blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3355659

EP3355659 - SYSTEM AND METHOD FOR BUFFER MANAGEMENT FOR CELLULAR INTERFACES IN A NETWORK ENVIRONMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.01.2021
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  31.01.2020
FormerGrant of patent is intended
Status updated on  01.10.2019
FormerRequest for examination was made
Status updated on  29.06.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Cisco Technology, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706 / US
[2018/31]
Inventor(s)01 / GOPINATHAN, Sujay
17 Old Glory Ct.
Fremont, California 94539 / US
02 / PUTHENPARAMBIL, Jeslin Antony
3607 Lago de Bracciano
San Jose, California 95148 / US
03 / ANANDAN, Swapna
17 Old Glory Ct.
Fremont, California 94539 / US
04 / ROAY, Binod
328 Riesling Ct.
Fremont, California 94539 / US
05 / DATAR, Vivek
22205, Rae Lane
Cupertino, California 95014 / US
 [2018/31]
Representative(s)Hibbert, Juliet Jane Grace
Kilburn & Strode LLP
Lacon London
84 Theobalds Road
London WC1X 8NL / GB
[2018/31]
Application number, filing date18162623.508.05.2015
[2018/31]
Priority number, dateUS20151463974805.03.2015         Original published format: US201514639748
US20151464153609.03.2015         Original published format: US201514641536
US20151464159809.03.2015         Original published format: US201514641598
[2018/31]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3355659
Date:01.08.2018
Language:EN
[2018/31]
Type: B1 Patent specification 
No.:EP3355659
Date:04.03.2020
Language:EN
[2020/10]
Search report(s)(Supplementary) European search report - dispatched on:EP17.05.2018
ClassificationIPC:H04W88/06, H04L12/801, H04W28/08
[2018/31]
CPC:
H04L47/10 (EP); H04W28/0942 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/08]
Former [2018/31]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SYSTEM UND VERFAHREN ZUR PUFFERSPEICHERVERWALTUNG FÜR ZELLULARE SCHNITTSTELLEN IN EINER NETZWERKUMGEBUNG[2018/31]
English:SYSTEM AND METHOD FOR BUFFER MANAGEMENT FOR CELLULAR INTERFACES IN A NETWORK ENVIRONMENT[2018/31]
French:SYSTÈME ET PROCÉDÉ DE GESTION DE TAMPON POUR DES INTERFACES CELLULAIRES DANS UN ENVIRONNEMENT DE RÉSEAU[2018/31]
Examination procedure19.03.2018Examination requested  [2018/31]
19.03.2018Date on which the examining division has become responsible
10.01.2019Amendment by applicant (claims and/or description)
02.10.2019Communication of intention to grant the patent
23.01.2020Fee for grant paid
23.01.2020Fee for publishing/printing paid
23.01.2020Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP15167014.8  / EP3065501
Opposition(s)07.12.2020No opposition filed within time limit [2021/06]
Fees paidRenewal fee
19.03.2018Renewal fee patent year 03
19.03.2018Renewal fee patent year 04
28.05.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU08.05.2015
AL04.03.2020
AT04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MK04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
IE08.05.2020
LU08.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
[2022/31]
Former [2022/30]HU08.05.2015
AL04.03.2020
AT04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
IE08.05.2020
LU08.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2022/27]HU08.05.2015
AT04.03.2020
CY04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
MT04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
TR04.03.2020
IE08.05.2020
LU08.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/24]AT04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
IE08.05.2020
LU08.05.2020
BE31.05.2020
CH31.05.2020
LI31.05.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/20]AT04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
IE08.05.2020
LU08.05.2020
CH31.05.2020
LI31.05.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/15]AT04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
LU08.05.2020
CH31.05.2020
LI31.05.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/10]AT04.03.2020
CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
IT04.03.2020
LT04.03.2020
LV04.03.2020
MC04.03.2020
NL04.03.2020
PL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SI04.03.2020
SK04.03.2020
SM04.03.2020
CH31.05.2020
LI31.05.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2021/08]CZ04.03.2020
DK04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
CH31.05.2020
LI31.05.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/50]CZ04.03.2020
EE04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/49]CZ04.03.2020
ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SK04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/48]ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RO04.03.2020
RS04.03.2020
SE04.03.2020
SM04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
PT29.07.2020
Former [2020/47]ES04.03.2020
FI04.03.2020
HR04.03.2020
LT04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/46]FI04.03.2020
HR04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
IS04.07.2020
Former [2020/45]FI04.03.2020
HR04.03.2020
LV04.03.2020
NL04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
Former [2020/39]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
BG04.06.2020
NO04.06.2020
GR05.06.2020
Former [2020/38]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
NO04.06.2020
GR05.06.2020
Former [2020/37]FI04.03.2020
HR04.03.2020
LV04.03.2020
RS04.03.2020
SE04.03.2020
NO04.06.2020
Former [2020/35]FI04.03.2020
NO04.06.2020
Documents cited:Search[Y]GB2396087  (QUALCOMM [GB], et al) [Y] 3,4* the whole document *;
 [XY]US2014198643  (CONWAY ADRIAN E [US], et al) [X] 1,2,5-9 * paragraphs [0021] - [0097] * [Y] 3,4;
 [XY]US2014208138  (HOMCHAUDHURI SANDIP [US], et al) [X] 1,2,7,8 * paragraphs [0073] , [0080] * [Y] 3,4
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.