blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3392631

EP3392631 - RAMAN SPECTROSCOPIC SYSTEM [Right-click to bookmark this link]
Former [2018/43]RADIATION SHIELD FOR NEAR-INFRARED DETECTORS
[2022/23]
StatusNo opposition filed within time limit
Status updated on  30.06.2023
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  22.07.2022
FormerGrant of patent is intended
Status updated on  30.05.2022
FormerRequest for examination was made
Status updated on  19.04.2019
FormerThe application has been published
Status updated on  21.09.2018
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
Endress+Hauser Optical Analysis, Inc.
371 Parkland Plaza
Ann Arbor, MI 48103 / US
[2022/38]
Former [2018/43]For all designated states
Kaiser Optical Systems Inc.
371 Parkland Plaza
Ann Arbor, MI 48103 / US
Inventor(s)01 / Slater, Joseph B.
4711 Meadow Lark In
Dexter, MI Michigan 48130 / US
02 / Tedesco, James M.
33047 Myma Ct.
Livonia, MI Michigan 48154 / US
03 / Feitisch, Alfred
111 Sierra Morena Court
Los Gatos, CA California 95032 / US
 [2018/43]
Representative(s)Kratt-Stubenrauch, Kai Michael
Endress+Hauser Group Services
(Deutschland) AG+Co. KG
Colmarer Straße 6
79576 Weil am Rhein / DE
[N/P]
Former [2022/34]Andres, Angelika Maria
Endress+Hauser Group Services
(Deutschland) AG+Co. KG
Colmarer Straße 6
79576 Weil am Rhein / DE
Former [2018/43]Andres, Angelika Maria
Endress+Hauser (Deutschland) AG+Co. KG
PatServe
Colmarer Strasse 6
79576 Weil am Rhein / DE
Application number, filing date18165824.605.04.2018
[2018/43]
Priority number, dateUS20171547968105.04.2017         Original published format: US201715479681
[2018/43]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3392631
Date:24.10.2018
Language:EN
[2018/43]
Type: B1 Patent specification 
No.:EP3392631
Date:24.08.2022
Language:EN
[2022/34]
Type: B8 Corrected title page of specification 
No.:EP3392631
Date:28.09.2022
[2022/39]
Search report(s)(Supplementary) European search report - dispatched on:EP21.09.2018
ClassificationIPC:G01J5/061, G01J5/04, G01J3/44, G01J5/06
[2022/17]
CPC:
G01J5/061 (EP,US); G01J3/0202 (CN); G01J3/44 (EP,US);
G01J3/4406 (US); G01J5/046 (EP,US); G01N21/65 (US);
G01J2005/065 (EP,US) (-)
Former IPC [2018/43]G01J5/04, G01J3/44, G01J5/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/21]
Former [2018/43]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:RAMAN-SPEKTROSKOPISCHES SYSTEM[2022/23]
English:RAMAN SPECTROSCOPIC SYSTEM[2022/23]
French:SYSTÈME SPECTROSCOPIQUE RAMAN[2022/23]
Former [2018/43]STRAHLUNGSSCHUTZ FÜR NAH-INFRAROT-DETEKTOREN
Former [2018/43]RADIATION SHIELD FOR NEAR-INFRARED DETECTORS
Former [2018/43]ÉCRAN DE PROTECTION CONTRE LES RAYONNEMENTS POUR DÉTECTEURS À INFRAROUGE PROCHE
Examination procedure16.04.2019Amendment by applicant (claims and/or description)
16.04.2019Examination requested  [2019/21]
16.04.2019Date on which the examining division has become responsible
31.05.2022Communication of intention to grant the patent
13.07.2022Fee for grant paid
13.07.2022Fee for publishing/printing paid
13.07.2022Receipt of the translation of the claim(s)
Opposition(s)25.05.2023No opposition filed within time limit [2023/31]
Fees paidRenewal fee
27.04.2020Renewal fee patent year 03
29.04.2021Renewal fee patent year 04
25.03.2022Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL24.08.2022
AT24.08.2022
CZ24.08.2022
DK24.08.2022
EE24.08.2022
ES24.08.2022
FI24.08.2022
HR24.08.2022
IT24.08.2022
LT24.08.2022
LV24.08.2022
MC24.08.2022
NL24.08.2022
PL24.08.2022
RO24.08.2022
RS24.08.2022
SE24.08.2022
SI24.08.2022
SK24.08.2022
SM24.08.2022
NO24.11.2022
GR25.11.2022
IS24.12.2022
PT26.12.2022
GB05.04.2023
IE05.04.2023
LU05.04.2023
BE30.04.2023
CH30.04.2023
FR30.04.2023
LI30.04.2023
[2024/26]
Former [2024/21]AL24.08.2022
AT24.08.2022
CZ24.08.2022
DK24.08.2022
EE24.08.2022
ES24.08.2022
FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
MC24.08.2022
NL24.08.2022
PL24.08.2022
RO24.08.2022
RS24.08.2022
SE24.08.2022
SI24.08.2022
SK24.08.2022
SM24.08.2022
NO24.11.2022
GR25.11.2022
IS24.12.2022
PT26.12.2022
GB05.04.2023
IE05.04.2023
LU05.04.2023
BE30.04.2023
CH30.04.2023
FR30.04.2023
LI30.04.2023
Former [2024/11]AL24.08.2022
AT24.08.2022
CZ24.08.2022
