EP3584024 - SAW BLADE AND ITS METHOD OF PRODUCTION [Right-click to bookmark this link] | |||
Former [2019/52] | SAW BLADE | ||
[2021/45] | Status | No opposition filed within time limit Status updated on 10.03.2023 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 02.04.2022 | ||
Former | Grant of patent is intended Status updated on 07.12.2021 | ||
Former | Examination is in progress Status updated on 03.04.2021 | ||
Former | Request for examination was made Status updated on 29.05.2020 | ||
Former | The application has been published Status updated on 22.11.2019 | Most recent event Tooltip | 27.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 30.10.2024 [2024/44] | Applicant(s) | For all designated states Ceratizit Luxembourg Sàrl 101, route de Holzem 8232 Mamer / LU | [2019/52] | Inventor(s) | 01 /
STREBLER, Philippe Ceratizit Luxembourg Sàrl c/o Ceratizit Luxembourg Sàrl 101, Route de Holzem 8232 Mamer / LU | 02 /
DURAES, André Ceratizit Luxembourg Sàrl c/o Ceratizit Luxembourg Sàrl 101, Route de Holzem 8232 Mamer / LU | 03 /
STECKLER, Romain Ceratizit Luxembourg Sàrl c/o Ceratizit Luxembourg Sàrl 101, Route de Holzem 8232 Mamer / LU | 04 /
BERNARDY, Florian Ceratizit Luxembourg Sàrl c/o Ceratizit Luxembourg Sàrl 101, Route de Holzem 8232 Mamer / LU | [2019/52] | Representative(s) | Ciesla, Dirk, et al IP Department Plansee Group Plansee Group Service GmbH 6600 Reutte / AT | [2019/52] | Application number, filing date | 18178426.5 | 19.06.2018 | [2019/52] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3584024 | Date: | 25.12.2019 | Language: | EN | [2019/52] | Type: | B1 Patent specification | No.: | EP3584024 | Date: | 04.05.2022 | Language: | EN | [2022/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.12.2018 | Classification | IPC: | B23D61/02, B23D61/12, B23D65/02 | [2019/52] | CPC: |
B23D65/02 (EP,US);
B23D61/121 (US);
B23D61/02 (EP);
B23D61/12 (EP);
B23D61/127 (US);
B23D61/128 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2020/27] |
Former [2019/52] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SÄGEBLATT UND SEIN HERSTELLUNGSVERFAHREN | [2021/45] | English: | SAW BLADE AND ITS METHOD OF PRODUCTION | [2021/45] | French: | LAME DE SCIE ET SON PROCÉDÉ DE FABRICATION | [2021/45] |
Former [2019/52] | SÄGEBLATT | ||
Former [2019/52] | SAW BLADE | ||
Former [2019/52] | LAME DE SCIE | Examination procedure | 22.05.2020 | Amendment by applicant (claims and/or description) | 22.05.2020 | Examination requested [2020/27] | 22.05.2020 | Date on which the examining division has become responsible | 07.04.2021 | Despatch of a communication from the examining division (Time limit: M04) | 29.07.2021 | Reply to a communication from the examining division | 08.12.2021 | Communication of intention to grant the patent | 23.03.2022 | Fee for grant paid | 23.03.2022 | Fee for publishing/printing paid | 23.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 07.02.2023 | No opposition filed within time limit [2023/15] | Fees paid | Renewal fee | 31.03.2020 | Renewal fee patent year 03 | 22.06.2021 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.06.2018 | AL | 04.05.2022 | AT | 04.05.2022 | CY | 04.05.2022 | DK | 04.05.2022 | EE | 04.05.2022 | FI | 04.05.2022 | HR | 04.05.2022 | LT | 04.05.2022 | LV | 04.05.2022 | MC | 04.05.2022 | MK | 04.05.2022 | MT | 04.05.2022 | RO | 04.05.2022 | RS | 04.05.2022 | SI | 04.05.2022 | SK | 04.05.2022 | SM | 04.05.2022 | IE | 19.06.2022 | LU | 19.06.2022 | BE | 30.06.2022 | BG | 04.08.2022 | NO | 04.08.2022 | GR | 05.08.2022 | IS | 04.09.2022 | PT | 05.09.2022 | [2024/44] |
Former [2024/24] | HU | 19.06.2018 | |
AL | 04.05.2022 | ||
AT | 04.05.2022 | ||
CY | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
MK | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 19.06.2022 | ||
LU | 19.06.2022 | ||
BE | 30.06.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/23] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CY | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
MK | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 19.06.2022 | ||
LU | 19.06.2022 | ||
BE | 30.06.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2024/20] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
CY | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 19.06.2022 | ||
LU | 19.06.2022 | ||
BE | 30.06.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/25] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SI | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 19.06.2022 | ||
LU | 19.06.2022 | ||
BE | 30.06.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/21] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 19.06.2022 | ||
LU | 19.06.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/20] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
IE | 19.06.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/17] | AL | 04.05.2022 | |
AT | 04.05.2022 | ||
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/11] | AT | 04.05.2022 | |
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
MC | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/09] | AT | 04.05.2022 | |
DK | 04.05.2022 | ||
EE | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
RO | 04.05.2022 | ||
RS | 04.05.2022 | ||
SK | 04.05.2022 | ||
SM | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2023/07] | AT | 04.05.2022 | |
DK | 04.05.2022 | ||
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
RS | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/51] | AT | 04.05.2022 | |
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
RS | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
IS | 04.09.2022 | ||
PT | 05.09.2022 | ||
Former [2022/50] | AT | 04.05.2022 | |
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
RS | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/49] | AT | 04.05.2022 | |
FI | 04.05.2022 | ||
HR | 04.05.2022 | ||
LT | 04.05.2022 | ||
LV | 04.05.2022 | ||
BG | 04.08.2022 | ||
NO | 04.08.2022 | ||
GR | 05.08.2022 | ||
PT | 05.09.2022 | ||
Former [2022/47] | AT | 04.05.2022 | |
FI | 04.05.2022 | ||
LT | 04.05.2022 | ||
NO | 04.08.2022 | ||
PT | 05.09.2022 | Documents cited: | Search | [A]US4015331 (BALKE KARL HEINZ) [A] 1,13* figures 2,3 *; | [A]JPH06155401 (KISO POWER TOOL KK) [A] 1,13 * abstract * * figure 4 *; | [XAI]US5855157 (OKAMURA HIDEZUMI [JP], et al) [X] 1-3,5-7,9,11 * column 4, lines 45-51 * * column 11, line 36 - column 12, line 6 * * column 14, lines 33-42 * * column 17, line 57 - column 18, line 5 * * column 18, lines 41-47 * * figures 26a-26c,27a-27c,36a,36b * [A] 4,8,10 [I] 13,15,16; | [XA]DE10303915 (PI PATENT INTERCONSULTING GMBH [DE]) [X] 1-3,5-8 * paragraphs [0001] , [0012] - [0015] * * figure - * [A] 4,9-13; | [XA]ES2383627T (BOSCH GMBH ROBERT [DE]) [X] 1-3,6,7,9 * figures 1,5,6 * [A] 13; | [IA]US2014157607 (MCFARLAND DAVID B [US]) [I] 1,2,5-7 * paragraphs [0007] , [0024] , [0025] , [0027] , [0032] - [0034] - [0036] * * figures 1-6 * [A] 3,4,8-10,13 | Examination | DE3445206 | DE19712448 |