| EP3363359 - MULTI-AXIAL POSITION SENSORS PRINTED ON A FOLDED FLEXIBLE CIRCUIT BOARD AND METHOD OF PRODUCING THE SAME [Right-click to bookmark this link] | |||
| Former [2018/34] | MULTI-AXIAL POSITION SENSORS PRINTED ON A FOLDED FLEXIBLE CIRCUIT BOARD | ||
| [2020/39] | Status | No opposition filed within time limit Status updated on 15.04.2022 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 11.05.2021 | ||
| Former | Grant of patent is intended Status updated on 16.03.2021 | ||
| Former | Examination is in progress Status updated on 05.02.2021 | ||
| Former | Grant of patent is intended Status updated on 23.09.2020 | ||
| Former | Examination is in progress Status updated on 13.12.2019 | ||
| Former | Request for examination was made Status updated on 01.03.2019 | ||
| Former | The application has been published Status updated on 20.07.2018 | Most recent event Tooltip | 13.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 16.10.2024 [2024/42] | Applicant(s) | For all designated states Biosense Webster (Israel) Ltd. 4 Hatnufa Street Yokneam 2066717 / IL | [2018/34] | Inventor(s) | 01 /
GOVARI, Assaf c/o BIOSENSE WEBSTER (ISRAEL) LTD. P.O. Box 275 4 Hatnufa Street 2066717 Yokneam / IL | 02 /
BAR-TAL, Meir c/o BIOSENSE WEBSTER (ISRAEL) LTD P.O. Box 275 4 Hatnufa Street 2066717 Yokneam / IL | 03 /
REUVENI, Avi c/o BIOSENSE WEBSTER (ISRAEL) LTD P.O. Box 275 4 Hatnufa Street 2066717 Yokneam / IL | [2018/34] | Representative(s) | Carpmaels & Ransford LLP One Southampton Row London WC1B 5HA / GB | [2018/34] | Application number, filing date | 18156795.9 | 14.02.2018 | [2018/34] | Priority number, date | US201715433072 | 15.02.2017 Original published format: US201715433072 | [2018/34] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3363359 | Date: | 22.08.2018 | Language: | EN | [2018/34] | Type: | B1 Patent specification | No.: | EP3363359 | Date: | 09.06.2021 | Language: | EN | [2021/23] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 28.06.2018 | Classification | IPC: | A61B5/06, A61B5/00, H01F5/00, H01F41/04, // A61B18/00, A61B34/20, H05K1/02, H05K1/16, H01F17/00, H01F27/28 | [2018/34] | CPC: |
A61B5/062 (EP,IL,US);
A61B18/1492 (CN,IL,US);
A61B5/287 (CN,US);
A61B34/00 (IL,US);
A61B5/283 (CN);
A61B5/6851 (EP,IL,US);
A61B5/6852 (EP,IL,US);
A61B5/6859 (CN);
H01F41/041 (EP,IL,US);
H01F5/003 (EP,IL,US);
H05K1/028 (EP,IL,US);
H05K1/165 (EP,IL,US);
A61B2018/0016 (CN);
A61B2018/00351 (CN,IL,US);
A61B2018/00577 (IL,US);
A61B2034/2051 (EP,IL,US);
A61B2560/0468 (EP,IL,US);
A61B2562/0223 (EP,IL,US);
A61B2562/04 (EP,IL,US);
A61B2562/06 (EP,IL,US);
A61B2562/12 (EP,IL,US);
A61B2562/125 (EP,IL,US);
A61B2562/164 (EP,IL,US);
A61B2562/166 (EP,IL,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/14] |
| Former [2018/34] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | AUF EINE GEFALTETE FLEXIBLE LEITERPLATTE GEDRUCKTE, MULTIAXIALE POSITIONSSENSOREN UND VERFAHREN ZU DEREN HERSTELLUNG | [2020/39] | English: | MULTI-AXIAL POSITION SENSORS PRINTED ON A FOLDED FLEXIBLE CIRCUIT BOARD AND METHOD OF PRODUCING THE SAME | [2020/39] | French: | CAPTEURS DE POSITION MULTI-AXIAUX IMPRIMÉS SUR UNE CARTE DE CIRCUIT FLEXIBLE PLIÉE ET PROCÉDÉ DE FABRICATION | [2020/39] |
| Former [2018/34] | AUF EINE GEFALTETE FLEXIBLE LEITERPLATTE GEDRUCKTE, MULTIAXIALE POSITIONSSENSOREN | ||
| Former [2018/34] | MULTI-AXIAL POSITION SENSORS PRINTED ON A FOLDED FLEXIBLE CIRCUIT BOARD | ||
