blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3388270

EP3388270 - CONNECTING STRUCTURE BETWEEN A COWL LOUVER AND A WINDSHIELD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.06.2022
Database last updated on 04.06.2024
FormerThe patent has been granted
Status updated on  09.07.2021
FormerGrant of patent is intended
Status updated on  04.03.2021
FormerExamination is in progress
Status updated on  17.12.2019
FormerRequest for examination was made
Status updated on  19.04.2019
FormerThe application has been published
Status updated on  14.09.2018
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
AGC Inc.
5-1, Marunouchi 1-chome
Chiyoda-ku
Tokyo 100-8405 / JP
[2018/42]
Inventor(s)01 / OKI, Eiji
c/o Asahi Glass Company, Limited, 5-1, Marunouchi
1-chome, Chiyoda-ku
Tokyo, 100-8405 / JP
 [2018/42]
Representative(s)Müller-Boré & Partner Patentanwälte PartG mbB
Friedenheimer Brücke 21
80639 München / DE
[2018/42]
Application number, filing date18000302.228.03.2018
[2018/42]
Priority number, dateJP2017007896212.04.2017         Original published format: JP 2017078962
[2018/42]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3388270
Date:17.10.2018
Language:EN
[2018/42]
Type: B1 Patent specification 
No.:EP3388270
Date:11.08.2021
Language:EN
[2021/32]
Search report(s)(Supplementary) European search report - dispatched on:EP04.06.2018
ClassificationIPC:B60J10/70, H05B3/86
[2018/42]
CPC:
B60J10/70 (EP,US); B60J1/02 (CN,US); B60J10/33 (US);
B62D25/081 (US); B62D25/12 (CN); H05B3/86 (EP,US);
B60R16/03 (US); H05B2203/013 (EP,US); H05B2203/016 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/21]
Former [2018/42]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERBINDUNGSSTRUKTUR ZWISCHEN EINER VERKLEIDUNGSLAMELLE UND EINER WINDSCHUTZSCHEIBE[2018/42]
English:CONNECTING STRUCTURE BETWEEN A COWL LOUVER AND A WINDSHIELD[2018/42]
French:STRUCTURE DE CONNEXION ENTRE UNE FENTE DE CAPOT ET UN PARE-BRISE[2018/42]
Examination procedure08.04.2019Amendment by applicant (claims and/or description)
11.04.2019Examination requested  [2019/21]
11.04.2019Date on which the examining division has become responsible
20.12.2019Despatch of a communication from the examining division (Time limit: M04)
16.04.2020Reply to a communication from the examining division
22.07.2020Despatch of a communication from the examining division (Time limit: M04)
20.11.2020Reply to a communication from the examining division
05.03.2021Communication of intention to grant the patent
05.07.2021Fee for grant paid
05.07.2021Fee for publishing/printing paid
05.07.2021Receipt of the translation of the claim(s)
Opposition(s)12.05.2022No opposition filed within time limit [2022/29]
Fees paidRenewal fee
06.03.2020Renewal fee patent year 03
16.03.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.03.2018
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
MK11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB28.03.2022
IE28.03.2022
LU28.03.2022
BE31.03.2022
CH31.03.2022
FR31.03.2022
LI31.03.2022
[2024/23]
Former [2024/20]HU28.03.2018
AL11.08.2021
AT11.08.2021
CY11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB28.03.2022
IE28.03.2022
LU28.03.2022
BE31.03.2022
CH31.03.2022
FR31.03.2022
LI31.03.2022
Former [2024/18]HU28.03.2018
AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB28.03.2022
IE28.03.2022
LU28.03.2022
BE31.03.2022
CH31.03.2022
FR31.03.2022
LI31.03.2022
Former [2023/10]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB28.03.2022
IE28.03.2022
LU28.03.2022
BE31.03.2022
CH31.03.2022
FR31.03.2022
LI31.03.2022
Former [2023/09]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB28.03.2022
IE28.03.2022
LU28.03.2022
CH31.03.2022
FR31.03.2022
LI31.03.2022
Former [2023/08]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
GB28.03.2022
IE28.03.2022
LU28.03.2022
FR31.03.2022
Former [2023/06]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
FR31.03.2022
Former [2022/47]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
MC11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/36]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
IT11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SI11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/29]AL11.08.2021
AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/25]AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
SM11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/24]AT11.08.2021
CZ11.08.2021
DK11.08.2021
EE11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RO11.08.2021
RS11.08.2021
SE11.08.2021
SK11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/21]AT11.08.2021
DK11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/16]AT11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
NL11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/10]AT11.08.2021
ES11.08.2021
FI11.08.2021
HR11.08.2021
LT11.08.2021
LV11.08.2021
PL11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
GR12.11.2021
IS11.12.2021
PT13.12.2021
Former [2022/09]AT11.08.2021
ES11.08.2021
FI11.08.2021
LT11.08.2021
RS11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
PT13.12.2021
Former [2022/08]AT11.08.2021
ES11.08.2021
FI11.08.2021
LT11.08.2021
SE11.08.2021
BG11.11.2021
NO11.11.2021
Former [2022/07]AT11.08.2021
LT11.08.2021
NO11.11.2021
Documents cited:Search[YDA]JPH0597061  (TOYODA GOSEI KK) [YD] 1-5,7-9 * figures 1-3 * [A] 6;
 [YA]WO2013114855  (NIPPON SHEET GLASS CO LTD [JP]) [Y] 1-5,7 * figures 1-4 *[A] 6;
 [YA]US2014374401  (NAKAGAWA MASAFUMI [JP]) [Y] 1-5,7-9 * figures 1-10 * * paragraph [0003] * * sentence 1, paragraph 51 - sentence 2 * [A] 6
ExaminationJP2010264868
 US2016001744
by applicantJPH0597061
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.