blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3511191

EP3511191 - HEATING OF A CHARGING CABLE FOR A QUICK CHARGING STATION FOR ELECTRICALLY DRIVEN VEHICLES AND QUICK CHARGING STATION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.01.2024
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  03.02.2023
FormerGrant of patent is intended
Status updated on  07.12.2022
FormerExamination is in progress
Status updated on  25.06.2021
FormerRequest for examination was made
Status updated on  24.01.2020
FormerThe application has been published
Status updated on  14.06.2019
Most recent event   Tooltip02.08.2024Lapse of the patent in a contracting state
New state(s): BE
published on 04.09.2024  [2024/36]
Applicant(s)For all designated states
Dr.Ing. H.C. F. Porsche Aktiengesellschaft
Porscheplatz 1
70435 Stuttgart / DE
[2019/29]
Inventor(s)01 / Reber, Volker
Sanddornstraße 32
74544 Michelbach a. d. Bilz / DE
02 / Götz, Stefan
Schützenweg 5
85659 Forstern / DE
03 / Rönfanz, Jari
Haldenstrasse 22
75417 Mühlacker / DE
 [2019/29]
Application number, filing date18020511.418.10.2018
[2019/29]
Priority number, dateDE20181010073115.01.2018         Original published format: DE102018100731
[2019/29]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3511191
Date:17.07.2019
Language:DE
[2019/29]
Type: B1 Patent specification 
No.:EP3511191
Date:08.03.2023
Language:DE
[2023/10]
Search report(s)(Supplementary) European search report - dispatched on:EP31.05.2019
ClassificationIPC:B60L1/02, B60L1/04, B60L53/18
[2019/29]
CPC:
B60L1/02 (EP,US); H01B7/42 (CN,US); B60L5/02 (US);
B60L1/04 (EP,US); B60L53/18 (EP,US); B60R16/033 (US);
H05B3/12 (US); Y02T10/70 (EP); Y02T10/7072 (EP);
Y02T90/12 (EP); Y02T90/14 (EP); Y02T90/16 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/09]
Former [2019/29]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:TEMPERIEREN EINES LADEKABELS FÜR EINE SCHNELLADESTATION FÜR FAHRZEUGE MIT ELEKTRISCHEM ANTRIEB SOWIE SCHNELLLADESTATION[2019/29]
English:HEATING OF A CHARGING CABLE FOR A QUICK CHARGING STATION FOR ELECTRICALLY DRIVEN VEHICLES AND QUICK CHARGING STATION[2019/29]
French:CHAUFFAGE D'UN CÂBLE DE CHARGE POUR UNE STATION DE CHARGE RAPIDE POUR VÉHICULES À ENTRAÎNEMENT ÉLECTRIQUE ET STATION DE CHARGE RAPIDE[2019/29]
Examination procedure24.07.2019Amendment by applicant (claims and/or description)
17.01.2020Examination requested  [2020/09]
17.01.2020Date on which the examining division has become responsible
25.06.2021Despatch of a communication from the examining division (Time limit: M04)
15.09.2021Reply to a communication from the examining division
08.12.2022Communication of intention to grant the patent
23.01.2023Fee for grant paid
23.01.2023Fee for publishing/printing paid
23.01.2023Receipt of the translation of the claim(s)
Opposition(s)11.12.2023No opposition filed within time limit [2024/07]
Fees paidRenewal fee
02.11.2020Renewal fee patent year 03
02.11.2021Renewal fee patent year 04
31.10.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ08.03.2023
DK08.03.2023
EE08.03.2023
ES08.03.2023
FI08.03.2023
HR08.03.2023
IT08.03.2023
LT08.03.2023
LV08.03.2023
MC08.03.2023
NL08.03.2023
PL08.03.2023
RO08.03.2023
RS08.03.2023
SE08.03.2023
SI08.03.2023
SK08.03.2023
SM08.03.2023
NO08.06.2023
GR09.06.2023
IS08.07.2023
PT10.07.2023
LU18.10.2023
BE31.10.2023
CH31.10.2023
[2024/36]
Former [2024/34]CZ08.03.2023
DK08.03.2023
