blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3375527

EP3375527 - SHOWER HEAD HAVING AN ACTUATOR AND AT LEAST ONE SEALING ELEMENT, EACH HAVING A SHORE HARDNESS D [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.07.2021
Database last updated on 26.06.2024
FormerThe patent has been granted
Status updated on  07.08.2020
FormerGrant of patent is intended
Status updated on  02.07.2020
FormerRequest for examination was made
Status updated on  22.03.2019
FormerThe application has been published
Status updated on  17.08.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
Grohe AG
Postfach 13 61
58653 Hemer / DE
[2021/21]
Former [2018/38]For all designated states
Grohe AG
58675 Hemer / DE
Inventor(s)01 / Schulte, Michael
Berger Weg 96
58708 Menden / DE
02 / Schröder, Claudia
An Pater und Nonne 21
58642 Iserlohn / DE
 [2018/38]
Application number, filing date18160888.609.03.2018
[2018/38]
Priority number, dateDE20171010522813.03.2017         Original published format: DE102017105228
DE20171011809209.08.2017         Original published format: DE102017118092
[2018/38]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3375527
Date:19.09.2018
Language:DE
[2018/38]
Type: B1 Patent specification 
No.:EP3375527
Date:09.09.2020
Language:DE
[2020/37]
Search report(s)(Supplementary) European search report - dispatched on:EP20.08.2018
ClassificationIPC:B05B1/16, B05B1/18
[2018/38]
CPC:
B05B1/18 (EP); B05B1/1609 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/17]
Former [2018/38]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:BRAUSEKOPF MIT EINEM STELLELEMENT UND MINDESTENS EINEM DICHTELEMENT, DIE JEWEILS EINE SHORE-HÄRTE D AUFWEISEN[2018/38]
English:SHOWER HEAD HAVING AN ACTUATOR AND AT LEAST ONE SEALING ELEMENT, EACH HAVING A SHORE HARDNESS D[2018/38]
French:POMME DE DOUCHE POURVUE D'UN ÉLÉMENT D'AJUSTEMENT ET D'AU MOINS UN ÉLÉMENT D'ÉTANCHÉITÉ, COMPORTANT RESPECTIVEMENT UNE DURETÉ SHORE D[2020/31]
Former [2018/38]POMME DE DOUCHE POURVUE D'UN ÉLÉMENT D'AJUSTEMENT ET D'AU MOINS UN ÉLÉMENT D'ÉTANCHÉITÉ, COMPORTANTRESPECTIVEMENT UNE DURETÉ SHORE D
Examination procedure15.03.2019Amendment by applicant (claims and/or description)
15.03.2019Examination requested  [2019/17]
15.03.2019Date on which the examining division has become responsible
03.07.2020Communication of intention to grant the patent
27.07.2020Fee for grant paid
27.07.2020Fee for publishing/printing paid
27.07.2020Receipt of the translation of the claim(s)
Opposition(s)10.06.2021No opposition filed within time limit [2021/33]
Fees paidRenewal fee
24.03.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.03.2018
AL09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
TR09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE09.03.2021
LU09.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
[2024/29]
Former [2024/23]HU09.03.2018
AL09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
MK09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE09.03.2021
LU09.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2023/33]HU09.03.2018
AL09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE09.03.2021
LU09.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2023/30]AL09.09.2020
CY09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE09.03.2021
LU09.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2023/29]AL09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
NL23.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE09.03.2021
LU09.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2022/34]AL09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE09.03.2021
LU09.03.2021
BE31.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2022/11]AL09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE09.03.2021
LU09.03.2021
CH31.03.2021
FR31.03.2021
LI31.03.2021
Former [2022/08]AL09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE09.03.2021
LU09.03.2021
FR31.03.2021
Former [2022/07]AL09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
IE09.03.2021
Former [2021/48]AL09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
IT09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/45]AL09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
MC09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/37]AL09.09.2020
CZ09.09.2020
DK09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/36]AL09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SI09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/28]AL09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SK09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/25]AL09.09.2020
CZ09.09.2020
EE09.09.2020
ES09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
IS09.01.2021
PT11.01.2021
Former [2021/22]CZ09.09.2020
EE09.09.2020
FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RO09.09.2020
RS09.09.2020
SE09.09.2020
SM09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/21]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
PT11.01.2021
Former [2021/10]FI09.09.2020
HR09.09.2020
LT09.09.2020
LV09.09.2020
PL09.09.2020
RS09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/09]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
GR10.12.2020
Former [2021/08]FI09.09.2020
LT09.09.2020
SE09.09.2020
BG09.12.2020
NO09.12.2020
Former [2021/07]FI09.09.2020
LT09.09.2020
NO09.12.2020
Documents cited:Search[I]DE202005008082U  (CHANG TSUNG CHIEH [TW]) [I] 1 * abstract * * page 2, paragraph 14 - page 4, paragraph 26 *;
 [XYI]EP1616628  (WEIDMANN PLASTICS TECH AG [CH]) [X] 1,2,6,10 * abstract * * column 2, paragraph 14 - column 5, paragraph 24 * [Y] 3 [I] 9,11;
 [Y]DE102011017434  (GROHE AG [DE]) [Y] 3 * abstract ** page 2, paragraph 8 - paragraph 16 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.