blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3403915

EP3403915 - WATERCRAFT WITH MANUAL PROPULSION SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  19.03.2021
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  10.04.2020
FormerGrant of patent is intended
Status updated on  25.11.2019
FormerExamination is in progress
Status updated on  12.06.2019
FormerRequest for examination was made
Status updated on  27.05.2019
FormerThe application has been published
Status updated on  19.10.2018
Most recent event   Tooltip15.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 17.08.2022  [2022/33]
Applicant(s)For all designated states
Sunrunner Products, LLC
90 State Street, Suite 700, Office 40
Albany, NY 12207 / US
[2020/18]
Former [2018/47]For all designated states
Sunrunner Products, LLC
253A State Route 86
Paul Smiths, NY 12970 / US
Inventor(s)01 / Bailey, George William
803 3rd. Avenue
Oriental, NC 28571 / US
 [2020/18]
Former [2018/47]01 / Bailey, George William
253A State Route 86
Paul Smiths, NY New York 12970 / US
Representative(s)Barker Brettell LLP
100 Hagley Road
Edgbaston
Birmingham B16 8QQ / GB
[2018/47]
Application number, filing date18172257.015.05.2018
[2018/47]
Priority number, dateUS20171559534615.05.2017         Original published format: US201715595346
US20181589301809.02.2018         Original published format: US201815893018
[2018/47]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3403915
Date:21.11.2018
Language:EN
[2018/47]
Type: B1 Patent specification 
No.:EP3403915
Date:13.05.2020
Language:EN
[2020/20]
Search report(s)(Supplementary) European search report - dispatched on:EP10.09.2018
ClassificationIPC:B63H16/08, // B63H1/32, B63B35/73, A63B69/18
[2018/47]
CPC:
B63B34/56 (EP,US); B63H16/18 (US); B63H16/04 (US);
B63H16/08 (EP,US); A63B69/182 (EP,US); B63H1/32 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/26]
Former [2018/47]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:WASSERFAHRZEUG MIT MANUELLEM ANTRIEBSSYSTEM[2018/47]
English:WATERCRAFT WITH MANUAL PROPULSION SYSTEM[2018/47]
French:EMBARCATION DOTÉE D'UN SYSTÈME DE PROPULSION MANUELLE[2018/47]
Examination procedure21.05.2019Amendment by applicant (claims and/or description)
21.05.2019Examination requested  [2019/26]
21.05.2019Date on which the examining division has become responsible
17.06.2019Despatch of a communication from the examining division (Time limit: M04)
11.10.2019Reply to a communication from the examining division
26.11.2019Communication of intention to grant the patent
30.03.2020Fee for grant paid
30.03.2020Fee for publishing/printing paid
30.03.2020Receipt of the translation of the claim(s)
Opposition(s)16.02.2021No opposition filed within time limit [2021/16]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.05.2018
AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MK13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
TR13.05.2020
IE15.05.2020
LU15.05.2020
BE31.05.2020
FR13.07.2020
BG13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
[2022/33]
Former [2022/27]HU15.05.2018
AL13.05.2020
AT13.05.2020
CY13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
MT13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
TR13.05.2020
IE15.05.2020
LU15.05.2020
BE31.05.2020
FR13.07.2020
BG13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/23]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SI13.05.2020
SK13.05.2020
SM13.05.2020
IE15.05.2020
LU15.05.2020
BE31.05.2020
FR13.07.2020
BG13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/20]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SK13.05.2020
SM13.05.2020
IE15.05.2020
LU15.05.2020
BG13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/15]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SK13.05.2020
SM13.05.2020
LU15.05.2020
BG13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/14]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
MC13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/10]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
PL13.05.2020
RO13.05.2020
RS13.05.2020
SK13.05.2020
SM13.05.2020
BG13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/09]AL13.05.2020
AT13.05.2020
CZ13.05.2020
DK13.05.2020
EE13.05.2020
ES13.05.2020
HR13.05.2020
IT13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SM13.05.2020
BG13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/08]AL13.05.2020
DK13.05.2020
ES13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RO13.05.2020
RS13.05.2020
SM13.05.2020
BG13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/04]AL13.05.2020
HR13.05.2020
LT13.05.2020
LV13.05.2020
NL13.05.2020
RS13.05.2020
BG13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2021/01]HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
BG13.08.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/51]HR13.05.2020
LT13.05.2020
LV13.05.2020
RS13.05.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/50]HR13.05.2020
LT13.05.2020
LV13.05.2020
GR14.08.2020
IS13.09.2020
PT14.09.2020
Former [2020/49]LT13.05.2020
IS13.09.2020
PT14.09.2020
Former [2020/47]LT13.05.2020
IS13.09.2020
Former [2020/46]IS13.09.2020
Documents cited:Search[A]US4659077  (STROPKAY EDWARD J [US]) [A] 11 * column 5, line 36 - line 65 * * figure 5 *;
 [Y]US5194023  (STONE EDWARD [CA]) [Y] 1-15 * column 1, line 29 - line 48 * * column 2, line 40 - line 54 * * column 3, line 59 - line 68 * * figures 1, 2 *;
 [Y]US7048599  (GARWOOD CLINT [US], et al) [Y] 1-15 * column 1, line 18 - line 59 * * column 3, line 19 - column 4, line 7 * * figures 1-6 *;
 [A]DE202008005225U  (PRIS SERGEJ [DE]) [A] 10 * paragraph [0039] * * figure 2 *;
 [A]US2010221963  (WILKINSON STUART LESLIE [CA]) [A] 8,13 * paragraphs [0056] , [0 57] * * figures 1, 3 - 6 *;
 [A]CH702773  (PRONIN VLADIMIR [CH]) [A] 1 * abstract ** figure 6 *
by applicantUS4867443
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.