blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3375953

EP3375953 - SWING GIRDER AND SCAFFOLD SYSTEM WITH SUCH SWING GIRDER AND A METHOD OF ERECTING THE SCAFFOLD SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.08.2020
Database last updated on 24.07.2024
FormerThe patent has been granted
Status updated on  20.09.2019
FormerGrant of patent is intended
Status updated on  28.04.2019
FormerRequest for examination was made
Status updated on  22.03.2019
FormerThe application has been published
Status updated on  17.08.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Scafom Holding B.V.
De Kempen 5
6021 PZ Budel / NL
[N/P]
Former [2018/38]For all designated states
Scafom Holding B.V.
De Kempen 5
6021 PZ Budel / NL
Inventor(s)01 / Brinkmann, Franciscus Jozef Leonardus Hubertus
c/o De Kempen 5
6021 PZ Budel / NL
 [2018/38]
Representative(s)V.O.
P.O. Box 87930
Carnegieplein 5
2508 DH Den Haag / NL
[2018/38]
Application number, filing date18162036.015.03.2018
[2018/38]
Priority number, dateNL2017201851515.03.2017         Original published format: NL 2018515
[2018/38]
Filing languageNL
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3375953
Date:19.09.2018
Language:EN
[2018/38]
Type: B1 Patent specification 
No.:EP3375953
Date:23.10.2019
Language:EN
[2019/43]
Search report(s)(Supplementary) European search report - dispatched on:EP01.06.2018
ClassificationIPC:E04G1/14, E04G5/00, E04G5/04, E04G5/06, E04G5/16, E04G7/30, E04G7/34, E04G7/32, E04G1/15, E04G1/34
[2018/38]
CPC:
E04G5/007 (EP); E04G1/14 (EP); E04G1/15 (EP);
E04G1/34 (EP); E04G5/006 (EP); E04G5/045 (EP);
E04G5/165 (EP); E04G7/307 (EP); E04G7/32 (EP);
E04G7/34 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/17]
Former [2018/38]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SCHWENKBARER TRÄGER UND GERÜSTSYSTEM MIT EINEM SOLCHEN SCHWENKBAREN TRÄGER UND VERFAHREN ZUM ERRICHTEN EINES SOLCHEN GERÜSTSYSTEMS[2018/38]
English:SWING GIRDER AND SCAFFOLD SYSTEM WITH SUCH SWING GIRDER AND A METHOD OF ERECTING THE SCAFFOLD SYSTEM[2018/38]
French:POUTRE PIVOTANTE ET SYSTÈME D'ÉCHAFAUDAGE AVEC UNE TELLE POUTRE PIVOTANTE ET PROCÉDÉ DE MONTAGE DU SYSTÈME D'ÉCHAFAUDAGE[2018/38]
Examination procedure18.03.2019Amendment by applicant (claims and/or description)
18.03.2019Examination requested  [2019/17]
18.03.2019Date on which the examining division has become responsible
29.04.2019Communication of intention to grant the patent
09.09.2019Fee for grant paid
09.09.2019Fee for publishing/printing paid
09.09.2019Receipt of the translation of the claim(s)
Opposition(s)24.07.2020No opposition filed within time limit [2020/40]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.03.2018
AL23.10.2019
AT23.10.2019
CY23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
MK23.10.2019
MT23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
TR23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
IE15.03.2020
LU15.03.2020
BE31.03.2020
[2022/33]
Former [2022/27]HU15.03.2018
AL23.10.2019
AT23.10.2019
CY23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
MT23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
TR23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
IE15.03.2020
LU15.03.2020
BE31.03.2020
Former [2021/13]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
IE15.03.2020
LU15.03.2020
BE31.03.2020
Former [2021/08]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
IE15.03.2020
LU15.03.2020
Former [2021/04]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
LU15.03.2020
Former [2020/50]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/38]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/37]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/36]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/35]AL23.10.2019
CZ23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/34]AL23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/32]AL23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/25]FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/24]FI23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/23]FI23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
PT24.02.2020
Former [2020/22]FI23.10.2019
LT23.10.2019
NL23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
PT24.02.2020
Former [2020/21]NL23.10.2019
NO23.01.2020
Former [2020/20]NL23.10.2019
Documents cited:Search[A]US2005217936  (JOLICOEUR PAUL [US], et al) [A] 1-18* figures 6a, 6b *;
 [A]KR20100037242  (KIM YEONG SIM [KR]) [A] 1-18 * figure 3 *;
 [A]CA2740549  (ATHOS CONSTRUCTION PRODUCTS INC [CA]) [A] 1-18 * figure 3 *;
 [AD]WO2013066859  (SAFERITE PLATFORMS INC [US], et al) [AD] 1-18 * figure 3 * * page 8, line 2 - line 3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.