EP3457082 - SENSOR DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.05.2022 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 12.06.2021 | ||
Former | Grant of patent is intended Status updated on 24.02.2021 | ||
Former | Examination is in progress Status updated on 03.06.2020 | ||
Former | Request for examination was made Status updated on 15.02.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states KABUSHIKI KAISHA TOSHIBA 1-1, Shibaura 1-chome Minato-ku Tokyo 105-8001 / JP | [2019/12] | Inventor(s) | 01 /
GANDO, Ryunosuke c/o IP Div. Toshiba Corp. (K. K. TOSHIBA) 1-1, Shibaura 1-chome Minato-ku Tokyo, 105-8001 / JP | 02 /
IKEHASHI, Tamio c/o IP Div. Toshiba Corp. (K. K. TOSHIBA) 1-1, Shibaura 1-chome Minato-ku Tokyo, 105-8001 / JP | 03 /
TOMIZAWA, Yasushi c/o IP Div. Toshiba Corp. (K. K. TOSHIBA) 1-1, Shibaura 1-chome Minato-ku Tokyo, 105-8001 / JP | 04 /
OGAWA, Etsuji c/o IP Div. Toshiba Corp. (K. K. TOSHIBA) 1-1, Shibaura 1-chome Minato-ku Tokyo, 105-8001 / JP | 05 /
MAEDA, Shunta c/o IP Div. Toshiba Corp. (K. K. TOSHIBA) 1-1, Shibaura 1-chome Minato-ku Tokyo, 105-8001 / JP | [2019/12] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2019/12] | Application number, filing date | 18158580.3 | 26.02.2018 | [2019/12] | Priority number, date | JP20170177060 | 14.09.2017 Original published format: JP 2017177060 | [2019/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3457082 | Date: | 20.03.2019 | Language: | EN | [2019/12] | Type: | B1 Patent specification | No.: | EP3457082 | Date: | 07.07.2021 | Language: | EN | [2021/27] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 10.08.2018 | Classification | IPC: | G01C19/5733, G01C19/5769, B81B3/00 | [2019/12] | CPC: |
G01C19/5733 (EP,US);
G01C19/5755 (US);
B81B3/0054 (EP,US);
G01C19/5769 (EP,US);
B81B2201/0242 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/12] | Title | German: | SENSORVORRICHTUNG | [2019/12] | English: | SENSOR DEVICE | [2019/12] | French: | DISPOSITIF DE CAPTEUR | [2019/12] | Examination procedure | 26.02.2018 | Examination requested [2019/12] | 25.03.2019 | Date on which the examining division has become responsible | 13.09.2019 | Amendment by applicant (claims and/or description) | 08.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 12.10.2020 | Reply to a communication from the examining division | 25.02.2021 | Communication of intention to grant the patent | 01.06.2021 | Fee for grant paid | 01.06.2021 | Fee for publishing/printing paid | 01.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 08.04.2022 | No opposition filed within time limit [2022/24] | Fees paid | Renewal fee | 13.02.2020 | Renewal fee patent year 03 | 12.02.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.02.2018 | AL | 07.07.2021 | AT | 07.07.2021 | CY | 07.07.2021 | CZ | 07.07.2021 | DK | 07.07.2021 | EE | 07.07.2021 | ES | 07.07.2021 | FI | 07.07.2021 | HR | 07.07.2021 | IT | 07.07.2021 | LT | 07.07.2021 | LV | 07.07.2021 | MC | 07.07.2021 | MK | 07.07.2021 | NL | 07.07.2021 | PL | 07.07.2021 | RO | 07.07.2021 | RS | 07.07.2021 | SE | 07.07.2021 | SI | 07.07.2021 | SK | 07.07.2021 | SM | 07.07.2021 | TR | 07.07.2021 | BG | 07.10.2021 | NO | 07.10.2021 | GR | 08.10.2021 | IS | 07.11.2021 | PT | 08.11.2021 | GB | 26.02.2022 | IE | 26.02.2022 | LU | 26.02.2022 | BE | 28.02.2022 | CH | 28.02.2022 | FR | 28.02.2022 | LI | 28.02.2022 | [2024/29] |
Former [2024/23] | HU | 26.02.2018 | |
AL | 07.07.2021 | ||
AT | 07.07.2021 | ||
CY | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
MK | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
GB | 26.02.2022 | ||
IE | 26.02.2022 | ||
LU | 26.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2024/20] | HU | 26.02.2018 | |
AL | 07.07.2021 | ||
AT | 07.07.2021 | ||
