blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3542959

EP3542959 - DRESSING DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.07.2022
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  13.08.2021
FormerGrant of patent is intended
Status updated on  11.04.2021
FormerRequest for examination was made
Status updated on  08.11.2019
FormerThe application has been published
Status updated on  23.08.2019
Most recent event   Tooltip27.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 30.10.2024 [2024/44]
Applicant(s)For all designated states
Vincent S.r.l.
Via dell'Elettronica 6
36016 Thiene / IT
[2021/37]
Former [2021/26]For all designated states
Vincent S.r.l.
Via dell'Elettronica 6
36016 Thiene / IT
Former [2019/39]For all designated states
Tyrolit - Schleifmittelwerke Swarovski K.G.
Swarovskistrasse 33
6130 Schwaz / AT
Inventor(s)01 / DI NARDO, Franco
Via Morotel 17
31030 Borso Del Grappa / IT
 [2019/39]
Representative(s)Fabris, Stefano
Cantaluppi & Partners S.r.l.
Piazzetta Cappellato Pedrocchi, 18
35122 Padova / IT
[2021/37]
Former [2019/39]Torggler & Hofinger Patentanwälte
Postfach 85
6010 Innsbruck / AT
Application number, filing date18162816.520.03.2018
[2019/39]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3542959
Date:25.09.2019
Language:DE
[2019/39]
Type: B1 Patent specification 
No.:EP3542959
Date:15.09.2021
Language:DE
[2021/37]
Search report(s)(Supplementary) European search report - dispatched on:EP09.10.2018
ClassificationIPC:B24B53/06, B24B53/12, B24B9/10
[2019/39]
CPC:
B24B53/12 (EP,US); B24B53/06 (EP,US); B24B9/107 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/50]
Former [2019/39]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:ABRICHTVORRICHTUNG[2019/39]
English:DRESSING DEVICE[2019/39]
French:DISPOSITIF DE DRESSAGE[2019/39]
Examination procedure06.11.2019Amendment by applicant (claims and/or description)
06.11.2019Examination requested  [2019/50]
06.11.2019Date on which the examining division has become responsible
12.04.2021Communication of intention to grant the patent
09.08.2021Fee for grant paid
09.08.2021Fee for publishing/printing paid
09.08.2021Receipt of the translation of the claim(s)
Opposition(s)16.06.2022No opposition filed within time limit [2022/34]
Fees paidRenewal fee
20.03.2020Renewal fee patent year 03
24.03.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.03.2018
AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
MT15.09.2021
NL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
GB20.03.2022
IE20.03.2022
LU20.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
[2024/44]
Former [2024/24]HU20.03.2018
AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
GB20.03.2022
IE20.03.2022
LU20.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2024/23]AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
MK15.09.2021
NL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
GB20.03.2022
IE20.03.2022
LU20.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2024/20]AL15.09.2021
CY15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
GB20.03.2022
IE20.03.2022
LU20.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2023/10]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
GB20.03.2022
IE20.03.2022
LU20.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2023/09]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
GB20.03.2022
IE20.03.2022
LU20.03.2022
CH31.03.2022
LI31.03.2022
Former [2023/08]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
GB20.03.2022
IE20.03.2022
LU20.03.2022
Former [2022/47]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
MC15.09.2021
NL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/36]AL15.09.2021
CZ15.09.2021
DK15.09.2021
EE15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SI15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/29]AL15.09.2021
CZ15.09.2021
EE15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/25]CZ15.09.2021
EE15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
SM15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/24]CZ15.09.2021
EE15.09.2021
FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
NL15.09.2021
RO15.09.2021
RS15.09.2021
SE15.09.2021
SK15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
IS15.01.2022
PT17.01.2022
Former [2022/10]FI15.09.2021
HR15.09.2021
LT15.09.2021
LV15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
GR16.12.2021
Former [2022/09]FI15.09.2021
LT15.09.2021
RS15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/08]FI15.09.2021
LT15.09.2021
SE15.09.2021
BG15.12.2021
NO15.12.2021
Former [2022/07]LT15.09.2021
NO15.12.2021
Documents cited:Search[X]US1737551  (AIKIN FRANK W) [X] 1,3,7 * the whole document *;
 [X]US2515091  (MAY HUBERT H) [X] 1,4,7,8,10-12,14 * the whole document *;
 [A]US4182082  (MEYER HANS-ROBERT [DE]) [A] 1-14* the whole document *;
 [X]GB2029291  (GEN ELECTRIC) [X] 1,2,7,8,10-12,14 * the whole document *;
 [XI]US2005245176  (THYSSEN WOLFGANG [DE]) [X] 1,3,7,8,10-12,14 * the whole document * [I] 5,6,9,13
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.