EP3552547 - METHOD FOR PROVIDING CONVERSION INFORMATION ABOUT AN IMAGING DATA SET, X-RAY DEVICE, COMPUTER PROGRAM AND ELECTRONICALLY READABLE DATA CARRIER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.10.2023 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 04.11.2022 | ||
Former | Grant of patent is intended Status updated on 09.08.2022 | ||
Former | Request for examination was made Status updated on 20.07.2022 | ||
Former | Grant of patent is intended Status updated on 29.06.2022 | ||
Former | Request for examination was made Status updated on 17.04.2020 | ||
Former | The application has been published Status updated on 13.09.2019 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Siemens Healthcare GmbH Henkestraße 127 91052 Erlangen / DE | [2019/42] | Inventor(s) | 01 /
Ritter, André Hirtenweg 5a 91054 Buckenhof / DE | 02 /
Hofmann, Christian Michael-Vogel-Straße 33 91052 Erlangen / DE | [2019/42] | Application number, filing date | 18167300.5 | 13.04.2018 | [2019/42] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3552547 | Date: | 16.10.2019 | Language: | DE | [2019/42] | Type: | B1 Patent specification | No.: | EP3552547 | Date: | 07.12.2022 | Language: | DE | [2022/49] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 15.10.2018 | Classification | IPC: | A61B6/00 | [2019/42] | CPC: |
A61B6/583 (EP,US);
G01T7/005 (US);
A61B6/032 (EP,CN);
A61B6/482 (EP);
A61B6/50 (EP);
A61B6/582 (CN);
A61N5/103 (EP,CN);
A61N5/1049 (CN);
A61N5/1075 (CN);
A61N2005/1061 (CN)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/21] |
Former [2019/42] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR BEREITSTELLUNG EINER KONVERTIERUNGSINFORMATION ZU EINEM BILDDATENSATZ, RÖNTGENEINRICHTUNG, COMPUTERPROGRAMM UND ELEKTRONISCH LESBARER DATENTRÄGER | [2019/42] | English: | METHOD FOR PROVIDING CONVERSION INFORMATION ABOUT AN IMAGING DATA SET, X-RAY DEVICE, COMPUTER PROGRAM AND ELECTRONICALLY READABLE DATA CARRIER | [2019/42] | French: | PROCÉDÉ DE FOURNITURE D'INFORMATIONS DE CONVERSION À UN ENSEMBLE DE DONNÉES D'IMAGE, DISPOSITIF À RAYONS X, PROGRAMME INFORMATIQUE ET SUPPORT DE DONNÉES LISIBLE ÉLECTRONIQUEMENT | [2019/42] | Examination procedure | 07.04.2020 | Amendment by applicant (claims and/or description) | 14.04.2020 | Examination requested [2020/21] | 14.04.2020 | Date on which the examining division has become responsible | 30.06.2022 | Communication of intention to grant the patent | 20.07.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 10.08.2022 | Communication of intention to grant the patent | 26.10.2022 | Receipt of the translation of the claim(s) | 27.10.2022 | Fee for grant paid | 27.10.2022 | Fee for publishing/printing paid | Opposition(s) | 08.09.2023 | No opposition filed within time limit [2023/46] | Fees paid | Renewal fee | 20.04.2020 | Renewal fee patent year 03 | 19.04.2021 | Renewal fee patent year 04 | 19.04.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 07.12.2022 | CZ | 07.12.2022 | DK | 07.12.2022 | EE | 07.12.2022 | ES | 07.12.2022 | FI | 07.12.2022 | HR | 07.12.2022 | IT | 07.12.2022 | LT | 07.12.2022 | LV | 07.12.2022 | MC | 07.12.2022 | PL | 07.12.2022 | RO | 07.12.2022 | RS | 07.12.2022 | SE | 07.12.2022 | SI | 07.12.2022 | SK | 07.12.2022 | SM | 07.12.2022 | NO | 07.03.2023 | GR | 08.03.2023 | IS | 07.04.2023 | PT | 10.04.2023 | IE | 13.04.2023 | LU | 13.04.2023 | BE | 30.04.2023 | CH | 30.04.2023 | LI | 30.04.2023 | [2024/26] |
Former [2024/21] | AL | 07.12.2022 | |
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
MC | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SI | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
IE | 13.04.2023 | ||
LU | 13.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
Former [2024/12] | AL | 07.12.2022 | |
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
