blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3441698

EP3441698 - HYBRID TANDEM COMPRESSOR SYSTEM AND CONTROL METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.07.2021
Database last updated on 16.09.2024
FormerThe patent has been granted
Status updated on  24.07.2020
FormerGrant of patent is intended
Status updated on  24.03.2020
FormerRequest for examination was made
Status updated on  23.08.2019
FormerThe application has been published
Status updated on  11.01.2019
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Lennox Industries Inc.
2100 Lake Park Blvd.
Richardson, TX 75080 / US
[2019/07]
Inventor(s)01 / BERG, Eric
5609 Glenview lane
The Colony, TX Texas 75056 / US
02 / IYENGAR, Ajay
1600 Metrocrest Dr
Carrollton, TX 75006 / US
 [2019/07]
Representative(s)Protector IP AS
Pilestredet 33
0166 Oslo / NO
[2020/35]
Former [2019/07]Protector IP AS
Oscarsgate 20
0352 Oslo / NO
Application number, filing date18173841.023.05.2018
[2019/07]
Priority number, dateUS20171567124308.08.2017         Original published format: US201715671243
[2019/07]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3441698
Date:13.02.2019
Language:EN
[2019/07]
Type: B1 Patent specification 
No.:EP3441698
Date:26.08.2020
Language:EN
[2020/35]
Search report(s)(Supplementary) European search report - dispatched on:EP27.11.2018
ClassificationIPC:F25B49/02
[2019/07]
CPC:
F25B49/022 (EP,US); F24F11/83 (US); F24F11/85 (US);
F24F2110/12 (US); F24F2110/22 (US); F25B2400/0751 (EP,US);
F25B2600/0251 (EP,US); F25B2600/0253 (EP,US); F25B2700/02 (EP,US);
F25B2700/2104 (EP,US); Y02B30/70 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/39]
Former [2019/07]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:HYBRIDTANDEMKOMPRESSORSYSTEM UND STEURERUNGSVERFAHREN[2019/07]
English:HYBRID TANDEM COMPRESSOR SYSTEM AND CONTROL METHOD[2019/07]
French:SYSTÈME DE COMPRESSEUR TANDEM HYBRIDE ET PROCÉDÉ DE COMMANDE[2019/07]
Examination procedure13.08.2019Amendment by applicant (claims and/or description)
13.08.2019Examination requested  [2019/39]
13.08.2019Date on which the examining division has become responsible
25.03.2020Communication of intention to grant the patent
17.07.2020Fee for grant paid
17.07.2020Fee for publishing/printing paid
17.07.2020Receipt of the translation of the claim(s)
Opposition(s)27.05.2021No opposition filed within time limit [2021/31]
Fees paidRenewal fee
22.05.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.05.2018
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
MT26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
IE23.05.2021
LU23.05.2021
[2024/42]
Former [2024/23]HU23.05.2018
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
IE23.05.2021
LU23.05.2021
Former [2023/33]HU23.05.2018
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
IE23.05.2021
LU23.05.2021
Former [2023/30]AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
IE23.05.2021
LU23.05.2021
Former [2022/21]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
IE23.05.2021
LU23.05.2021
Former [2022/09]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
LU23.05.2021
Former [2022/07]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/36]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/34]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
IT26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/28]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/25]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
ES26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/23]AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/22]CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/21]DK26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/12]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
NL26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/10]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/09]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
PT28.12.2020
Former [2021/08]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
PT28.12.2020
Former [2021/07]FI26.08.2020
LT26.08.2020
NO26.11.2020
Documents cited:Search[A]EP1099918  (MAERSK CONTAINER IND AS [DK]) [A] 11* paragraph [0038] - paragraph [0109]; figures 1-5 *;
 [XAI]US2005091998  (CHO EUN-JUN [KR], et al) [X] 1-5,7-10,12-14 * paragraph [0045] - paragraph [0074]; figures 1-5 * [A] 11 [I] 6;
 [XAI]US2006225445  (LIFSON ALEXANDER [US], et al) [X] 1-5,7-10,12-14 * paragraph [0020] - paragraph [0034]; figures 1-5 * [A] 11 [I] 6;
 [A]WO2009061804  (CARRIER CORP [US], et al) [A] 11 * paragraph [0018] - paragraph [0034]; figures 1-4 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.