blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3366207

EP3366207 - HIGHLIGHTING AN ELECTRODE IMAGE ACCORDING TO AN ELECTRODE SIGNAL [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  12.08.2022
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  03.09.2021
FormerGrant of patent is intended
Status updated on  09.08.2021
FormerExamination is in progress
Status updated on  11.06.2021
FormerGrant of patent is intended
Status updated on  11.04.2021
FormerExamination is in progress
Status updated on  06.11.2020
FormerRequest for examination was made
Status updated on  01.03.2019
FormerThe application has been published
Status updated on  27.07.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Biosense Webster (Israel) Ltd.
4 Hatnufa Street
Yokneam 2066717 / IL
[2018/35]
Inventor(s)01 / COHEN, Benjamin
c/o Biosense Webster (Israel) Ltd.
P.O. Box 275
4 Hatnufa Street
2066717 Yokneam / IL
02 / NOVOGRODSKY, Ben Ami
c/o Biosense Webster (Israel) Ltd.
P.O. Box 275
4 Hatnufa Street
2066717 Yokneam / IL
03 / KATZ, Natan Sharon
c/o Biosense Webster (Israel) Ltd.
P.O. Box 275
4 Hatnufa Street
2066717 Yokneam / IL
04 / ZAR, Lior
c/o Biosense Webster (Israel) Ltd.
P.O. Box 275
4 Hatnufa Street
2066717 Yokneam / IL
05 / TURGEMAN, Aharon
c/o Biosense Webster (Israel) Ltd.
P.O. Box 275
4 Hatnufa Street
2066717 Yokneam / IL
 [2018/35]
Representative(s)Carpmaels & Ransford LLP
One Southampton Row
London WC1B 5HA / GB
[2018/35]
Application number, filing date18158512.626.02.2018
[2018/35]
Priority number, dateUS20171544289527.02.2017         Original published format: US201715442895
[2018/35]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3366207
Date:29.08.2018
Language:EN
[2018/35]
Type: B1 Patent specification 
No.:EP3366207
Date:06.10.2021
Language:EN
[2021/40]
Search report(s)(Supplementary) European search report - dispatched on:EP20.06.2018
ClassificationIPC:A61B5/00, A61B5/06
[2021/15]
CPC:
A61B5/6852 (EP,IL,US); A61B5/287 (EP,CN,US); A61B5/339 (US);
A61B18/1492 (IL,US); A61B5/062 (IL,US); A61B5/063 (EP,IL,US);
A61B5/068 (IL,US); A61B5/283 (CN,US); A61B5/349 (EP,US);
A61B5/6855 (CN); A61B5/6869 (EP,CN,IL,US); A61B5/6885 (EP,IL,US);
A61B5/6886 (EP,IL,US); A61B5/743 (EP,IL,US); A61B2018/00351 (IL,US);
A61B2018/00577 (IL,US); A61B2505/05 (EP,IL,US) (-)
Former IPC [2018/35]A61B5/042, A61B5/0452, A61B5/00, A61B5/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/14]
Former [2018/35]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:HERVORHEBUNG EINES ELEKTRODENBILDES GEMÄSS EINEM ELEKTRODENSIGNAL[2018/35]
English:HIGHLIGHTING AN ELECTRODE IMAGE ACCORDING TO AN ELECTRODE SIGNAL[2018/35]
French:MISE EN ÉVIDENCE D'UNE IMAGE D'ÉLECTRODE SELON UN SIGNAL D'ÉLECTRODE[2018/35]
Examination procedure20.02.2019Amendment by applicant (claims and/or description)
20.02.2019Examination requested  [2019/14]
20.02.2019Date on which the examining division has become responsible
06.11.2020Despatch of a communication from the examining division (Time limit: M04)
21.01.2021Reply to a communication from the examining division
12.04.2021Communication of intention to grant the patent
10.06.2021Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
10.08.2021Communication of intention to grant the patent
26.08.2021Fee for grant paid
26.08.2021Fee for publishing/printing paid
26.08.2021Receipt of the translation of the claim(s)
Opposition(s)07.07.2022No opposition filed within time limit [2022/37]
Fees paidRenewal fee
13.02.2020Renewal fee patent year 03
12.02.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.02.2018
AL06.10.2021
AT06.10.2021
CY06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
MK06.10.2021
MT06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
TR06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
IE26.02.2022
LU26.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