DK24.08.2022
EE24.08.2022
ES24.08.2022
FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
MC24.08.2022
NL24.08.2022
PL24.08.2022
RO24.08.2022
RS24.08.2022
SE24.08.2022
SI24.08.2022
SK24.08.2022
SM24.08.2022
NO24.11.2022
GR25.11.2022
IS24.12.2022
PT26.12.2022
GB05.04.2023
LU05.04.2023
BE30.04.2023
CH30.04.2023
FR30.04.2023
LI30.04.2023
Former [2024/09]AL24.08.2022
AT24.08.2022
CZ24.08.2022
DK24.08.2022
EE24.08.2022
ES24.08.2022
FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
MC24.08.2022
NL24.08.2022
PL24.08.2022
RO24.08.2022
RS24.08.2022
SE24.08.2022
SI24.08.2022
SK24.08.2022
SM24.08.2022
NO24.11.2022
GR25.11.2022
IS24.12.2022
PT26.12.2022
GB05.04.2023
LU05.04.2023
CH30.04.2023
LI30.04.2023
Former [2024/08]AL24.08.2022
AT24.08.2022
CZ24.08.2022
DK24.08.2022
EE24.08.2022
ES24.08.2022
FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
MC24.08.2022
NL24.08.2022
PL24.08.2022
RO24.08.2022
RS24.08.2022
SE24.08.2022
SI24.08.2022
SK24.08.2022
SM24.08.2022
NO24.11.2022
GR25.11.2022
IS24.12.2022
PT26.12.2022
GB05.04.2023
LU05.04.2023
Former [2024/04]AL24.08.2022
AT24.08.2022
CZ24.08.2022
DK24.08.2022
EE24.08.2022
ES24.08.2022
FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
NL24.08.2022
PL24.08.2022
RO24.08.2022
RS24.08.2022
SE24.08.2022
SI24.08.2022
SK24.08.2022
SM24.08.2022
NO24.11.2022
GR25.11.2022
IS24.12.2022
PT26.12.2022
LU05.04.2023
Former [2023/37]AL24.08.2022
AT24.08.2022
CZ24.08.2022
DK24.08.2022
EE24.08.2022
ES24.08.2022
FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
NL24.08.2022
PL24.08.2022
RO24.08.2022
RS24.08.2022
SE24.08.2022
SI24.08.2022
SK24.08.2022
SM24.08.2022
NO24.11.2022
GR25.11.2022
IS24.12.2022
PT26.12.2022
Former [2023/29]AL24.08.2022
AT24.08.2022
CZ24.08.2022
DK24.08.2022
EE24.08.2022
ES24.08.2022
FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
NL24.08.2022
PL24.08.2022
RO24.08.2022
RS24.08.2022
SE24.08.2022
SK24.08.2022
SM24.08.2022
NO24.11.2022
GR25.11.2022
IS24.12.2022
PT26.12.2022
Former [2023/23]AT24.08.2022
CZ24.08.2022
DK24.08.2022
EE24.08.2022
ES24.08.2022
FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
NL24.08.2022
PL24.08.2022
RO24.08.2022
RS24.08.2022
SE24.08.2022
SK24.08.2022
SM24.08.2022
NO24.11.2022
GR25.11.2022
IS24.12.2022
PT26.12.2022
Former [2023/22]AT24.08.2022
CZ24.08.2022
DK24.08.2022
ES24.08.2022
FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
NL24.08.2022
PL24.08.2022
RO24.08.2022
RS24.08.2022
SE24.08.2022
SM24.08.2022
NO24.11.2022
GR25.11.2022
IS24.12.2022
PT26.12.2022
Former [2023/21]DK24.08.2022
FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
NL24.08.2022
PL24.08.2022
RS24.08.2022
SE24.08.2022
SM24.08.2022
NO24.11.2022
GR25.11.2022
IS24.12.2022
PT26.12.2022
Former [2023/20]FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
NL24.08.2022
PL24.08.2022
RS24.08.2022
SE24.08.2022
SM24.08.2022
NO24.11.2022
GR25.11.2022
IS24.12.2022
PT26.12.2022
Former [2023/12]FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
NL24.08.2022
PL24.08.2022
RS24.08.2022
SE24.08.2022
NO24.11.2022
GR25.11.2022
IS24.12.2022
PT26.12.2022
Former [2023/11]FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
NL24.08.2022
PL24.08.2022
RS24.08.2022
SE24.08.2022
NO24.11.2022
GR25.11.2022
PT26.12.2022
Former [2023/10]FI24.08.2022
HR24.08.2022
LT24.08.2022
LV24.08.2022
NL24.08.2022
RS24.08.2022
SE24.08.2022
NO24.11.2022
GR25.11.2022
PT26.12.2022
Former [2023/09]FI24.08.2022
LT24.08.2022
LV24.08.2022
NL24.08.2022
RS24.08.2022
SE24.08.2022
NO24.11.2022
PT26.12.2022
Former [2023/08]FI24.08.2022
LT24.08.2022
NL24.08.2022
RS24.08.2022
SE24.08.2022
NO24.11.2022
Documents cited:Search[XI]US6133569  (SHODA MASHAHIRO [JP], et al) [X] 1,3,4,6,8-10 * column 10, lines 14-55; figures 1,5 * * column 6, line 55 - column 7, line 46; figures 1,5 * [I] 2,5,9,11-13;
 [XAI]US6144031  (HERRING ROBERT J [US], et al) [X] 1-3,11-13 * columns 7-8; figures 1,2 * * column 9, line 18 - column 10, line 54; figures 6,9 * [A] 7 [I] 4-6,8-10;
 [A]WO2005062010  (RAYTHEON CO [US]) [A] 4* page 5 - page 7; figures 1,2 *;
 [XI]US2009321645  (HINNRICHS MICHELE [US]) [X] 1-3,11-13 * paragraphs [0006] , [0009] , [0010] , [0020] - [0026]; figure 1 * [I] 4-10
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.