EP3381835 - LAUNDRY PRODUCT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 11.06.2021 Database last updated on 31.05.2024 | |
Former | The patent has been granted Status updated on 03.07.2020 | ||
Former | Grant of patent is intended Status updated on 05.04.2020 | ||
Former | Examination is in progress Status updated on 29.08.2018 | Most recent event Tooltip | 03.05.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 05.06.2024 [2024/23] | Applicant(s) | For all designated states Henkel AG & Co. KGaA Henkelstraße 67 40589 Düsseldorf / DE | [N/P] |
Former [2018/40] | For all designated states Henkel AG & Co. KGaA Henkelstrasse 67 40589 Düsseldorf / DE | Inventor(s) | 01 /
MEIER, Frank Henkel AG & Co. KGaA Am Steinebrück 17c 40589 Düsseldorf / DE | 02 /
GERHARDS, Katja Henkel AG & Co. KGaA Am Deich 22 40547 Düsseldorf / DE | 03 /
SUNDER, Matthias Henkel AG & Co. KGaA Koblenzer Straße 41 40593 Düsseldorf / DE | [2018/40] | Application number, filing date | 18159634.7 | 02.03.2018 | [2018/40] | Priority number, date | DE201710205549 | 31.03.2017 Original published format: DE102017205549 | [2018/40] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3381835 | Date: | 03.10.2018 | Language: | DE | [2018/40] | Type: | B1 Patent specification | No.: | EP3381835 | Date: | 05.08.2020 | Language: | DE | [2020/32] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 17.07.2018 | Classification | IPC: | B65D65/46, // B65D81/32, C11D17/04 | [2018/40] | CPC: |
B65D65/46 (EP,US);
C11D17/045 (KR,US);
B65D75/323 (CN);
B44F9/00 (KR);
B65D75/52 (CN);
C11D17/00 (CN);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/40] | Title | German: | WASCHMITTELPRODUKT | [2018/40] | English: | LAUNDRY PRODUCT | [2018/40] | French: | PRODUIT DÉTERGENT | [2018/40] | Examination procedure | 02.03.2018 | Examination requested [2018/40] | 02.03.2018 | Date on which the examining division has become responsible | 20.08.2018 | Despatch of a communication from the examining division (Time limit: M04) | 20.12.2018 | Reply to a communication from the examining division | 27.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 28.10.2019 | Reply to a communication from the examining division | 06.04.2020 | Communication of intention to grant the patent | 30.06.2020 | Fee for grant paid | 30.06.2020 | Fee for publishing/printing paid | 30.06.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 07.05.2021 | No opposition filed within time limit [2021/28] | Fees paid | Renewal fee | 24.03.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.03.2018 | AL | 05.08.2020 | CY | 05.08.2020 | CZ | 05.08.2020 | DK | 05.08.2020 | EE | 05.08.2020 | FI | 05.08.2020 | HR | 05.08.2020 | LT | 05.08.2020 | LV | 05.08.2020 | MC | 05.08.2020 | MK | 05.08.2020 | NL | 05.08.2020 | RO | 05.08.2020 | RS | 05.08.2020 | SE | 05.08.2020 | SI | 05.08.2020 | SK | 05.08.2020 | SM | 05.08.2020 | BG | 05.11.2020 | NO | 05.11.2020 | GR | 06.11.2020 | IS | 05.12.2020 | PT | 07.12.2020 | IE | 02.03.2021 | LU | 02.03.2021 | [2024/23] |
Former [2023/33] | HU | 02.03.2018 | |
AL | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 02.03.2021 | ||
LU | 02.03.2021 | ||
Former [2023/30] | AL | 05.08.2020 | |
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 02.03.2021 | ||
LU | 02.03.2021 | ||
Former [2022/09] | AL | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 02.03.2021 | ||
LU | 02.03.2021 | ||
Former [2022/07] | AL | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 02.03.2021 | ||
Former [2021/45] | AL | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/36] | AL | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/28] | AL | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/25] | AL | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/22] | CZ | 05.08.2020 | |
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
RO | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/21] | DK | 05.08.2020 | |
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/12] | FI | 05.08.2020 | |
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/10] | FI | 05.08.2020 | |
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
RS | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/09] | FI | 05.08.2020 | |
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/08] | FI | 05.08.2020 | |
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/07] | FI | 05.08.2020 | |
LT | 05.08.2020 | ||
NO | 05.11.2020 | Documents cited: | Search | [A]EP1375637 (UNILEVER NV [NL], et al) [A] 1-15 * paragraphs [0001] - [0079] ** figures 1a-2 *; | [XI]WO2004020288 (PACKAGING IMOLESE S P A [IT], et al) [X] 1-7,9,10 * pages 1-9 * * figures 1-11 * [I] 8,11-15; | [A]WO2014170882 (RIDEAU MACHINERY INC [US]) [A] 1-15 * pages 1-27 * * figures 1-35 *; | [XI]WO2015179584 (PROCTER & GAMBLE [US]) [X] 1-7,9,10 * pages 1-36 * * figures 1-13C * [I] 8,11-15 | Examination | - The Procter And Gamble Company, "WIPO Global Design Database", WIPO Global Design Database, (20150508), URL: https://www3.wipo.int/designdb/en/index.jsp, (20191009), XP055630552 | - Henkel Ag Co. Kgaa, "WIPO Global Design Database", WIPO Global Design Database, (20120124), URL: https://www3.wipo.int/designdb/en/index.jsp, (20191010), XP055630625 |