COMPONENT MOUNTING LINE | [2020/38] | French: | CHAÎNE DE MONTAGE DE COMPOSANTS | [2020/38] | Entry into regional phase | 29.04.2020 | Translation filed | 29.04.2020 | National basic fee paid | 29.04.2020 | Search fee paid | 29.04.2020 | Designation fee(s) paid | 29.04.2020 | Examination fee paid | Examination procedure | 29.04.2020 | Examination requested [2020/38] | 27.04.2021 | Amendment by applicant (claims and/or description) | 14.07.2022 | Communication of intention to grant the patent | 20.09.2022 | Fee for grant paid | 20.09.2022 | Fee for publishing/printing paid | 20.09.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 27.07.2023 | No opposition filed within time limit [2023/40] | Fees paid | Renewal fee | 29.04.2020 | Renewal fee patent year 03 | 13.11.2020 | Renewal fee patent year 04 | 19.10.2021 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.11.2017 | AL | 26.10.2022 | AT | 26.10.2022 | BG | 26.10.2022 | CY | 26.10.2022 | CZ | 26.10.2022 | DK | 26.10.2022 | EE | 26.10.2022 | ES | 26.10.2022 | FI | 26.10.2022 | HR | 26.10.2022 | IT | 26.10.2022 | LT | 26.10.2022 | LV | 26.10.2022 | MC | 26.10.2022 | MK | 26.10.2022 | MT | 26.10.2022 | NL | 26.10.2022 | PL | 26.10.2022 | RO | 26.10.2022 | RS | 26.10.2022 | SE | 26.10.2022 | SI | 26.10.2022 | SK | 26.10.2022 | SM | 26.10.2022 | TR | 26.10.2022 | IE | 06.11.2022 | LU | 06.11.2022 | BE | 30.11.2022 | CH | 30.11.2022 | LI | 30.11.2022 | FR | 26.12.2022 | GB | 26.01.2023 | NO | 26.01.2023 | GR | 27.01.2023 | IS | 26.02.2023 | PT | 27.02.2023 | [2024/44] |
| Former [2024/34] | HU | 06.11.2017 | |
| AL | 26.10.2022 | ||
| AT | 26.10.2022 | ||
| BG | 26.10.2022 | ||
| CY | 26.10.2022 | ||
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| IT | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| MK | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SI | 26.10.2022 | ||
| SK | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| TR | 26.10.2022 | ||
| IE | 06.11.2022 | ||
| LU | 06.11.2022 | ||
| BE | 30.11.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| FR | 26.12.2022 | ||
| GB | 26.01.2023 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2024/29] | HU | 06.11.2017 | |
| AL | 26.10.2022 | ||
| AT | 26.10.2022 | ||
| CY | 26.10.2022 | ||
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| IT | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| MK | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SI | 26.10.2022 | ||
| SK | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| TR | 26.10.2022 | ||
| IE | 06.11.2022 | ||
| LU | 06.11.2022 | ||
| BE | 30.11.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| FR | 26.12.2022 | ||
| GB | 26.01.2023 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2024/27] | HU | 06.11.2017 | |
| AL | 26.10.2022 | ||
| AT | 26.10.2022 | ||
| CY | 26.10.2022 | ||
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| IT | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| MK | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SI | 26.10.2022 | ||
| SK | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| IE | 06.11.2022 | ||
| LU | 06.11.2022 | ||
| BE | 30.11.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| FR | 26.12.2022 | ||
| GB | 26.01.2023 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2024/26] | HU | 06.11.2017 | |
| AL | 26.10.2022 | ||
| AT | 26.10.2022 | ||
| CY | 26.10.2022 | ||
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| IT | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SI | 26.10.2022 | ||
| SK | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| IE | 06.11.2022 | ||
| LU | 06.11.2022 | ||
| BE | 30.11.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| FR | 26.12.2022 | ||
| GB | 26.01.2023 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2024/24] | HU | 06.11.2017 | |
| AL | 26.10.2022 | ||
| AT | 26.10.2022 | ||
| CY | 26.10.2022 | ||
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SI | 26.10.2022 | ||
| SK | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| IE | 06.11.2022 | ||
| LU | 06.11.2022 | ||
| BE | 30.11.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| FR | 26.12.2022 | ||
| GB | 26.01.2023 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2024/21] | AL | 26.10.2022 | |
| AT | 26.10.2022 | ||
| CY | 26.10.2022 | ||
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SI | 26.10.2022 | ||
| SK | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| IE | 06.11.2022 | ||
| LU | 06.11.2022 | ||
| BE | 30.11.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| FR | 26.12.2022 | ||
