EP3409507 - TIRE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.09.2021 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 02.10.2020 | ||
Former | Grant of patent is intended Status updated on 09.07.2020 | ||
Former | Examination is in progress Status updated on 15.11.2019 | ||
Former | Request for examination was made Status updated on 07.06.2019 | ||
Former | The application has been published Status updated on 02.11.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Sumitomo Rubber Industries, Ltd. 6-9, Wakinohama-cho 3-chome Chuo-ku Kobe-shi Hyogo-ken / JP | [2018/49] | Inventor(s) | 01 /
KIMISHIMA, Takahiro c/o Sumitomo Rubber Industries, Ltd. 6-9, Wakinohama-cho 3-chome Chuo-ku Kobe-shi, Hyogo 651-0072 / JP | [2018/49] | Representative(s) | Manitz Finsterwald Patent- und Rechtsanwaltspartnerschaft mbB Martin-Greif-Strasse 1 80336 München / DE | [2020/45] |
Former [2018/49] | Manitz Finsterwald Patentanwälte PartmbB Martin-Greif-Strasse 1 80336 München / DE | Application number, filing date | 18173057.3 | 17.05.2018 | [2018/49] | Priority number, date | JP20170105841 | 29.05.2017 Original published format: JP 2017105841 | [2018/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3409507 | Date: | 05.12.2018 | Language: | EN | [2018/49] | Type: | B1 Patent specification | No.: | EP3409507 | Date: | 04.11.2020 | Language: | EN | [2020/45] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.09.2018 | Classification | IPC: | B60C11/04, B60C11/12, B60C11/03 | [2018/49] | CPC: |
B60C11/04 (EP,US);
B60C11/03 (CN);
B60C11/0327 (US);
B60C11/01 (US);
B60C11/0306 (US);
B60C11/11 (US);
B60C11/12 (CN);
B60C11/1204 (EP,US);
B60C11/1236 (EP,US);
B60C2011/0344 (US);
B60C2011/036 (EP,US);
B60C2011/0365 (US);
B60C2011/0372 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/28] |
Former [2018/49] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | REIFEN | [2018/49] | English: | TIRE | [2018/49] | French: | PNEUMATIQUE | [2018/49] | Examination procedure | 04.06.2019 | Examination requested [2019/28] | 04.06.2019 | Date on which the examining division has become responsible | 19.11.2019 | Despatch of a communication from the examining division (Time limit: M04) | 25.02.2020 | Reply to a communication from the examining division | 10.07.2020 | Communication of intention to grant the patent | 24.09.2020 | Fee for grant paid | 24.09.2020 | Fee for publishing/printing paid | 24.09.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 05.08.2021 | No opposition filed within time limit [2021/41] | Fees paid | Renewal fee | 30.03.2020 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.05.2018 | AL | 04.11.2020 | AT | 04.11.2020 | CY | 04.11.2020 | CZ | 04.11.2020 | DK | 04.11.2020 | EE | 04.11.2020 | ES | 04.11.2020 | FI | 04.11.2020 | HR | 04.11.2020 | IT | 04.11.2020 | LT | 04.11.2020 | LV | 04.11.2020 | MC | 04.11.2020 | MK | 04.11.2020 | NL | 04.11.2020 | PL | 04.11.2020 | RO | 04.11.2020 | RS | 04.11.2020 | SE | 04.11.2020 | SI | 04.11.2020 | SK | 04.11.2020 | SM | 04.11.2020 | TR | 04.11.2020 | BG | 04.02.2021 | NO | 04.02.2021 | GR | 05.02.2021 | IS | 04.03.2021 | PT | 04.03.2021 | IE | 17.05.2021 | LU | 17.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | LI | 31.05.2021 | [2024/29] |
Former [2024/23] | HU | 17.05.2018 | |
AL | 04.11.2020 | ||
AT | 04.11.2020 | ||
CY | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
MK | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
IE | 17.05.2021 | ||
LU | 17.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/33] | HU | 17.05.2018 | |
AL | 04.11.2020 | ||
AT | 04.11.2020 | ||
CY | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
IE | 17.05.2021 | ||
LU | 17.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2023/30] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CY | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
IE | 17.05.2021 | ||
LU | 17.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/34] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
IE | 17.05.2021 | ||
LU | 17.05.2021 | ||
BE | 31.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/23] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
IE | 17.05.2021 | ||
LU | 17.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/21] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
PT | 04.03.2021 | ||
IE | 17.05.2021 | ||
LU | 17.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/10] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
PT | 04.03.2021 | ||
LU | 17.05.2021 | ||
CH | 31.05.2021 | ||
LI | 31.05.2021 | ||
Former [2022/09] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
LU | 17.05.2021 | ||
Former [2022/07] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/50] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/48] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/46] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/45] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/37] | AT | 04.11.2020 | |
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/36] | AT | 04.11.2020 | |
CZ | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/35] | AT | 04.11.2020 | |
CZ | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/33] | AT | 04.11.2020 | |
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/32] | AT | 04.11.2020 | |
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/28] | AT | 04.11.2020 | |
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/25] | AT | 04.11.2020 | |
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/23] | AT | 04.11.2020 | |
FI | 04.11.2020 | ||
LV | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
PT | 04.03.2021 | ||
Former [2021/22] | FI | 04.11.2020 | |
RS | 04.11.2020 | ||
NO | 04.02.2021 | ||
PT | 04.03.2021 | ||
Former [2021/21] | FI | 04.11.2020 | |
PT | 04.03.2021 | ||
Former [2021/20] | FI | 04.11.2020 | Documents cited: | Search | [XAI]JPH11291715 (SUMITOMO RUBBER IND) [X] 1-4,6-9 * abstract * [A] 5 [I] 10; | [XAI]JP2000006616 (SUMITOMO RUBBER IND) [X] 1-5,8,9 * abstract * [A] 6,7 [I] 10; | [XAI]JP2010137662 (TOYO TIRE & RUBBER CO) [X] 1,2,4,8,9 * abstract * [A] 3,5-7 [I] 10; | [XI]JP2012020621 (BRIDGESTONE CORP) [X] 1-9 * figures 3,4a-4c * [I] 10; | [XA]WO2013098634 (PIRELLI [IT]) [X] 1-3,5-10 * paragraph [0050] - paragraph [0125]; figures 2,3 *[A] 4; | [XAI]EP2792505 (SUMITOMO RUBBER IND [JP]) [X] 1-3,5-9 * paragraph [0036] - paragraph [0055]; figures 2,4 * [A] 4 [I] 10; | [XAI]JP2016060345 (SUMITOMO RUBBER IND) [X] 1-3,6-9 * figures 1,3 * [A] 4,5 [I] 10; | [XAI]US2016144668 (OBA RYO [JP]) [X] 1-3,5-9 * paragraph [0047] - paragraph [0054]; figures 1,3 * [A] 4 [I] 10; | [XAI]US2016263946 (BONNAMOUR MATTHIEU [FR], et al) [X] 1-3,5,8,9 * paragraph [0034] - paragraph [0036]; figure 2 * [A] 4,6,7 [I] 10 | by applicant | JP2016210226 |