EP3427695 - A BLOOD FLOW CONTROLLING APPARATUS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 22.12.2023 Database last updated on 04.06.2024 | |
Former | The patent has been granted Status updated on 13.01.2023 | ||
Former | Grant of patent is intended Status updated on 15.09.2022 | ||
Former | Request for examination was made Status updated on 19.07.2019 | ||
Former | The application has been published Status updated on 14.12.2018 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Edwards Lifesciences AG Route de l'Etraz 70 1260 Nyon / CH | [2022/50] |
Former [2019/03] | For all designated states Edwards Lifesciences AG Chemin du Glapin 6 1162 St. Prex / CH | Inventor(s) | 01 /
Jan Otto, Solem Hulda Rasks v.12 23742 Bjarred / SE | [2019/03] | Representative(s) | Dolleymores 9 Rickmansworth Road Watford, Hertfordshire WD18 0JU / GB | [2019/03] | Application number, filing date | 18178494.3 | 20.04.2006 | [2019/03] | Priority number, date | SE20050000891 | 21.04.2005 Original published format: SE 0500891 | [2019/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3427695 | Date: | 16.01.2019 | Language: | EN | [2019/03] | Type: | B1 Patent specification | No.: | EP3427695 | Date: | 15.02.2023 | Language: | EN | [2023/07] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 22.11.2018 | Classification | IPC: | A61F2/24, A61B17/04 | [2019/03] | CPC: |
A61F2/2418 (EP,US);
A61F2/2442 (US);
A61F2/2403 (US);
A61F2/2412 (EP,SE,US);
A61F2/2427 (US);
A61F2/2457 (US);
A61F2/246 (EP,US);
A61B2017/0412 (EP,US);
A61F2/2466 (EP,US);
A61F2210/0014 (EP,US);
A61F2220/0008 (EP,US);
A61F2220/0016 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2019/34] |
Former [2019/03] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | BLUTFLUSSSTEUERUNGSVORRICHTUNG | [2019/03] | English: | A BLOOD FLOW CONTROLLING APPARATUS | [2019/03] | French: | APPAREIL DE CONTRÔLE DU FLUX SANGUIN | [2019/03] | Examination procedure | 16.07.2019 | Amendment by applicant (claims and/or description) | 16.07.2019 | Examination requested [2019/34] | 16.07.2019 | Date on which the examining division has become responsible | 16.09.2022 | Communication of intention to grant the patent | 04.01.2023 | Fee for grant paid | 04.01.2023 | Fee for publishing/printing paid | 04.01.2023 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP06724472.3 / EP1871300 | EP16157166.6 / EP3056170 | EP17156346.3 / EP3187150 | Opposition(s) | 16.11.2023 | No opposition filed within time limit [2024/04] | Fees paid | Renewal fee | 27.06.2018 | Renewal fee patent year 03 | 27.06.2018 | Renewal fee patent year 04 | 27.06.2018 | Renewal fee patent year 05 | 27.06.2018 | Renewal fee patent year 06 | 27.06.2018 | Renewal fee patent year 07 | 27.06.2018 | Renewal fee patent year 08 | 27.06.2018 | Renewal fee patent year 09 | 27.06.2018 | Renewal fee patent year 10 | 27.06.2018 | Renewal fee patent year 11 | 27.06.2018 | Renewal fee patent year 12 | 27.06.2018 | Renewal fee patent year 13 | 18.04.2019 | Renewal fee patent year 14 | 21.04.2020 | Renewal fee patent year 15 | 15.04.2021 | Renewal fee patent year 16 | 16.03.2022 | Renewal fee patent year 17 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 15.02.2023 | CZ | 15.02.2023 | DK | 15.02.2023 | EE | 15.02.2023 | ES | 15.02.2023 | FI | 15.02.2023 | IT | 15.02.2023 | LT | 15.02.2023 | LV | 15.02.2023 | MC | 15.02.2023 | NL | 15.02.2023 | PL | 15.02.2023 | RO | 15.02.2023 | SE | 15.02.2023 | SI | 15.02.2023 | SK | 15.02.2023 | IE | 20.04.2023 | LU | 20.04.2023 | BE | 30.04.2023 | CH | 30.04.2023 | LI | 30.04.2023 | GR | 16.05.2023 | IS | 15.06.2023 | PT | 15.06.2023 | [2024/26] |
Former [2024/21] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
EE | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
MC | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
SE | 15.02.2023 | ||
SI | 15.02.2023 | ||
SK | 15.02.2023 | ||
IE | 20.04.2023 | ||
LU | 20.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2024/11] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
EE | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
MC | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
SE | 15.02.2023 | ||
SI | 15.02.2023 | ||
SK | 15.02.2023 | ||
LU | 20.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2024/09] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
EE | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
MC | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
SE | 15.02.2023 | ||
SK | 15.02.2023 | ||
LU | 20.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2024/08] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
EE | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
MC | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
SE | 15.02.2023 | ||
SK | 15.02.2023 | ||
LU | 20.04.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2024/04] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
EE | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
SE | 15.02.2023 | ||
SK | 15.02.2023 | ||
LU | 20.04.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/50] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
EE | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
SE | 15.02.2023 | ||
SK | 15.02.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/49] | AT | 15.02.2023 | |
CZ | 15.02.2023 | ||
DK | 15.02.2023 | ||
EE | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
RO | 15.02.2023 | ||
SE | 15.02.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/48] | AT | 15.02.2023 | |
DK | 15.02.2023 | ||
EE | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
SE | 15.02.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/46] | AT | 15.02.2023 | |
DK | 15.02.2023 | ||
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
SE | 15.02.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/39] | AT | 15.02.2023 | |
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
SE | 15.02.2023 | ||
GR | 16.05.2023 | ||
IS | 15.06.2023 | ||
PT | 15.06.2023 | ||
Former [2023/38] | AT | 15.02.2023 | |
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
PL | 15.02.2023 | ||
SE | 15.02.2023 | ||
GR | 16.05.2023 | ||
PT | 15.06.2023 | ||
Former [2023/37] | AT | 15.02.2023 | |
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
SE | 15.02.2023 | ||
GR | 16.05.2023 | ||
PT | 15.06.2023 | ||
Former [2023/36] | AT | 15.02.2023 | |
ES | 15.02.2023 | ||
FI | 15.02.2023 | ||
LT | 15.02.2023 | ||
LV | 15.02.2023 | ||
NL | 15.02.2023 | ||
SE | 15.02.2023 | ||
PT | 15.06.2023 | ||
Former [2023/35] | AT | 15.02.2023 | |
ES | 15.02.2023 | ||
LT | 15.02.2023 | ||
NL | 15.02.2023 | ||
PT | 15.06.2023 | ||
Former [2023/34] | ES | 15.02.2023 | |
LT | 15.02.2023 | ||
PT | 15.06.2023 | ||
Former [2023/33] | ES | 15.02.2023 | |
LT | 15.02.2023 | Documents cited: | Search | [A]WO9930647 (MYOCOR INC [US], et al) [A] 1-14 * page 7, line 4 - line 21; figure 9 ** page 9, line 22 - line 33; figure 21 *; | [A]EP1472996 (MEDTRONIC VASCULAR INC [US]) [A] 1-14 * paragraph [0045] - paragraph [0048]; figure 9 * * paragraph [0045] - paragraph [0048] *; | [XP]WO2005087140 (PERCUTANEOUS CARDIOVASCULAR SO [AU], et al) [XP] 1,2,5-7,9-14 * page 15, line 10 - page 16, line 2; figures 16-20 * * page 11, line 3 - line 11 * | by applicant | US6210432 |