| GB | 26.01.2023 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/52] | AL | 26.10.2022 | |
| AT | 26.10.2022 | ||
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SI | 26.10.2022 | ||
| SK | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| IE | 06.11.2022 | ||
| LU | 06.11.2022 | ||
| BE | 30.11.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| FR | 26.12.2022 | ||
| GB | 26.01.2023 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/51] | AL | 26.10.2022 | |
| AT | 26.10.2022 | ||
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SI | 26.10.2022 | ||
| SK | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| IE | 06.11.2022 | ||
| LU | 06.11.2022 | ||
| BE | 30.11.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| GB | 26.01.2023 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/49] | AL | 26.10.2022 | |
| AT | 26.10.2022 | ||
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SK | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| IE | 06.11.2022 | ||
| LU | 06.11.2022 | ||
| BE | 30.11.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| GB | 26.01.2023 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/48] | AL | 26.10.2022 | |
| AT | 26.10.2022 | ||
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SK | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| IE | 06.11.2022 | ||
| LU | 06.11.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| GB | 26.01.2023 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/47] | AL | 26.10.2022 | |
| AT | 26.10.2022 | ||
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SK | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| LU | 06.11.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| GB | 26.01.2023 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/38] | AL | 26.10.2022 | |
| AT | 26.10.2022 | ||
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SK | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| LU | 06.11.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/37] | AL | 26.10.2022 | |
| AT | 26.10.2022 | ||
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| LU | 06.11.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/36] | AT | 26.10.2022 | |
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| MC | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/35] | AT | 26.10.2022 | |
| CZ | 26.10.2022 | ||
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RO | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| CH | 30.11.2022 | ||
| LI | 30.11.2022 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/34] | AT | 26.10.2022 | |
| DK | 26.10.2022 | ||
| EE | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/33] | AT | 26.10.2022 | |
| DK | 26.10.2022 | ||
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| SM | 26.10.2022 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/25] | AT | 26.10.2022 | |
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| HR | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| PL | 26.10.2022 | ||
| RS | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| IS | 26.02.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/23] | AT | 26.10.2022 | |
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| LV | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| NO | 26.01.2023 | ||
| GR | 27.01.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/22] | AT | 26.10.2022 | |
| ES | 26.10.2022 | ||
| FI | 26.10.2022 | ||
| LT | 26.10.2022 | ||
| NL | 26.10.2022 | ||
| SE | 26.10.2022 | ||
| NO | 26.01.2023 | ||
| PT | 27.02.2023 | ||
| Former [2023/20] | LT | 26.10.2022 | |
| NL | 26.10.2022 | ||
| NO | 26.01.2023 | ||
| Former [2023/17] | NL | 26.10.2022 | Documents cited: | Search | [A] WO2017033268 (FUJI MACHINE MFG et al.) [A] 1-12 * See family member EP3344027 paragraphs [0019]-[0028]; [0039]-[0042]; paragraph [0019] - paragraph [0028]; figures 1-5 * | [A] WO2017141365 (FUJI MACHINE MFG et al.) [A] 1-12 * abstract * | International search | [A] WO2017141365 (FUJI MACHINE MFG et al.) [A] 1-12 * , entire text, all drawings (Family: none) * | [A] WO2017033268 (FUJI MACHINE MFG et al.) [A] 1-12 * , entire text, all drawings (Family: none) * | [A] JP2004104075 (FUJI MACHINE MFG et al.) [A] 1-12 * , entire text, all drawings & CN 1505467 A & CN 101277604 A & CN 101277605 A & CN 101282636 A * | [A] WO2014010083 (FUJI MACHINE MFG et al.) [A] 1-12 * , entire text, all drawings & EP 2874480 A1, entire text, all drawings * | Examination | EP3344027 | by applicant | WO2016035145 |