| Former [2018/34] | CAPTEURS DE POSITION MULTI-AXIAUX IMPRIMÉS SUR UNE CARTE DE CIRCUIT FLEXIBLE PLIÉE | Examination procedure | 20.02.2019 | Examination requested [2019/14] | 20.02.2019 | Date on which the examining division has become responsible | 21.02.2019 | Amendment by applicant (claims and/or description) | 17.12.2019 | Despatch of a communication from the examining division (Time limit: M04) | 24.04.2020 | Reply to a communication from the examining division | 24.09.2020 | Communication of intention to grant the patent | 02.02.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 17.03.2021 | Communication of intention to grant the patent | 27.04.2021 | Fee for grant paid | 27.04.2021 | Fee for publishing/printing paid | 27.04.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21163765.7 / EP3858233 | EP24173489.6 / EP4383290 | Opposition(s) | 10.03.2022 | No opposition filed within time limit [2022/20] | Fees paid | Renewal fee | 13.02.2020 | Renewal fee patent year 03 | 12.02.2021 | Renewal fee patent year 04 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.02.2018 | AL | 09.06.2021 | AT | 09.06.2021 | CY | 09.06.2021 | CZ | 09.06.2021 | DK | 09.06.2021 | EE | 09.06.2021 | ES | 09.06.2021 | FI | 09.06.2021 | HR | 09.06.2021 | LT | 09.06.2021 | LV | 09.06.2021 | MC | 09.06.2021 | MK | 09.06.2021 | MT | 09.06.2021 | PL | 09.06.2021 | RO | 09.06.2021 | RS | 09.06.2021 | SE | 09.06.2021 | SI | 09.06.2021 | SK | 09.06.2021 | SM | 09.06.2021 | TR | 09.06.2021 | BG | 09.09.2021 | NO | 09.09.2021 | GR | 10.09.2021 | IS | 09.10.2021 | PT | 11.10.2021 | IE | 14.02.2022 | LU | 14.02.2022 | BE | 28.02.2022 | CH | 28.02.2022 | LI | 28.02.2022 | [2024/42] |
| Former [2024/29] | HU | 14.02.2018 | |
| AL | 09.06.2021 | ||
| AT | 09.06.2021 | ||
| CY | 09.06.2021 | ||
| CZ | 09.06.2021 | ||
| DK | 09.06.2021 | ||
| EE | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| MC | 09.06.2021 | ||
| MK | 09.06.2021 | ||
| PL | 09.06.2021 | ||
| RO | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SI | 09.06.2021 | ||
| SK | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| TR | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| IS | 09.10.2021 | ||
| PT | 11.10.2021 | ||
| IE | 14.02.2022 | ||
| LU | 14.02.2022 | ||
| BE | 28.02.2022 | ||
| CH | 28.02.2022 | ||
| LI | 28.02.2022 | ||
| Former [2024/23] | HU | 14.02.2018 | |
| AL | 09.06.2021 | ||
| AT | 09.06.2021 | ||
| CY | 09.06.2021 | ||
| CZ | 09.06.2021 | ||
| DK | 09.06.2021 | ||
| EE | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| MC | 09.06.2021 | ||
| MK | 09.06.2021 | ||
| PL | 09.06.2021 | ||
| RO | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SI | 09.06.2021 | ||
| SK | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| IS | 09.10.2021 | ||
| PT | 11.10.2021 | ||
| IE | 14.02.2022 | ||
| LU | 14.02.2022 | ||
| BE | 28.02.2022 | ||
| CH | 28.02.2022 | ||
| LI | 28.02.2022 | ||
| Former [2024/20] | HU | 14.02.2018 | |
| AL | 09.06.2021 | ||
| AT | 09.06.2021 | ||
| CY | 09.06.2021 | ||
| CZ | 09.06.2021 | ||
| DK | 09.06.2021 | ||
| EE | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| MC | 09.06.2021 | ||
| PL | 09.06.2021 | ||
| RO | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SI | 09.06.2021 | ||
| SK | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| IS | 09.10.2021 | ||
| PT | 11.10.2021 | ||
| IE | 14.02.2022 | ||
| LU | 14.02.2022 | ||
| BE | 28.02.2022 | ||
| CH | 28.02.2022 | ||
| LI | 28.02.2022 | ||
| Former [2024/18] | HU | 14.02.2018 | |
| AL | 09.06.2021 | ||
| AT | 09.06.2021 | ||
| CZ | 09.06.2021 | ||
| DK | 09.06.2021 | ||
| EE | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| MC | 09.06.2021 | ||
| PL | 09.06.2021 | ||
| RO | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SI | 09.06.2021 | ||
| SK | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| IS | 09.10.2021 | ||
| PT | 11.10.2021 | ||
| IE | 14.02.2022 | ||
| LU | 14.02.2022 | ||
| BE | 28.02.2022 | ||
| CH | 28.02.2022 | ||
| LI | 28.02.2022 | ||
| Former [2023/10] | AL | 09.06.2021 | |
| AT | 09.06.2021 | ||
| CZ | 09.06.2021 | ||
| DK | 09.06.2021 | ||
| EE | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| MC | 09.06.2021 | ||
| PL | 09.06.2021 | ||
| RO | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SI | 09.06.2021 | ||
| SK | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| IS | 09.10.2021 | ||
| PT | 11.10.2021 | ||
| IE | 14.02.2022 | ||
| LU | 14.02.2022 | ||
| BE | 28.02.2022 | ||
| CH | 28.02.2022 | ||
| LI | 28.02.2022 | ||
| Former [2023/09] | AL | 09.06.2021 | |
