blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3466374

EP3466374 - FUSED FEMORAL STEM SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  10.09.2021
Database last updated on 27.07.2024
FormerThe patent has been granted
Status updated on  02.10.2020
FormerGrant of patent is intended
Status updated on  17.12.2019
FormerExamination is in progress
Status updated on  04.01.2019
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Beijing AK Medical Co., Ltd.
2nd Floor Xingye Building
No. 10, Baifuquan Road
Changping Science Park
Beijing 102200 / CN
[2019/15]
Inventor(s)01 / ZHANG, Weiping
2nd Floor
Xing Ye Building, No. 10 Baiguquan Road
Changping Science Park
Beijing, 102200 / CN
 [2019/15]
Representative(s)Patentwerk B.V.
P.O. Box 1514
5200 BN 's-Hertogenbosch / NL
[2019/15]
Application number, filing date18167087.812.04.2018
[2019/15]
Priority number, dateCN20171092893009.10.2017         Original published format: CN201710928930
[2019/15]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3466374
Date:10.04.2019
Language:EN
[2019/15]
Type: B1 Patent specification 
No.:EP3466374
Date:04.11.2020
Language:EN
[2020/45]
Search report(s)(Supplementary) European search report - dispatched on:EP06.11.2018
ClassificationIPC:A61F2/30, A61F2/32, A61F2/36, A61B17/68
[2019/15]
CPC:
A61F2/3609 (EP,US); A61F2/30734 (EP,US); A61F2/3094 (EP,US);
A61F2/30965 (EP,US); A61F2/32 (EP,US); A61F2/3662 (EP,US);
A61F2/3672 (US); A61B17/74 (EP,US); A61B17/742 (US);
A61B17/8685 (EP,US); A61F2/30 (EP,US); A61F2/36 (EP,US);
A61F2002/30011 (EP,US); A61F2002/30113 (EP,US); A61F2002/30125 (EP,US);
A61F2002/30138 (EP,US); A61F2002/30153 (EP,US); A61F2002/30159 (EP,US);
A61F2002/30726 (EP,US); A61F2002/30738 (EP,US); A61F2002/3085 (EP,US);
A61F2002/30948 (EP,US); A61F2002/30957 (EP,US); A61F2002/30968 (EP,US);
A61F2002/30985 (EP,US); A61F2002/3654 (EP,US); A61F2310/00011 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/23]
Former [2019/15]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERSCHMOLZENES FEMURSCHAFT-SYSTEM[2019/15]
English:FUSED FEMORAL STEM SYSTEM[2019/15]
French:SYSTÈME DE TIGE FEMORALE FUSIONNÉE[2019/15]
Examination procedure12.04.2018Examination requested  [2019/15]
06.11.2018Date on which the examining division has become responsible
03.01.2019Despatch of a communication from the examining division (Time limit: M04)
25.04.2019Reply to a communication from the examining division
28.05.2019Despatch of a communication from the examining division (Time limit: M04)
27.09.2019Reply to a communication from the examining division
18.12.2019Communication of intention to grant the patent
31.03.2020Receipt of the translation of the claim(s)
18.06.2020Fee for grant paid
18.06.2020Fee for publishing/printing paid
21.08.2020Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time
Opposition(s)05.08.2021No opposition filed within time limit [2021/41]
Request for further processing for:The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent
31.08.2020Request for further processing filed
31.08.2020Full payment received (date of receipt of payment)
Request granted
04.09.2020Decision despatched
Fees paidRenewal fee
27.04.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.04.2018
AL04.11.2020
AT04.11.2020
CY04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
MK04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
TR04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
IE12.04.2021
LU12.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
[2024/29]
Former [2024/23]HU12.04.2018
AL04.11.2020
AT04.11.2020
CY04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
MK04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
IE12.04.2021
LU12.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
Former [2023/33]HU12.04.2018
AL04.11.2020
AT04.11.2020
CY04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
IE12.04.2021
LU12.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
Former [2023/30]AL04.11.2020
AT04.11.2020
CY04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
IE12.04.2021
LU12.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/34]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
IE12.04.2021
LU12.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/23]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
IE12.04.2021
LU12.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/21]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
PT04.03.2021
IE12.04.2021
LU12.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/10]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
PT04.03.2021
LU12.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/04]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
LU12.04.2021
Former [2021/50]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/48]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/46]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/45]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/37]AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/36]AT04.11.2020
CZ04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/35]AT04.11.2020
CZ04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SK04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/33]AT04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
PL04.11.2020
RS04.11.2020
SE04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/32]AT04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LV04.11.2020
PL04.11.2020
RS04.11.2020
SE04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/28]AT04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LV04.11.2020
PL04.11.2020
RS04.11.2020
SE04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/25]AT04.11.2020
ES04.11.2020
FI04.11.2020
LV04.11.2020
PL04.11.2020
RS04.11.2020
SE04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/23]AT04.11.2020
FI04.11.2020
LV04.11.2020
RS04.11.2020
SE04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
PT04.03.2021
Former [2021/22]FI04.11.2020
RS04.11.2020
NO04.02.2021
PT04.03.2021
Former [2021/21]FI04.11.2020
PT04.03.2021
Former [2021/20]FI04.11.2020
Documents cited:Search[A]DE2854334  (ERLER FRITZ DR) [A] 1-10 * the whole document *;
 [A]US4488319  (VON RECUM ANDREAS F [US]) [A] 1-10 * the whole document *;
 [X]EP0308081  (HINCKFUSS BRUCE WILLIAM [AU], et al) [X] 1-10 * column 1, line 32 - column 17, line 17 *;
 [A]US5571203  (MASINI MICHAEL A [US]) [A] 1-10* figure 4 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.