EP3489703 - METHOD FOR DETERMINING A CURRENT CHARGE LEVEL OF A BATTERY, BATTERY ASSEMBLY AND MOTOR VEHICLE [Right-click to bookmark this link] | Status | The patent has been granted Status updated on 15.03.2024 Database last updated on 04.06.2024 | |
Former | Grant of patent is intended Status updated on 16.01.2024 | ||
Former | Examination is in progress Status updated on 12.05.2022 | ||
Former | Request for examination was made Status updated on 06.12.2019 | ||
Former | The application has been published Status updated on 26.04.2019 | Most recent event Tooltip | 15.03.2024 | (Expected) grant | published on 17.04.2024 [2024/16] | Applicant(s) | For all designated states AUDI AG Auto-Union-Strasse 1 85045 Ingolstadt / DE | [2019/22] | Inventor(s) | 01 /
Naumann, Rolf Wittmannstr. 6 85055 Etting / DE | 02 /
Kraus, Matthias Fruchtheim 34 85123 Karlskron / DE | [2019/22] | Application number, filing date | 18177924.0 | 15.06.2018 | [2019/22] | Priority number, date | DE201710221248 | 28.11.2017 Original published format: DE102017221248 | [2019/22] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP3489703 | Date: | 29.05.2019 | Language: | DE | [2019/22] | Type: | B1 Patent specification | No.: | EP3489703 | Date: | 17.04.2024 | Language: | DE | [2024/16] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 31.01.2019 | Classification | IPC: | G01R31/389, G01R31/374 | [2019/22] | CPC: |
G01R31/389 (EP,US);
G01R31/387 (US);
G01R31/3648 (US);
G01R31/374 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/02] |
Former [2019/22] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR BESTIMMUNG EINES AKTUELLEN LADEZUSTANDSWERTS EINER BATTERIE, BATTERIEANORDNUNG UND KRAFTFAHRZEUG | [2019/22] | English: | METHOD FOR DETERMINING A CURRENT CHARGE LEVEL OF A BATTERY, BATTERY ASSEMBLY AND MOTOR VEHICLE | [2019/22] | French: | PROCÉDÉ DE DÉTERMINATION D'UNE VALEUR D'ÉTAT DE CHARGEMENT ACTUEL D'UNE BATTERIE, DISPOSITIF BATTERIE ET VÉHICULE AUTOMOBILE | [2019/22] | Examination procedure | 18.04.2019 | Amendment by applicant (claims and/or description) | 29.11.2019 | Examination requested [2020/02] | 29.11.2019 | Date on which the examining division has become responsible | 11.05.2022 | Despatch of a communication from the examining division (Time limit: M04) | 10.08.2022 | Reply to a communication from the examining division | 17.01.2024 | Communication of intention to grant the patent | 07.03.2024 | Fee for grant paid | 07.03.2024 | Fee for publishing/printing paid | 07.03.2024 | Receipt of the translation of the claim(s) | Fees paid | Renewal fee | 30.06.2020 | Renewal fee patent year 03 | 30.06.2021 | Renewal fee patent year 04 | 30.06.2022 | Renewal fee patent year 05 | 30.06.2023 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Documents cited: | Search | [Y]FR2749397 (TELECOMMUNICATIONS SA [FR]) [Y] 3-6 * abstract ** page 15, line 27 - page 19, line 25 *; | [X]DE19903239 (FAHRZEUGAUSRUESTUNG BERLIN GMB [DE]) [X] 1,2,7-10 * abstract * * column 1, line 45 - column 2, line 36 *; | [XY]DE102005052448 (CONTINENTAL TEVES AG & CO OHG [DE]) [X] 1,2,7-10 * abstract * * paragraphs [0006] - [0011] - [0018] , [0024] * [Y] 3-6; | [X]DE102009058893 (DAIMLER AG [DE]) [X] 1,2,7-10 * abstract * * paragraphs [0004] , [0008] - [0010] - [0023] - [0027] * |