EP3409332 - REAR SKI TOURING BINDING DEVICE WITH SKI BRAKE LOCKING DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.02.2021 Database last updated on 04.06.2024 | |
Former | The patent has been granted Status updated on 13.03.2020 | ||
Former | Grant of patent is intended Status updated on 07.11.2019 | ||
Former | Request for examination was made Status updated on 31.05.2019 | ||
Former | The application has been published Status updated on 02.11.2018 | Most recent event Tooltip | 15.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 17.08.2022 [2022/33] | Applicant(s) | For all designated states Felisaz SAS ZI de Marvays 21 rue des Cyprès 74300 Thiez / FR | [2018/49] | Inventor(s) | 01 /
SAVERET, Florian 6 Rue Montaigne 74000 ANNECY / FR | 02 /
POISSON, Pierre 67 rue du quart dernier 74130 MONT SAXONNEX / FR | [2018/49] | Representative(s) | Croonenbroek, Thomas Jakob, et al Innovincia 11, avenue des Tilleuls 74200 Thonon-les-Bains / FR | [2018/49] | Application number, filing date | 18174734.6 | 29.05.2018 | [2018/49] | Priority number, date | FR20170054697 | 29.05.2017 Original published format: FR 1754697 | [2018/49] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP3409332 | Date: | 05.12.2018 | Language: | FR | [2018/49] | Type: | B1 Patent specification | No.: | EP3409332 | Date: | 15.04.2020 | Language: | FR | [2020/16] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.11.2018 | Classification | IPC: | A63C9/00, A63C9/08, A63C9/086, A63C7/10 | [2018/49] | CPC: |
A63C9/006 (EP);
A63C7/104 (EP);
A63C7/1053 (EP);
A63C9/0807 (EP);
A63C9/086 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/27] |
Former [2018/49] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | HINTERBACKEN FÜR EINE TOURENBINDUNG MIT EINER VERRIEGELUNGSVORRICHTUNG DER SKIBREMSE | [2018/49] | English: | REAR SKI TOURING BINDING DEVICE WITH SKI BRAKE LOCKING DEVICE | [2018/49] | French: | DISPOSITIF ARRIERE DE FIXATION DE SKI DE RANDONNEE A DISPOSITIF DE VERROUILLAGE DE FREIN DE SKI | [2018/49] | Examination procedure | 23.05.2019 | Examination requested [2019/27] | 23.05.2019 | Date on which the examining division has become responsible | 08.11.2019 | Communication of intention to grant the patent | 04.03.2020 | Fee for grant paid | 04.03.2020 | Fee for publishing/printing paid | 04.03.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 18.01.2021 | No opposition filed within time limit [2021/12] |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.05.2018 | AL | 15.04.2020 | CY | 15.04.2020 | CZ | 15.04.2020 | DK | 15.04.2020 | EE | 15.04.2020 | ES | 15.04.2020 | FI | 15.04.2020 | HR | 15.04.2020 | LT | 15.04.2020 | LV | 15.04.2020 | MC | 15.04.2020 | MK | 15.04.2020 | MT | 15.04.2020 | NL | 15.04.2020 | PL | 15.04.2020 | RO | 15.04.2020 | RS | 15.04.2020 | SE | 15.04.2020 | SI | 15.04.2020 | SK | 15.04.2020 | SM | 15.04.2020 | TR | 15.04.2020 | IE | 29.05.2020 | LU | 29.05.2020 | BE | 31.05.2020 | BG | 15.07.2020 | NO | 15.07.2020 | GR | 16.07.2020 | IS | 15.08.2020 | PT | 17.08.2020 | [2022/33] |
Former [2022/27] | HU | 29.05.2018 | |
AL | 15.04.2020 | ||
CY | 15.04.2020 | ||
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
MT | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
TR | 15.04.2020 | ||
IE | 29.05.2020 | ||
LU | 29.05.2020 | ||
BE | 31.05.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/24] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SI | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
IE | 29.05.2020 | ||
LU | 29.05.2020 | ||
BE | 31.05.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/20] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
IE | 29.05.2020 | ||
LU | 29.05.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/15] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
LU | 29.05.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
PL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SK | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | AL | 15.04.2020 | |
CZ | 15.04.2020 | ||
DK | 15.04.2020 | ||
EE | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
MC | 15.04.2020 | ||
NL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/08] | AL | 15.04.2020 | |
DK | 15.04.2020 | ||
ES | 15.04.2020 | ||
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RO | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
SM | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/04] | AL | 15.04.2020 | |
FI | 15.04.2020 | ||
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/01] | FI | 15.04.2020 | |
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
BG | 15.07.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/51] | FI | 15.04.2020 | |
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
RS | 15.04.2020 | ||
SE | 15.04.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | FI | 15.04.2020 | |
HR | 15.04.2020 | ||
LT | 15.04.2020 | ||
LV | 15.04.2020 | ||
NL | 15.04.2020 | ||
SE | 15.04.2020 | ||
NO | 15.07.2020 | ||
GR | 16.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 15.04.2020 | |
LT | 15.04.2020 | ||
NL | 15.04.2020 | ||
SE | 15.04.2020 | ||
NO | 15.07.2020 | ||
IS | 15.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 15.04.2020 | |
NO | 15.07.2020 | ||
IS | 15.08.2020 | ||
Former [2020/46] | IS | 15.08.2020 | Documents cited: | Search | [T]EP0199098 (BARTHEL FRITZ) [T] 1-9* figures 1-12 *; | [A]WO2009105866 (G3 GENUINE GUIDE GEAR INC [CA], et al) [A] 1-9 * page 17, line 31 - page 18, line 28; figures 20a,20b,21a, 21b,22a,22b,23,24a,24b,25a,25b *; | [A]DE202012002705U (SALEWA SPORT AG [CH]) [A] 1-9 * paragraph [0023] - paragraph [0024]; figures 4,5 *; | [A]EP2664365 (ROSSIGNOL SA [FR]) [A] 1-9 * paragraph [0032] - paragraph [0041]; figures 4,8,10 *; | [A]US2015014963 (SHUTE CAMERON ALLAN [CA], et al) [A] 1-9 * paragraph [0047] - paragraph [0051]; figure 10 *; | [A]DE102013224571 (SALEWA SPORT AG [CH]) [A] 1-9 * figures 1,3,4,5; claim 1 * |