MC | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SI | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
LU | 13.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
Former [2024/09] | AL | 07.12.2022 | |
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
MC | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SI | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
LU | 13.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
Former [2024/08] | AL | 07.12.2022 | |
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
MC | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SI | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
LU | 13.04.2023 | ||
Former [2024/04] | AL | 07.12.2022 | |
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SI | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
LU | 13.04.2023 | ||
Former [2023/51] | AL | 07.12.2022 | |
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SI | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
Former [2023/46] | AL | 07.12.2022 | |
CZ | 07.12.2022 | ||
DK | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
Former [2023/39] | AL | 07.12.2022 | |
CZ | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
IS | 07.04.2023 | ||
PT | 10.04.2023 | ||
Former [2023/38] | AL | 07.12.2022 | |
CZ | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SK | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
PT | 10.04.2023 | ||
Former [2023/37] | AL | 07.12.2022 | |
CZ | 07.12.2022 | ||
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
PT | 10.04.2023 | ||
Former [2023/35] | CZ | 07.12.2022 | |
EE | 07.12.2022 | ||
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
PL | 07.12.2022 | ||
RO | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
PT | 10.04.2023 | ||
Former [2023/34] | EE | 07.12.2022 | |
ES | 07.12.2022 | ||
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
PL | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
PT | 10.04.2023 | ||
Former [2023/33] | ES | 07.12.2022 | |
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
PL | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
SM | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
Former [2023/25] | ES | 07.12.2022 | |
FI | 07.12.2022 | ||
HR | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
PL | 07.12.2022 | ||
RS | 07.12.2022 | ||
SE | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
Former [2023/23] | ES | 07.12.2022 | |
FI | 07.12.2022 | ||
LT | 07.12.2022 | ||
LV | 07.12.2022 | ||
SE | 07.12.2022 | ||
NO | 07.03.2023 | ||
GR | 08.03.2023 | ||
Former [2023/22] | ES | 07.12.2022 | |
FI | 07.12.2022 | ||
LT | 07.12.2022 | ||
SE | 07.12.2022 | ||
NO | 07.03.2023 | ||
Former [2023/20] | LT | 07.12.2022 | |
NO | 07.03.2023 | Documents cited: | Search | [X]WO0238045 (UNIV JOHNS HOPKINS [US], et al) [X] 1-17 * paragraph [0046] - paragraph [0161] *; | [IA]WO2008046498 (VAMP VERFAHREN UND APP DER MED [DE], et al) [I] 1,7,15-17 * page 10, line 33 - page 20, line 8 * [A] 2-6,8-14; | [A]US2014236488 (BROWN J KEENAN [US]) [A] 1-17* paragraph [0035] - paragraph [0108] *; | [AD] - MATTHIAS WITT ET AL, "Optimization of the stopping-power-ratio to Hounsfield-value calibration curve in proton and heavy ion therapy", ZEITSCHRIFT FUER MEDIZINISCHE PHYSIK, DE, (20150901), vol. 25, no. 3, doi:10.1016/j.zemedi.2014.11.001, ISSN 0939-3889, pages 251 - 263, XP055512448 [AD] 1-17 * the whole document * DOI: http://dx.doi.org/10.1016/j.zemedi.2014.11.001 | by applicant | - M. WITT et al., "Optimization of the stopping-power-ratio to Hounsfield-value calibration curve in proton and heavy ion therapy", Z. Med. Phys., (20150000), vol. 25, no. 3, pages 251 - 263 | - U. SCHNEIDER et al., "The calibration of CT Hounsfield units for radiotherapy treatment planning", Phys. Med. Biol., (19960000), vol. 41, doi:doi:10.1088/0031-9155/41/1/009, pages 111 - 124, XP001025982 DOI: http://dx.doi.org/10.1088/0031-9155/41/1/009 |