blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3409445

EP3409445 - THREE-DIMENSIONAL PRINTER COMPRISING A NOZZLE WITH ECCENTRIC DICHARGE PORT [Right-click to bookmark this link]
Former [2018/49]NOZZLE FOR THREE-DIMENSIONAL (3D) PRINTER INCLUDING ECCENTRIC DICHARGE PORT AND 3D PRINTER INCLUDING NOZZLE
[2020/13]
StatusNo opposition filed within time limit
Status updated on  09.07.2021
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  31.07.2020
FormerGrant of patent is intended
Status updated on  26.03.2020
FormerRequest for examination was made
Status updated on  02.11.2018
Most recent event   Tooltip03.05.2024Lapse of the patent in a contracting state
New state(s): MK
published on 05.06.2024  [2024/23]
Applicant(s)For all designated states
Korea Institute of Science and Technology
5 Hwarang-ro 14-gil
Seongbuk-gu
Seoul 02792 / KR
[2018/49]
Inventor(s)01 / MOON, Myoung-Woon
5, Hwarang-ro 14-gil, Seongbuk-gu
02792 Seoul / KR
02 / JO, Wonjin
5, Hwarang-ro 14-gil, Seongbuk-gu
02792 Seoul / KR
03 / KWON, O Chang
5, Hwarang-ro 14-gil, Seongbuk-gu
02792 Seoul / KR
 [2018/49]
Representative(s)Walaski, Jan Filip
Venner Shipley LLP
200 Aldersgate
London EC1A 4HD / GB
[2018/49]
Application number, filing date18174309.725.05.2018
[2018/49]
Priority number, dateKR2017006488825.05.2017         Original published format: KR 20170064888
KR2018004801925.04.2018         Original published format: KR 20180048019
[2018/49]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3409445
Date:05.12.2018
Language:EN
[2018/49]
Type: B1 Patent specification 
No.:EP3409445
Date:02.09.2020
Language:EN
[2020/36]
Search report(s)(Supplementary) European search report - dispatched on:EP02.11.2018
ClassificationIPC:B29C64/209, B29C64/118, B33Y30/00, B33Y10/00, B33Y80/00
[2018/49]
CPC:
B29C64/209 (EP,US); B22F10/18 (EP,US); B22F12/53 (EP,US);
B22F12/55 (EP,US); B29C64/118 (EP,US); B29C64/227 (US);
B29C64/245 (US); B33Y10/00 (EP,US); B33Y30/00 (EP,US);
B33Y80/00 (EP,US); B29K2101/12 (US); Y02P10/25 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/49]
TitleGerman:DREIDIMENSIONALER DRUCKER, DER EINE DÜSE MIT EXZENTRISCHER AUSLASSÖFFNUNG UMFASST[2020/13]
English:THREE-DIMENSIONAL PRINTER COMPRISING A NOZZLE WITH ECCENTRIC DICHARGE PORT[2020/13]
French:IMPRIMANTE TRIDIMENSIONNELLE COMPRENANT UNE BUSE AVEC UN ORIFICE DE DÉCHARGE EXCENTRÉ[2020/13]
Former [2018/49]DÜSE FÜR DREIDIMENSIONALEN (3D) DRUCKER MIT EXZENTRISCHEM AUSGABEPORT UND 3D-DRUCKER MIT DÜSE
Former [2018/49]NOZZLE FOR THREE-DIMENSIONAL (3D) PRINTER INCLUDING ECCENTRIC DICHARGE PORT AND 3D PRINTER INCLUDING NOZZLE
Former [2018/49]BUSE POUR IMPRIMANTE TRIDIMENSIONNELLE (3D) COMPRENANT UN PORT D'ÉVACUATION EXCENTRIQUE ET IMPRIMANTE 3D COMPRENANT LA BUSE
Examination proceduredeletedDate on which the examining division has become responsible
25.05.2018Examination requested  [2018/49]
22.05.2019Amendment by applicant (claims and/or description)
27.03.2020Communication of intention to grant the patent
27.07.2020Fee for grant paid
27.07.2020Fee for publishing/printing paid
27.07.2020Receipt of the translation of the claim(s)
Opposition(s)03.06.2021No opposition filed within time limit [2021/32]
Fees paidRenewal fee
23.03.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.05.2018
AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
MK02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
NL23.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE25.05.2021
LU25.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
[2024/23]
Former [2023/33]HU25.05.2018
AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
NL23.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE25.05.2021
LU25.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2023/30]AL02.09.2020
AT02.09.2020
CY02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
NL23.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE25.05.2021
LU25.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2023/29]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
NL23.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE25.05.2021
LU25.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/34]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE25.05.2021
LU25.05.2021
BE31.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/21]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
IE25.05.2021
LU25.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/11]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
LU25.05.2021
CH31.05.2021
LI31.05.2021
Former [2022/09]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
LU25.05.2021
Former [2022/07]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
MC02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/48]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
IT02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/37]AL02.09.2020
AT02.09.2020
CZ02.09.2020
DK02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/36]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SI02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/28]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SK02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/25]AL02.09.2020
AT02.09.2020
CZ02.09.2020
EE02.09.2020
ES02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
IS02.01.2021
PT04.01.2021
Former [2021/22]CZ02.09.2020
EE02.09.2020
FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RO02.09.2020
RS02.09.2020
SE02.09.2020
SM02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/21]FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
PT04.01.2021
Former [2021/10]FI02.09.2020
HR02.09.2020
LT02.09.2020
LV02.09.2020
PL02.09.2020
RS02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
Former [2021/09]FI02.09.2020
LT02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
GR03.12.2020
Former [2021/08]FI02.09.2020
LT02.09.2020
SE02.09.2020
BG02.12.2020
NO02.12.2020
Former [2021/07]FI02.09.2020
LT02.09.2020
NO02.12.2020
Documents cited:Search[Y]US2015119479  (KOEHLER FREDERICK B [US], et al) [Y] 14,15 * figure 1; claim 1 * * paragraph [0019] *;
 [A]US2015197060  (CARR NATHAN A [US], et al) [A] 1-15 * figures 1,3 * * claim - * * paragraphs [0020] , [0021] *;
 [X]EP2905118  (BOEING CO [US]) [X] 1 * claims 1,10 * * figures 5,12,13 *;
 [XY]KR101575061B  (BAE YOU GEON [KR]) [X] 1,4-8,13 * figures 2-4 * * claims 1,2 * [Y] 14,15;
 [X]CN103876263B  (UNIV ZHEJIANG) [X] 1 * figure 2 *;
 [A]WO2016193119  (PHILIPS LIGHTING HOLDING BV [NL]) [A] 1-15 * figure - * * page 2, lines 20-30 * * page 15, lines 1-16 ** claim 1 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.