EP3389047 - LINEAR PREDICTION ANALYSIS DEVICE, METHOD, PROGRAM, AND STORAGE MEDIUM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.07.2020 Database last updated on 07.06.2024 | |
Former | The patent has been granted Status updated on 09.08.2019 | ||
Former | Grant of patent is intended Status updated on 07.03.2019 | ||
Former | Request for examination was made Status updated on 14.09.2018 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Nippon Telegraph and Telephone Corporation 5-1, Otemachi 1-chome Chiyoda-ku Tokyo 100-8116 / JP | [2018/42] | Inventor(s) | 01 /
KAMAMOTO, Yutaka c/o NTT Intellectual Property Center 9-11, Midori-cho 3-chome Musashino-shi, Tokyo 180-8585 / JP | 02 /
MORIYA, Takehiro c/o NTT Intellectual Property Center 9-11, Midori-cho 3-chome Musashino-shi, Tokyo 180-8585 / JP | 03 /
HARADA, Noboru c/o NTT Intellectual Property Center 9-11, Midori-cho 3-chome Musashino-shi, Tokyo 180-8585 / JP | [2018/42] | Representative(s) | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Strasse 29 80336 München / DE | [2018/42] | Application number, filing date | 18173641.4 | 16.07.2014 | [2018/42] | Priority number, date | JP20130149160 | 18.07.2013 Original published format: JP 2013149160 | [2018/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3389047 | Date: | 17.10.2018 | Language: | EN | [2018/42] | Type: | B1 Patent specification | No.: | EP3389047 | Date: | 11.09.2019 | Language: | EN | [2019/37] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 11.09.2018 | Classification | IPC: | G10L19/06, G10L25/12 | [2018/42] | CPC: |
G10L19/06 (EP,US);
G10L19/0212 (US);
G10L19/032 (US);
G10L21/04 (US);
G10L25/06 (US);
G10L25/12 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/42] | Title | German: | VORRICHTUNG ZUR ANALYSE EINER LINEAREN VORHERSAGE, VERFAHREN, PROGRAMM UND SPEICHERMEDIUM | [2018/42] | English: | LINEAR PREDICTION ANALYSIS DEVICE, METHOD, PROGRAM, AND STORAGE MEDIUM | [2018/42] | French: | DISPOSITIF D'ANALYSE PAR PRÉDICTION LINÉAIRE, PROCÉDÉ, PROGRAMME ET SUPPORT D'INFORMATIONS | [2018/42] | Examination procedure | 22.05.2018 | Examination requested [2018/42] | 22.05.2018 | Date on which the examining division has become responsible | 11.01.2019 | Amendment by applicant (claims and/or description) | 08.03.2019 | Communication of intention to grant the patent | 10.07.2019 | Fee for grant paid | 10.07.2019 | Fee for publishing/printing paid | 10.07.2019 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP14826090.4 / EP3012835 | Opposition(s) | 15.06.2020 | No opposition filed within time limit [2020/34] | Fees paid | Renewal fee | 22.05.2018 | Renewal fee patent year 03 | 22.05.2018 | Renewal fee patent year 04 | 22.05.2018 | Renewal fee patent year 05 | 31.07.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.07.2014 | AL | 11.09.2019 | AT | 11.09.2019 | CY | 11.09.2019 | CZ | 11.09.2019 | DK | 11.09.2019 | EE | 11.09.2019 | FI | 11.09.2019 | HR | 11.09.2019 | LT | 11.09.2019 | LV | 11.09.2019 | MC | 11.09.2019 | MK | 11.09.2019 | MT | 11.09.2019 | RO | 11.09.2019 | RS | 11.09.2019 | SE | 11.09.2019 | SI | 11.09.2019 | SK | 11.09.2019 | SM | 11.09.2019 | BG | 11.12.2019 | NO | 11.12.2019 | GR | 12.12.2019 | IS | 12.01.2020 | PT | 13.01.2020 | [2022/33] |
Former [2022/28] | HU | 16.07.2014 | |
AL | 11.09.2019 | ||
AT | 11.09.2019 | ||
CY | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
MC | 11.09.2019 | ||
MT | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
Former [2021/15] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
MC | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
Former [2020/37] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SI | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
Former [2020/36] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
DK | 11.09.2019 | ||
EE | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
IS | 12.01.2020 | ||
PT | 13.01.2020 | ||
Former [2020/27] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
EE | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SK | 11.09.2019 | ||
SM | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/26] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
CZ | 11.09.2019 | ||
EE | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
SK | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 11.09.2019 | |
AT | 11.09.2019 | ||
EE | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RO | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
Former [2020/22] | AL | 11.09.2019 | |
EE | 11.09.2019 | ||
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
PT | 13.01.2020 | ||
Former [2020/15] | AL | 11.09.2019 | |
FI | 11.09.2019 | ||
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
Former [2020/12] | FI | 11.09.2019 | |
HR | 11.09.2019 | ||
LT | 11.09.2019 | ||
LV | 11.09.2019 | ||
RS | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
GR | 12.12.2019 | ||
Former [2020/10] | FI | 11.09.2019 | |
LT | 11.09.2019 | ||
SE | 11.09.2019 | ||
BG | 11.12.2019 | ||
NO | 11.12.2019 | ||
Former [2020/09] | FI | 11.09.2019 | |
LT | 11.09.2019 | ||
NO | 11.12.2019 | ||
Former [2020/08] | LT | 11.09.2019 | |
NO | 11.12.2019 | Documents cited: | Search | [A]US2009204397 (DEN DRINKER ALBERTUS CORNELIS [NL]) [A] 1-6* paragraph [0080] - paragraph [0093]; figure 4 *; | [A]US2010169086 (QI FENGYAN [CN], et al) [A] 1-6 * paragraph [0043] - paragraph [0054]; figure 1 * | by applicant | - YOH'ICHI TOHKURA; FUMITADA ITAKURA; SHIN'ICHIRO HASHIMOTO, "Spectral Smoothing Technique in PARCOR Speech Analysis-Synthesis", IEEE Trans. on Acoustics, Speech, and Signal Processing, (19780000), vol. ASSP-26, no. 6, doi:doi:10.1109/TASSP.1978.1163165, XP002032606 DOI: http://dx.doi.org/10.1109/TASSP.1978.1163165 |