EE08.03.2023
ES08.03.2023
FI08.03.2023
HR08.03.2023
IT08.03.2023
LT08.03.2023
LV08.03.2023
MC08.03.2023
NL08.03.2023
PL08.03.2023
RO08.03.2023
RS08.03.2023
SE08.03.2023
SI08.03.2023
SK08.03.2023
SM08.03.2023
NO08.06.2023
GR09.06.2023
IS08.07.2023
PT10.07.2023
LU18.10.2023
CH31.10.2023
Former [2024/30]CZ08.03.2023
DK08.03.2023
EE08.03.2023
ES08.03.2023
FI08.03.2023
HR08.03.2023
IT08.03.2023
LT08.03.2023
LV08.03.2023
MC08.03.2023
NL08.03.2023
PL08.03.2023
RO08.03.2023
RS08.03.2023
SE08.03.2023
SI08.03.2023
SK08.03.2023
SM08.03.2023
NO08.06.2023
GR09.06.2023
IS08.07.2023
PT10.07.2023
LU18.10.2023
Former [2024/28]CZ08.03.2023
DK08.03.2023
EE08.03.2023
ES08.03.2023
FI08.03.2023
HR08.03.2023
IT08.03.2023
LT08.03.2023
LV08.03.2023
MC08.03.2023
NL08.03.2023
PL08.03.2023
RO08.03.2023
RS08.03.2023
SE08.03.2023
SI08.03.2023
SK08.03.2023
SM08.03.2023
NO08.06.2023
GR09.06.2023
IS08.07.2023
PT10.07.2023
Former [2024/26]CZ08.03.2023
DK08.03.2023
EE08.03.2023
ES08.03.2023
FI08.03.2023
HR08.03.2023
IT08.03.2023
LT08.03.2023
LV08.03.2023
NL08.03.2023
PL08.03.2023
RO08.03.2023
RS08.03.2023
SE08.03.2023
SI08.03.2023
SK08.03.2023
SM08.03.2023
NO08.06.2023
GR09.06.2023
IS08.07.2023
PT10.07.2023
Former [2024/10]CZ08.03.2023
DK08.03.2023
EE08.03.2023
ES08.03.2023
FI08.03.2023
HR08.03.2023
LT08.03.2023
LV08.03.2023
NL08.03.2023
PL08.03.2023
RO08.03.2023
RS08.03.2023
SE08.03.2023
SI08.03.2023
SK08.03.2023
SM08.03.2023
NO08.06.2023
GR09.06.2023
IS08.07.2023
PT10.07.2023
Former [2023/50]CZ08.03.2023
EE08.03.2023
ES08.03.2023
FI08.03.2023
HR08.03.2023
LT08.03.2023
LV08.03.2023
NL08.03.2023
PL08.03.2023
RO08.03.2023
RS08.03.2023
SE08.03.2023
SK08.03.2023
SM08.03.2023
NO08.06.2023
GR09.06.2023
IS08.07.2023
PT10.07.2023
Former [2023/49]CZ08.03.2023
EE08.03.2023
ES08.03.2023
FI08.03.2023
HR08.03.2023
LT08.03.2023
LV08.03.2023
NL08.03.2023
RO08.03.2023
RS08.03.2023
SE08.03.2023
SM08.03.2023
NO08.06.2023
GR09.06.2023
PT10.07.2023
Former [2023/48]EE08.03.2023
ES08.03.2023
FI08.03.2023
HR08.03.2023
LT08.03.2023
LV08.03.2023
NL08.03.2023
RS08.03.2023
SE08.03.2023
SM08.03.2023
NO08.06.2023
GR09.06.2023
PT10.07.2023
Former [2023/46]ES08.03.2023
FI08.03.2023
HR08.03.2023
LT08.03.2023
LV08.03.2023
NL08.03.2023
RS08.03.2023
SE08.03.2023
SM08.03.2023
NO08.06.2023
GR09.06.2023
PT10.07.2023
Former [2023/38]ES08.03.2023
FI08.03.2023
HR08.03.2023
LT08.03.2023
LV08.03.2023
NL08.03.2023
RS08.03.2023
SE08.03.2023
NO08.06.2023
GR09.06.2023
Former [2023/37]ES08.03.2023
FI08.03.2023
HR08.03.2023
LT08.03.2023
LV08.03.2023
RS08.03.2023
SE08.03.2023
NO08.06.2023
GR09.06.2023
Former [2023/36]ES08.03.2023
FI08.03.2023
HR08.03.2023
LT08.03.2023
LV08.03.2023
RS08.03.2023
SE08.03.2023
NO08.06.2023
Former [2023/35]ES08.03.2023
HR08.03.2023
LT08.03.2023
RS08.03.2023
NO08.06.2023
Former [2023/34]ES08.03.2023
LT08.03.2023
RS08.03.2023
Former [2023/33]ES08.03.2023
LT08.03.2023
Documents cited:Search[A]JPH10108376  (SUMITOMO WIRING SYSTEMS, et al) [A] 1-10* the whole document *;
 [X]JP2010193618  (TOYOTA MOTOR CORP) [X] 1,10 * the whole document *;
 [A]DE202011050446U  (AMAD MENNEKES HOLDING GMBH & CO KG [DE]) [A] 1-10 * the whole document *;
 [XAI]DE102012208005  (BOSCH GMBH ROBERT [DE]) [X] 1 * paragraph [0009] - paragraph [0011] * * paragraph [0039]; figures 1-6 * [A] 7,8 [I] 2-6,9
by applicantUS2011199047
 DE102011119495
 US2015115889
 US9321364
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.