[2024/42]
Former [2024/29]HU26.02.2018
AL06.10.2021
AT06.10.2021
CY06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
MK06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
TR06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
IE26.02.2022
LU26.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
Former [2024/23]HU26.02.2018
AL06.10.2021
AT06.10.2021
CY06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
MK06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
IE26.02.2022
LU26.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
Former [2024/20]HU26.02.2018
AL06.10.2021
AT06.10.2021
CY06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
IE26.02.2022
LU26.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
Former [2024/18]HU26.02.2018
AL06.10.2021
AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
IE26.02.2022
LU26.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
Former [2023/10]AL06.10.2021
AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
IE26.02.2022
LU26.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
Former [2023/09]AL06.10.2021
AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
IE26.02.2022
LU26.02.2022
CH28.02.2022
LI28.02.2022
Former [2023/01]AL06.10.2021
AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SI06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
LU26.02.2022
Former [2022/49]AL06.10.2021
AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
LU26.02.2022
Former [2022/47]AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
LU26.02.2022
Former [2022/44]AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
MC06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2022/35]AT06.10.2021
CZ06.10.2021
DK06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SK06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2022/34]AT06.10.2021
EE06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
PL06.10.2021
RO06.10.2021
RS06.10.2021
SE06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2022/33]AT06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
PL06.10.2021
RS06.10.2021
SE06.10.2021
SM06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2022/25]AT06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
PL06.10.2021
RS06.10.2021
SE06.10.2021
BG06.01.2022
NO06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2022/24]AT06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
PL06.10.2021
RS06.10.2021
SE06.10.2021
BG06.01.2022
GR07.01.2022
IS06.02.2022
PT07.02.2022
Former [2022/23]AT06.10.2021
ES06.10.2021
FI06.10.2021
HR06.10.2021
LT06.10.2021
LV06.10.2021
PL06.10.2021
RS06.10.2021
BG06.01.2022
PT07.02.2022
Former [2022/22]AT06.10.2021
FI06.10.2021
LT06.10.2021
RS06.10.2021
BG06.01.2022
Former [2022/21]AT06.10.2021
RS06.10.2021
BG06.01.2022
Former [2022/19]BG06.01.2022
Documents cited:Search[X]US2009177111  (MILLER STEPHAN P [US], et al) [X] 1,5,7-9 * paragraphs [0041] - [0043] - [0 49] , [0 52] , [0 54] , [0 57] , [0 69] , [0 74] , [0 84] , [0 92] * * figures 1, 6-8, 10 *;
 [X]EP2499968  (BIOSENSE WEBSTER ISRAEL LTD [IL]) [X] 1-4,6 * paragraph [0041] * * figures 1, 5, 6 *;
 [A]US2015119738  (DENO DON CURTIS [US]) [A] 1-9 * the whole document *;
 [A]EP3092944  (EP SOLUTIONS SA [CH]) [A] 1-9 * the whole document *;
 [A]EP3115011  (AFREEZE GMBH [AT]) [A] 1-9* the whole document *;
 [A]  - MOLOY DAS ET AL, "Ablation index, a novel marker of ablation lesion quality: prediction of pulmonary vein reconnection at repeat electrophysiology study and regional differences in target values", EUROPACE, GB, (20160531), doi:10.1093/europace/euw105, ISSN 1099-5129, page euw105, XP055484243 [A] 1-9 * the whole document *

DOI:   http://dx.doi.org/10.1093/europace/euw105
by applicantUS7266408
 US2009171321
 US2010168729
 US8456182
 US2016183824
 US2017014181
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.