blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3579535

EP3579535 - METHOD OF CONSTRUCTING A PREVIEW OF AN ELEVATED LENTICULAR PRINT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.01.2023
Database last updated on 22.05.2024
FormerThe patent has been granted
Status updated on  18.02.2022
FormerGrant of patent is intended
Status updated on  10.10.2021
FormerRequest for examination was made
Status updated on  19.06.2020
FormerThe application has been published
Status updated on  08.11.2019
Most recent event   Tooltip10.05.2024Lapse of the patent in a contracting state
New state(s): HU
published on 12.06.2024 [2024/24]
Applicant(s)For all designated states
Canon Production Printing Holding B.V.
Van der Grintenstraat 10
5914 HH Venlo / NL
[2020/48]
Former [2020/13]For all designated states
Canon Production Printing Holding B.V.
St. Urbanusweg 43
5914 CA Venlo / NL
Former [2019/50]For all designated states
OCE Holding B.V.
101 St. Urbanusweg 43
5914 CA Venlo / NL
Inventor(s)01 / IONASCU, Felicia G.
St. Urbanusweg 43
5914 CA Venlo / NL
02 / VALADE, Cédric T.
St. Urbanusweg 43
5914 CA Venlo / NL
 [2019/50]
Representative(s)Canon Production Printing IP Department
Canon Production Printing Netherlands B.V.
Van der Grintenstraat 10
5914 HH Venlo / NL
[2022/12]
Former [2019/50]OCE IP Department
St. Urbanusweg 43
5914 CA Venlo / NL
Application number, filing date18176361.606.06.2018
[2019/50]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3579535
Date:11.12.2019
Language:EN
[2019/50]
Type: B1 Patent specification 
No.:EP3579535
Date:23.03.2022
Language:EN
[2022/12]
Search report(s)(Supplementary) European search report - dispatched on:EP14.11.2018
ClassificationIPC:H04N1/40, H04N1/60
[2019/50]
CPC:
H04N1/40 (EP); H04N1/6011 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2020/30]
Former [2019/50]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR KONSTRUKTION EINER VORSCHAU EINES ERHÖHTEN LENTIKULARDRUCKS[2019/50]
English:METHOD OF CONSTRUCTING A PREVIEW OF AN ELEVATED LENTICULAR PRINT[2019/50]
French:PROCÉDÉ DE CONSTRUCTION D'UNE PRÉVISUALISATION D'UNE IMPRESSION LENTICULAIRE ÉLEVÉE[2019/50]
Examination procedure28.05.2020Amendment by applicant (claims and/or description)
12.06.2020Examination requested  [2020/30]
12.06.2020Date on which the examining division has become responsible
26.10.2021Communication of intention to grant the patent
10.02.2022Fee for grant paid
10.02.2022Fee for publishing/printing paid
10.02.2022Receipt of the translation of the claim(s)
Opposition(s)02.01.2023No opposition filed within time limit [2023/09]
Fees paidRenewal fee
30.06.2020Renewal fee patent year 03
30.06.2021Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU06.06.2018
AL23.03.2022
AT23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
MK23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
IE06.06.2022
LU06.06.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
IS23.07.2022
PT25.07.2022
[2024/24]
Former [2024/23]AL23.03.2022
AT23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
MK23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
IE06.06.2022
LU06.06.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
IS23.07.2022
PT25.07.2022
Former [2024/20]AL23.03.2022
AT23.03.2022
CY23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
IE06.06.2022
LU06.06.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/35]AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
IT23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
IE06.06.2022
LU06.06.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/25]AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SI23.03.2022
SK23.03.2022
SM23.03.2022
IE06.06.2022
LU06.06.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/21]AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
IE06.06.2022
LU06.06.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
CH30.06.2022
LI30.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/20]AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
IE06.06.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/08]AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
MC23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/07]AL23.03.2022
AT23.03.2022
CZ23.03.2022
DK23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2023/01]AL23.03.2022
AT23.03.2022
CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2022/51]AT23.03.2022
CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
IS23.07.2022
PT25.07.2022
Former [2022/50]AT23.03.2022
CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
PL23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/49]AT23.03.2022
CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SK23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/48]AT23.03.2022
CZ23.03.2022
EE23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/47]AT23.03.2022
ES23.03.2022
FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
RO23.03.2022
RS23.03.2022
SE23.03.2022
SM23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
PT25.07.2022
Former [2022/39]FI23.03.2022
HR23.03.2022
LT23.03.2022
LV23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/36]HR23.03.2022
LT23.03.2022
LV23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
GR24.06.2022
Former [2022/35]HR23.03.2022
LT23.03.2022
RS23.03.2022
SE23.03.2022
BG23.06.2022
NO23.06.2022
Former [2022/33]LT23.03.2022
NO23.06.2022
Documents cited:Search[A]US2001045956  (HURLEY JAMES T [US], et al) [A] 1-5* paragraphs [0024] - [0028] *;
 [A]GB2479777  (NAUTILUS GB LTD [GB]) [A] 1 * page 6, line 31 - page 9, line 23; figure 3 *;
 [XI]WO2017043065  (CANON KK [JP]) [X] 1,2,4 * paragraphs [0015] - [0034] * [I] 3,5;
 [A]  - WANG SHAOHAO ET AL, "Cartoon Rendering Illumination Model Based on Phong", 2013 SEVENTH INTERNATIONAL CONFERENCE ON IMAGE AND GRAPHICS, IEEE, (20130726), doi:10.1109/ICIG.2013.185, pages 913 - 919, XP032515488 [A] 1-5 * Section III.A. Phong illumination model. *

DOI:   http://dx.doi.org/10.1109/ICIG.2013.185
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.