blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3395612

EP3395612 - SYSTEM FOR SECURING A LOAD AND CORRESPONDING FLOOR SUPPORT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.04.2022
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  14.05.2021
FormerGrant of patent is intended
Status updated on  18.01.2021
FormerExamination is in progress
Status updated on  29.06.2020
FormerRequest for examination was made
Status updated on  19.04.2019
FormerThe application has been published
Status updated on  28.09.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024  [2024/42]
Applicant(s)For all designated states
Ur'ben
ZA Le Relais de Merlin - RN 88
12800 Naucelle / FR
[2018/44]
Inventor(s)01 / GOMES, Pascal
11 rue Albert Marquet
81000 ALBI / FR
 [2018/44]
Representative(s)Plasseraud IP
104 Rue de Richelieu
CS92104
75080 Paris Cedex 02 / FR
[N/P]
Former [2021/24]Plasseraud IP
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
Former [2018/44]Cabinet Plasseraud
66, rue de la Chaussée d'Antin
75440 Paris Cedex 09 / FR
Application number, filing date18168847.423.04.2018
[2018/44]
Priority number, dateFR2017005352524.04.2017         Original published format: FR 1753525
[2018/44]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3395612
Date:31.10.2018
Language:FR
[2018/44]
Type: B1 Patent specification 
No.:EP3395612
Date:16.06.2021
Language:FR
[2021/24]
Search report(s)(Supplementary) European search report - dispatched on:EP13.07.2018
ClassificationIPC:B60P7/08
[2018/44]
CPC:
B60P7/0807 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/21]
Former [2018/44]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:FESTZURRSYSTEM EINER LADUNG, UND ENTSPRECHENDE BODENHALTERUNG[2018/44]
English:SYSTEM FOR SECURING A LOAD AND CORRESPONDING FLOOR SUPPORT[2018/44]
French:SYSTÈME D'ARRIMAGE D'UNE CHARGE ET SUPPORT DE PLANCHER CORRESPONDANT[2018/44]
Examination procedure11.04.2019Amendment by applicant (claims and/or description)
11.04.2019Examination requested  [2019/21]
11.04.2019Date on which the examining division has become responsible
02.07.2020Despatch of a communication from the examining division (Time limit: M04)
07.10.2020Reply to a communication from the examining division
19.01.2021Communication of intention to grant the patent
10.05.2021Fee for grant paid
10.05.2021Fee for publishing/printing paid
10.05.2021Receipt of the translation of the claim(s)
Opposition(s)17.03.2022No opposition filed within time limit [2022/21]
Fees paidRenewal fee
07.02.2020Renewal fee patent year 03
12.03.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.04.2018
AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
MK16.06.2021
MT16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
TR16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
[2024/42]
Former [2024/29]HU23.04.2018
AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
MK16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
TR16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2024/23]HU23.04.2018
AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
MK16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2024/20]HU23.04.2018
AL16.06.2021
AT16.06.2021
CY16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2024/18]HU23.04.2018
AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2023/06]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
MC16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/29]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SI16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/26]AL16.06.2021
AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/21]AT16.06.2021
CZ16.06.2021
DK16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/10]AT16.06.2021
CZ16.06.2021
EE16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
PL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
IS16.10.2021
PT18.10.2021
Former [2022/09]AT16.06.2021
CZ16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RO16.06.2021
RS16.06.2021
SE16.06.2021
SK16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
PT18.10.2021
Former [2022/08]AT16.06.2021
CZ16.06.2021
ES16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RS16.06.2021
SE16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2022/07]AT16.06.2021
FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
NL16.06.2021
RS16.06.2021
SE16.06.2021
SM16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/51]FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
RS16.06.2021
SE16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/49]FI16.06.2021
HR16.06.2021
LT16.06.2021
LV16.06.2021
SE16.06.2021
BG16.09.2021
NO16.09.2021
GR17.09.2021
Former [2021/47]FI16.06.2021
LT16.06.2021
BG16.09.2021
Former [2021/46]FI16.06.2021
LT16.06.2021
Documents cited:Search[XI]EP3059119  (THIELE GMBH & CO KG [DE]) [X] 1,2,5,6,8,9 * abstract * * paragraphs [0021] - [0030] * * figures 1-8 * [I] 3;
 [X]DE202006007916U  (KONINK NOOTEBOOM TRAILERS B V [NL]) [X] 1-3,5,6,8,9 * abstract * * paragraphs [0031] - [0035] - [0 38] - [0040] * * figures 1-10 *;
 [I]EP2781406  (HESTERBERG & SÖHNE GMBH & CO KG F [DE]) [I] 1,2,5-9,11-13 * abstract * * paragraphs [0016] - [0027] * * figures 1-8 *;
 [I]FR2782040  (POMMIER & CIE [FR]) [I] 1-3,7-9,11-13 * abstract * * page 3, lines 3-12 * * page 4, line 9 - page 5, line 34 * * figures 1, 2, 7-15 *
ExaminationDE10107598
by applicantUS2003053879
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.