EP3578383 - METHOD FOR REFINING A BUILDING PANEL [Right-click to bookmark this link] | |||
Former [2019/50] | METHOD FOR REFINING A LARGE FORMAT BUILDING PANEL | ||
[2022/27] | Status | No opposition filed within time limit Status updated on 12.04.2024 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 05.05.2023 | ||
Former | Grant of patent is intended Status updated on 09.11.2022 | ||
Former | Examination is in progress Status updated on 25.10.2022 | ||
Former | Grant of patent is intended Status updated on 28.06.2022 | ||
Former | Examination is in progress Status updated on 04.06.2021 | ||
Former | Request for examination was made Status updated on 08.11.2019 | Most recent event Tooltip | 19.04.2024 | Lapse of the patent in a contracting state New state(s): IE | published on 22.05.2024 [2024/21] | Applicant(s) | For all designated states Flooring Technologies Ltd. SmartCity Malta SCM01 Office 406 Ricasoli Kalkara SCM1001 / MT | [2019/50] | Inventor(s) | 01 /
BRAUN, Roger Geissburghalde 16 6130 Willisau / CH | 02 /
OLDORFF, Frank Brusewitzer Str. 50 19057 Schwerin / DE | 03 /
KALWA, Norbert Birkenweg18a 32805 Horn-Bad Meinberg / DE | 04 /
KLUPSCH, Rüdiger Am Blandikower Weg 22a 16909 Heiligengrabe / DE | [2019/50] | Representative(s) | Gramm, Lins & Partner Patent- und Rechtsanwälte PartGmbB Frankfurter Straße 3 C 38122 Braunschweig / DE | [2023/23] |
Former [2019/50] | Gramm, Lins & Partner Patent- und Rechtsanwälte PartGmbB Theodor-Heuss-Straße 1 38122 Braunschweig / DE | Application number, filing date | 18176818.5 | 08.06.2018 | [2019/50] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3578383 | Date: | 11.12.2019 | Language: | DE | [2019/50] | Type: | B1 Patent specification | No.: | EP3578383 | Date: | 07.06.2023 | Language: | DE | [2023/23] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.01.2019 | Classification | IPC: | B44C1/24, B44C5/04, E04F15/02 | [2019/50] | CPC: |
B44C5/04 (EP);
B44C1/24 (EP);
E04F15/02033 (EP);
E04F15/102 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2019/50] | Title | German: | VERFAHREN ZUR VEREDELUNG EINER BEREITGESTELLTEN BAUPLATTE | [2022/27] | English: | METHOD FOR REFINING A BUILDING PANEL | [2022/27] | French: | PROCÉDÉ DE FINISSAGE D'UN PANNEAU DE CONSTRUCTION | [2022/27] |
Former [2019/50] | VERFAHREN ZUR VEREDELUNG EINER GROSSFORMATIG BEREITGESTELLTEN BAUPLATTE | ||
Former [2019/50] | METHOD FOR REFINING A LARGE FORMAT BUILDING PANEL | ||
Former [2019/50] | PROCÉDÉ DE FINISSAGE D'UN PANNEAU DE CONSTRUCTION DE GRAND FORMAT | Examination procedure | 14.06.2019 | Amendment by applicant (claims and/or description) | 14.06.2019 | Examination requested [2019/50] | 14.06.2019 | Date on which the examining division has become responsible | 04.06.2021 | Despatch of a communication from the examining division (Time limit: M04) | 06.09.2021 | Reply to a communication from the examining division | 29.06.2022 | Communication of intention to grant the patent | 25.10.2022 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 10.11.2022 | Communication of intention to grant the patent | 17.03.2023 | Fee for grant paid | 17.03.2023 | Fee for publishing/printing paid | 17.03.2023 | Receipt of the translation of the claim(s) | Divisional application(s) | EP22208390.9 / EP4159470 | Opposition(s) | 08.03.2024 | No opposition filed within time limit [2024/20] | Fees paid | Renewal fee | 26.06.2020 | Renewal fee patent year 03 | 26.05.2021 | Renewal fee patent year 04 | 31.03.2022 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CZ | 07.06.2023 | HR | 07.06.2023 | MC | 07.06.2023 | RO | 07.06.2023 | RS | 07.06.2023 | SK | 07.06.2023 | SM | 07.06.2023 | IE | 08.06.2023 | NO | 07.09.2023 | GR | 08.09.2023 | IS | 07.10.2023 | [2024/21] |
Former [2024/16] | CZ | 07.06.2023 | |
HR | 07.06.2023 | ||
MC | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
Former [2024/10] | CZ | 07.06.2023 | |
HR | 07.06.2023 | ||
RO | 07.06.2023 | ||
RS | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
Former [2024/09] | CZ | 07.06.2023 | |
HR | 07.06.2023 | ||
RS | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
IS | 07.10.2023 | ||
Former [2024/08] | HR | 07.06.2023 | |
RS | 07.06.2023 | ||
SK | 07.06.2023 | ||
SM | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/51] | HR | 07.06.2023 | |
RS | 07.06.2023 | ||
NO | 07.09.2023 | ||
GR | 08.09.2023 | ||
Former [2023/50] | NO | 07.09.2023 | |
GR | 08.09.2023 | ||
Former [2023/48] | NO | 07.09.2023 | Documents cited: | Search | [Y]DE102008008240 (FLOORING TECHNOLOGIES LTD [MT]); | [Y]EP2106903 (HERMES SCHLEIFKOERPER GMBH [DE]); | [Y]EP2905135 (DAMMERS DIRK [DE]); | [Y]EP3059020 (FLOORING TECHNOLOGIES LTD [MT]); | [Y]WO2016180643 (FRITZ EGGER GMBH & CO OG [AT]); | [YD]EP3023261 (FLOORING TECHNOLOGIES LTD [MT]) | by applicant | EP1820640 | EP3023261 |