EP3399103 - TONGUE DEVICE AND METHOD FOR MANUFACTURING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.09.2023 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 30.09.2022 | ||
Former | Grant of patent is intended Status updated on 31.05.2022 | ||
Former | Examination is in progress Status updated on 08.07.2019 | ||
Former | Request for examination was made Status updated on 10.05.2019 | ||
Former | The application has been published Status updated on 05.10.2018 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Süß, Joachim Tronitzer Strasse 22 01259 Dresden / DE | [2021/32] |
Former [2018/45] | For all designated states IFTEC GmbH & Co. KG Teslastraße 2 04347 Leipzig / DE | Inventor(s) | 01 /
Süß, Dr. Joachim Tronitzer Straße 22 01259 Dresden / DE | 02 /
Linsel, Ralf Iftec GmbH & Co. KG Karl-Liebknecht-Straße 23 04107 Leipzig / DE | [2018/45] | Representative(s) | Hecht, Jan-David Patentanwaltskanzlei Dr. Hecht Ranstädter Steinweg 28 04109 Leipzig / DE | [2018/45] | Application number, filing date | 18170699.5 | 03.05.2018 | [2018/45] | Priority number, date | DE201710109635 | 04.05.2017 Original published format: DE102017109635 | DE201710109636 | 04.05.2017 Original published format: DE102017109636 | [2018/45] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3399103 | Date: | 07.11.2018 | Language: | DE | [2018/45] | Type: | B1 Patent specification | No.: | EP3399103 | Date: | 02.11.2022 | Language: | DE | [2022/44] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.07.2018 | Classification | IPC: | E01B7/02, E01B7/24 | [2018/45] | CPC: |
E01B7/02 (EP);
E01B7/24 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/24] |
Former [2018/45] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ZUNGENEINRICHTUNG UND VERFAHREN ZUR HERSTELLUNG EINER ZUNGENEINRICHTUNG | [2018/45] | English: | TONGUE DEVICE AND METHOD FOR MANUFACTURING SAME | [2018/45] | French: | AIGUILLAGE ET PROCÉDÉ DE FABRICATION D'UN AIGUILLAGE | [2018/45] | Examination procedure | 29.04.2019 | Amendment by applicant (claims and/or description) | 29.04.2019 | Examination requested [2019/24] | 29.04.2019 | Date on which the examining division has become responsible | 11.07.2019 | Despatch of a communication from the examining division (Time limit: M06) | 21.01.2020 | Reply to a communication from the examining division | 24.06.2020 | Despatch of a communication from the examining division (Time limit: M06) | 18.12.2020 | Reply to a communication from the examining division | 11.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 01.07.2021 | Reply to a communication from the examining division | 01.06.2022 | Communication of intention to grant the patent | 20.09.2022 | Fee for grant paid | 20.09.2022 | Fee for publishing/printing paid | 20.09.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 03.08.2023 | No opposition filed within time limit [2023/41] | Fees paid | Renewal fee | 14.05.2020 | Renewal fee patent year 03 | 18.05.2021 | Renewal fee patent year 04 | 25.04.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 02.11.2022 | DK | 02.11.2022 | EE | 02.11.2022 | FI | 02.11.2022 | HR | 02.11.2022 | IT | 02.11.2022 | LT | 02.11.2022 | LV | 02.11.2022 | MC | 02.11.2022 | RO | 02.11.2022 | RS | 02.11.2022 | SE | 02.11.2022 | SI | 02.11.2022 | SK | 02.11.2022 | SM | 02.11.2022 | NO | 02.02.2023 | GR | 03.02.2023 | IS | 02.03.2023 | PT | 02.03.2023 | IE | 03.05.2023 | [2024/26] |
Former [2024/21] | AL | 02.11.2022 | |
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
IE | 03.05.2023 | ||
Former [2024/08] | AL | 02.11.2022 | |
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
MC | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/51] | AL | 02.11.2022 | |
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SI | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/38] | AL | 02.11.2022 | |
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SK | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/37] | AL | 02.11.2022 | |
DK | 02.11.2022 | ||
EE | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/35] | DK | 02.11.2022 | |
EE | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
RO | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/34] | DK | 02.11.2022 | |
EE | 02.11.2022 | ||
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/33] | DK | 02.11.2022 | |
FI | 02.11.2022 | ||
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
SM | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/25] | FI | 02.11.2022 | |
HR | 02.11.2022 | ||
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
RS | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
IS | 02.03.2023 | ||
PT | 02.03.2023 | ||
Former [2023/23] | FI | 02.11.2022 | |
LT | 02.11.2022 | ||
LV | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
GR | 03.02.2023 | ||
PT | 02.03.2023 | ||
Former [2023/22] | FI | 02.11.2022 | |
LT | 02.11.2022 | ||
SE | 02.11.2022 | ||
NO | 02.02.2023 | ||
PT | 02.03.2023 | ||
Former [2023/20] | LT | 02.11.2022 | |
NO | 02.02.2023 | Documents cited: | Search | [X]DE521341 (SCHMIDT PAUL) [X] 1,6,14 * page 2; figure - *; | [XI]DE1048938 (GUTEHOFFNUNGSHUETTE STERKRADE) [X] 1-5,12,14,15 * the whole document * [I] 8-11,13; | [X]DE19825792 (SCHRECK MIEVES GMBH [DE]) [X] 1,7,12,14 * columns 3,4; figure - *; | [A]DE102012103713 (THYSSENKRUPP GFT GLEISTECHNIK [DE]) [A] 1-6,13-15* abstract * | Examination | DE102010037110 |