EP3379716 - CURRENT MEASUREMENT METHOD IN A PWM CONTROLLED DRIVE OF A STEERING AID [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.02.2023 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 04.03.2022 | ||
Former | Grant of patent is intended Status updated on 01.11.2021 | ||
Former | Examination is in progress Status updated on 19.03.2021 | ||
Former | Request for examination was made Status updated on 29.03.2019 | ||
Former | The application has been published Status updated on 24.08.2018 | Most recent event Tooltip | 09.02.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 13.03.2024 [2024/11] | Applicant(s) | For all designated states VOLKSWAGEN AKTIENGESELLSCHAFT Berliner Ring 2 38440 Wolfsburg / DE | [2018/39] | Inventor(s) | 01 /
Gohlke, Daniel VW AG Am Köweken 23 38553 Wasbüttel / DE | 02 /
Gohlke, Julia VW AG Am Köweken 23 38553 Wasbüttel / DE | 03 /
Wartmann, Nadine Fasanenweg 12 38179 Schwülper / DE | [2018/39] | Application number, filing date | 18159067.0 | 28.02.2018 | [2018/39] | Priority number, date | DE201710203457 | 02.03.2017 Original published format: DE102017203457 | [2018/39] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3379716 | Date: | 26.09.2018 | Language: | DE | [2018/39] | Type: | B1 Patent specification | No.: | EP3379716 | Date: | 06.04.2022 | Language: | DE | [2022/14] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.08.2018 | Classification | IPC: | H02M7/5395, H02M1/00, // H02P27/08, G01R19/165, G01R19/25, B62D5/04 | [2018/39] | CPC: |
H02M7/5395 (EP);
G01R19/16547 (EP);
G01R19/16585 (EP);
G01R19/2509 (EP);
H02M1/0009 (EP);
H02P27/085 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/18] |
Former [2018/39] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | STROMMESSVERFAHREN IN EINEM MITTELS PWM ANGESTEUERTEN LENKHILFSANTRIEB | [2018/39] | English: | CURRENT MEASUREMENT METHOD IN A PWM CONTROLLED DRIVE OF A STEERING AID | [2018/39] | French: | PROCÉDÉ DE MESURE DE COURANT DANS UN ACTUATEUR ÉLECTRIQUE PILOTÉ PAR M.L.I. POUR UNE DIRECTION ASSISTÉE | [2018/39] | Examination procedure | 07.12.2018 | Amendment by applicant (claims and/or description) | 26.03.2019 | Examination requested [2019/18] | 26.03.2019 | Date on which the examining division has become responsible | 23.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 21.06.2021 | Reply to a communication from the examining division | 02.11.2021 | Communication of intention to grant the patent | 01.03.2022 | Fee for grant paid | 01.03.2022 | Fee for publishing/printing paid | 01.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 10.01.2023 | No opposition filed within time limit [2023/11] | Fees paid | Renewal fee | 02.03.2020 | Renewal fee patent year 03 | 01.03.2021 | Renewal fee patent year 04 | 28.02.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 06.04.2022 | CZ | 06.04.2022 | DK | 06.04.2022 | EE | 06.04.2022 | ES | 06.04.2022 | FI | 06.04.2022 | HR | 06.04.2022 | IT | 06.04.2022 | LT | 06.04.2022 | LV | 06.04.2022 | MC | 06.04.2022 | NL | 06.04.2022 | PL | 06.04.2022 | RO | 06.04.2022 | RS | 06.04.2022 | SE | 06.04.2022 | SI | 06.04.2022 | SK | 06.04.2022 | SM | 06.04.2022 | BG | 06.07.2022 | NO | 06.07.2022 | GR | 07.07.2022 | IS | 06.08.2022 | PT | 08.08.2022 | [2024/11] |
Former [2023/44] | AL | 06.04.2022 | |
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
MC | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/25] | AL | 06.04.2022 | |
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SI | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/17] | AL | 06.04.2022 | |
CZ | 06.04.2022 | ||
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/09] | CZ | 06.04.2022 | |
DK | 06.04.2022 | ||
EE | 06.04.2022 | ||
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RO | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
SK | 06.04.2022 | ||
SM | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2023/07] | DK | 06.04.2022 | |
ES | 06.04.2022 | ||
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2022/51] | ES | 06.04.2022 | |
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
IS | 06.08.2022 | ||
PT | 08.08.2022 | ||
Former [2022/50] | ES | 06.04.2022 | |
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
PL | 06.04.2022 | ||
RS | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/49] | ES | 06.04.2022 | |
FI | 06.04.2022 | ||
HR | 06.04.2022 | ||
LT | 06.04.2022 | ||
LV | 06.04.2022 | ||
NL | 06.04.2022 | ||
SE | 06.04.2022 | ||
BG | 06.07.2022 | ||
NO | 06.07.2022 | ||
GR | 07.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/47] | ES | 06.04.2022 | |
FI | 06.04.2022 | ||
LT | 06.04.2022 | ||
NL | 06.04.2022 | ||
SE | 06.04.2022 | ||
NO | 06.07.2022 | ||
PT | 08.08.2022 | ||
Former [2022/44] | NL | 06.04.2022 | Documents cited: | Search | [A]EP1526060 (KOYO SEIKO CO [JP]) [A] 1-11 * figures 4,5 *; | [A]EP1737117 (HITACHI LTD [JP]) [A] 1-11* figures 1,4 *; | [Y]EP2273668 (JTEKT CORP [JP]) [Y] 4,5 * figures 1-6 *; | [XYI]US2013026960 (FUJIMOTO CHIAKI [JP], et al) [X] 1,3,6,8,9 * figures 1,2,3,4,6,10,12,13,14 * * paragraphs [0042] - [0047] - [0137] - [0143] * [Y] 4,5 [I] 2,7,10,11 |