| AT | 09.06.2021 | ||
| CZ | 09.06.2021 | ||
| DK | 09.06.2021 | ||
| EE | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| MC | 09.06.2021 | ||
| PL | 09.06.2021 | ||
| RO | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SI | 09.06.2021 | ||
| SK | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| IS | 09.10.2021 | ||
| PT | 11.10.2021 | ||
| IE | 14.02.2022 | ||
| LU | 14.02.2022 | ||
| CH | 28.02.2022 | ||
| LI | 28.02.2022 | ||
| Former [2022/47] | AL | 09.06.2021 | |
| AT | 09.06.2021 | ||
| CZ | 09.06.2021 | ||
| DK | 09.06.2021 | ||
| EE | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| MC | 09.06.2021 | ||
| PL | 09.06.2021 | ||
| RO | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SI | 09.06.2021 | ||
| SK | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| IS | 09.10.2021 | ||
| PT | 11.10.2021 | ||
| LU | 14.02.2022 | ||
| Former [2022/44] | AL | 09.06.2021 | |
| AT | 09.06.2021 | ||
| CZ | 09.06.2021 | ||
| DK | 09.06.2021 | ||
| EE | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| MC | 09.06.2021 | ||
| PL | 09.06.2021 | ||
| RO | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SI | 09.06.2021 | ||
| SK | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| IS | 09.10.2021 | ||
| PT | 11.10.2021 | ||
| Former [2022/29] | AL | 09.06.2021 | |
| AT | 09.06.2021 | ||
| CZ | 09.06.2021 | ||
| DK | 09.06.2021 | ||
| EE | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| PL | 09.06.2021 | ||
| RO | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SI | 09.06.2021 | ||
| SK | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| IS | 09.10.2021 | ||
| PT | 11.10.2021 | ||
| Former [2022/26] | AL | 09.06.2021 | |
| AT | 09.06.2021 | ||
| CZ | 09.06.2021 | ||
| DK | 09.06.2021 | ||
| EE | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| PL | 09.06.2021 | ||
| RO | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SK | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| IS | 09.10.2021 | ||
| PT | 11.10.2021 | ||
| Former [2022/21] | AT | 09.06.2021 | |
| CZ | 09.06.2021 | ||
| DK | 09.06.2021 | ||
| EE | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| PL | 09.06.2021 | ||
| RO | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SK | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| IS | 09.10.2021 | ||
| PT | 11.10.2021 | ||
| Former [2022/10] | AT | 09.06.2021 | |
| CZ | 09.06.2021 | ||
| EE | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| PL | 09.06.2021 | ||
| RO | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SK | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| IS | 09.10.2021 | ||
| PT | 11.10.2021 | ||
| Former [2022/09] | AT | 09.06.2021 | |
| CZ | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| RO | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SK | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| PT | 11.10.2021 | ||
| Former [2022/08] | AT | 09.06.2021 | |
| CZ | 09.06.2021 | ||
| ES | 09.06.2021 | ||
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| Former [2022/07] | AT | 09.06.2021 | |
| FI | 09.06.2021 | ||
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| SM | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| Former [2021/51] | FI | 09.06.2021 | |
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| RS | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| Former [2021/49] | FI | 09.06.2021 | |
| HR | 09.06.2021 | ||
| LT | 09.06.2021 | ||
| LV | 09.06.2021 | ||
| SE | 09.06.2021 | ||
| BG | 09.09.2021 | ||
| NO | 09.09.2021 | ||
| GR | 10.09.2021 | ||
| Former [2021/46] | FI | 09.06.2021 | |
| LT | 09.06.2021 | ||
| BG | 09.09.2021 | Documents cited: | Search | [I] US2003187347 (NEVO EREZ et al.) | [I] US2007080682 (GOVARI ASSAF et al.) | [A] US2012029343 (WASSON JAMES R et al.) | Examination | US2014276004 | by applicant | US8504133 | US5722401 | US5391199 | US6690963 | US6484118 | US6239724 | US6618612 | US6332089 | WO9605768 | US2002065455 | US2003120150 | US2004068178 |