CY | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
GB | 26.02.2022 | ||
IE | 26.02.2022 | ||
LU | 26.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2024/18] | HU | 26.02.2018 | |
AL | 07.07.2021 | ||
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
GB | 26.02.2022 | ||
IE | 26.02.2022 | ||
LU | 26.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/10] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
GB | 26.02.2022 | ||
IE | 26.02.2022 | ||
LU | 26.02.2022 | ||
BE | 28.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/09] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
GB | 26.02.2022 | ||
IE | 26.02.2022 | ||
LU | 26.02.2022 | ||
CH | 28.02.2022 | ||
FR | 28.02.2022 | ||
LI | 28.02.2022 | ||
Former [2023/08] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
GB | 26.02.2022 | ||
IE | 26.02.2022 | ||
LU | 26.02.2022 | ||
FR | 28.02.2022 | ||
Former [2023/03] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
LU | 26.02.2022 | ||
FR | 28.02.2022 | ||
Former [2022/47] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
LU | 26.02.2022 | ||
Former [2022/44] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
MC | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/36] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
IT | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/29] | AL | 07.07.2021 | |
AT | 07.07.2021 | ||
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SI | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/25] | AT | 07.07.2021 | |
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SK | 07.07.2021 | ||
SM | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/24] | AT | 07.07.2021 | |
CZ | 07.07.2021 | ||
DK | 07.07.2021 | ||
EE | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RO | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
SK | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/21] | AT | 07.07.2021 | |
DK | 07.07.2021 | ||
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/11] | AT | 07.07.2021 | |
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
HR | 07.07.2021 | ||
LT | 07.07.2021 | ||
LV | 07.07.2021 | ||
NL | 07.07.2021 | ||
PL | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
GR | 08.10.2021 | ||
IS | 07.11.2021 | ||
PT | 08.11.2021 | ||
Former [2022/09] | AT | 07.07.2021 | |
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
LT | 07.07.2021 | ||
NL | 07.07.2021 | ||
RS | 07.07.2021 | ||
SE | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
PT | 08.11.2021 | ||
Former [2022/08] | AT | 07.07.2021 | |
ES | 07.07.2021 | ||
FI | 07.07.2021 | ||
LT | 07.07.2021 | ||
NL | 07.07.2021 | ||
SE | 07.07.2021 | ||
BG | 07.10.2021 | ||
NO | 07.10.2021 | ||
Former [2022/07] | AT | 07.07.2021 | |
LT | 07.07.2021 | ||
NL | 07.07.2021 | ||
NO | 07.10.2021 | Documents cited: | Search | [A]US2002134155 (ISHITOKO NOBUYUKI [JP], et al) [A] 1-4* paragraph [0030]; figure 1 *; | [Y]US2014260613 (QIU JIN [US], et al) [Y] 1-4 * figures 1a-1c,2a,2b,3 * * paragraphs [0002] , [0003] , [0004] , [0012] , [0016] - [0025] *; | [XY]US2016298966 (IKEHASHI TAMIO [JP]) [X] 1-4 * figures 1A,3,5A-5C,6A-6D * * paragraphs [0035] - [0042] - [0047] , [0048] , [0055] , [0056] , [0062] , [0066] * [Y] 1-4; | [A]US2016349056 (THOMPSON MATTHEW J [US], et al) [A] 1-4 * figures 3,5A,5B,6A,6B * * paragraphs [0021] , [0041] , [0042] , [0054] , [0060] - [0066] - [0070] - [0073] *; | [X] - GANDO RYUNOSUKE ET AL, "An intermittent free-vibration MEMS gyroscope enabled by catch-and-release mechanism for low-power and fast-startup applications", 2017 IEEE 30TH INTERNATIONAL CONFERENCE ON MICRO ELECTRO MECHANICAL SYSTEMS (MEMS), IEEE, (20170122), doi:10.1109/MEMSYS.2017.7863331, pages 29 - 32, XP033069495 [X] 1,2,4 * figures 2,3 * DOI: http://dx.doi.org/10.1109/MEMSYS.2017.7863331 |