blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3489044

EP3489044 - WARRANT RECORDING SYSTEM AND SETTING APPARATUS FOR PRESSURE DETECTOR [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.05.2022
Database last updated on 29.06.2024
FormerThe patent has been granted
Status updated on  18.06.2021
FormerGrant of patent is intended
Status updated on  09.02.2021
FormerRequest for examination was made
Status updated on  05.12.2019
FormerThe application has been published
Status updated on  26.04.2019
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
CUB Elecparts Inc.
No. 6, Ln. 546, Sec. 6
Changlu Rd.
50648 Fuhsin Township, Changhua County / TW
[2019/22]
Inventor(s)01 / YU, San-Chuan
No. 6, Lane 546, Sec. 6, Changlu Rd.
50648 Fuhsin Township, Changhua County / TW
02 / HU, Chao-Ching
No. 6, Lane 546, Sec. 6, Changlu Rd.
50648 Fuhsin Township, Changhua County / TW
03 / CHEN, Li-Li
No. 6, Lane 546, Sec. 6, Changlu Rd.
50648 Fuhsin Township, Changhua County / TW
04 / CHI, Ya-Ling
No. 6, Lane 546, Sec. 6, Changlu Rd.
50648 Fuhsin Township, Changhua County / TW
 [2019/22]
Representative(s)Viering, Jentschura & Partner mbB Patent- und Rechtsanwälte
Hamborner Straße 53
40472 Düsseldorf / DE
[2021/29]
Former [2019/22]Viering, Jentschura & Partner mbB Patent- und Rechtsanwälte
Kennedydamm 55 / Roßstrasse
40476 Düsseldorf / DE
Application number, filing date18155501.207.02.2018
[2019/22]
Priority number, dateTW2017014106724.11.2017         Original published format: TW 106141067
[2019/22]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3489044
Date:29.05.2019
Language:EN
[2019/22]
Type: B1 Patent specification 
No.:EP3489044
Date:21.07.2021
Language:EN
[2021/29]
Search report(s)(Supplementary) European search report - dispatched on:EP10.09.2018
ClassificationIPC:B60C23/04
[2019/22]
CPC:
B60C23/0479 (EP,US); B60C23/0471 (EP,US); B60C23/0488 (US);
G01L17/00 (US); B60C23/0462 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/01]
Former [2019/22]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:AUFZEICHNUNGSSYSTEM FÜR EIN GARANTIEZEITPUNKT, UND EINSTELVORRICHTUNG FÜR DEN REIFENDRUCKSENSORMODUL[2019/22]
English:WARRANT RECORDING SYSTEM AND SETTING APPARATUS FOR PRESSURE DETECTOR[2019/22]
French:SYSTÈME D'ENREGISTREMENT DE DATE DE GARANTIE ET APPAREIL DE PROGRAMMATION DU MODULE DE ROUE[2019/22]
Examination procedure22.11.2019Amendment by applicant (claims and/or description)
22.11.2019Examination requested  [2020/01]
22.11.2019Date on which the examining division has become responsible
10.02.2021Communication of intention to grant the patent
10.06.2021Fee for grant paid
10.06.2021Fee for publishing/printing paid
10.06.2021Receipt of the translation of the claim(s)
Opposition(s)22.04.2022No opposition filed within time limit [2022/26]
Fees paidRenewal fee
27.02.2020Renewal fee patent year 03
10.02.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.02.2018
AL21.07.2021
AT21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
MK21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE07.02.2022
LU07.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
[2024/23]
Former [2024/20]HU07.02.2018
AL21.07.2021
AT21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE07.02.2022
LU07.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
Former [2024/18]HU07.02.2018
AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE07.02.2022
LU07.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
Former [2023/10]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE07.02.2022
LU07.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
Former [2023/09]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE07.02.2022
LU07.02.2022
CH28.02.2022
LI28.02.2022
Former [2022/47]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
LU07.02.2022
Former [2022/44]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/29]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/25]AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/24]AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SK21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/21]AT21.07.2021
DK21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RS21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/11]AT21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RS21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/09]AT21.07.2021
ES21.07.2021
FI21.07.2021
LT21.07.2021
NL21.07.2021
RS21.07.2021
BG21.10.2021
NO21.10.2021
PT22.11.2021
Former [2022/08]AT21.07.2021
ES21.07.2021
FI21.07.2021
LT21.07.2021
NL21.07.2021
BG21.10.2021
NO21.10.2021
Former [2022/07]AT21.07.2021
LT21.07.2021
NL21.07.2021
NO21.10.2021
Documents cited:Search[A]US2007222568  (MORAR JOHN F [US], et al) [A] 1-13 * paragraph [0029]; figure 1 *;
 [A]US2009145216  (HUANG SU SHIONG [US], et al) [A] 1-13* paragraph [0024] *;
 [A]GB2500697  (SCHRADER ELECTRONICS LTD [GB]) [A] 1-13 * page 16, paragraph last; figure 1 *;
 [A]US2015015387  (MCINTYRE MATTHEW D [US], et al) [A] 1-13 * paragraph [0005]; figure 3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.