blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3418669

EP3418669 - THERMAL EXCHANGER CLEANING INSTALLATION AND SYSTEM THEREOF [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.10.2021
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  13.11.2020
FormerGrant of patent is intended
Status updated on  06.07.2020
FormerRequest for examination was made
Status updated on  02.03.2020
FormerGrant of patent is intended
Status updated on  08.01.2020
FormerRequest for examination was made
Status updated on  28.06.2019
FormerThe application has been published
Status updated on  23.11.2018
Most recent event   Tooltip13.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 16.10.2024 [2024/42]
Applicant(s)For all designated states
Eugene B
14, Boulevard Ornano
75018 Paris / FR
[2018/52]
Inventor(s)01 / JACKSON, Philip
15 rue Las Cases
75007 PARIS / FR
 [2018/52]
Representative(s)Ipsilon
Le Centralis
63, avenue du Général Leclerc
92340 Bourg-la-Reine / FR
[2020/51]
Former [2018/52]Petit, Maxime, et al
Ipsilon
Le Centralis
63, avenue du Général Leclerc
92340 Bourg-la-Reine / FR
Application number, filing date18179196.322.06.2018
[2018/52]
Priority number, dateFR2017005577823.06.2017         Original published format: FR 1755778
[2018/52]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3418669
Date:26.12.2018
Language:FR
[2018/52]
Type: B1 Patent specification 
No.:EP3418669
Date:16.12.2020
Language:FR
[2020/51]
Search report(s)(Supplementary) European search report - dispatched on:EP31.10.2018
ClassificationIPC:F28G1/12, B08B9/055
[2018/52]
CPC:
F28G1/12 (EP,KR,US); B08B9/0551 (EP,US); B08B9/057 (EP,US);
F28G15/04 (KR); B08B2209/055 (US); B08B9/0552 (EP,US);
F28G1/00 (US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2019/31]
Former [2018/52]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:THERMALAUSTAUSCHREINIGUNGSSYSTEM UND SYSTEM DAVON[2018/52]
English:THERMAL EXCHANGER CLEANING INSTALLATION AND SYSTEM THEREOF[2018/52]
French:INSTALLATION DE NETTOYAGE D'ÉCHANGEUR THERMIQUE ET SYSTÈME ASSOCIÉ[2018/52]
Examination procedure20.06.2019Amendment by applicant (claims and/or description)
20.06.2019Examination requested  [2019/31]
20.06.2019Date on which the examining division has become responsible
09.01.2020Communication of intention to grant the patent
27.02.2020Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
07.07.2020Communication of intention to grant the patent
05.11.2020Fee for grant paid
05.11.2020Fee for publishing/printing paid
05.11.2020Receipt of the translation of the claim(s)
Opposition(s)17.09.2021No opposition filed within time limit [2021/47]
Fees paidRenewal fee
29.06.2020Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.06.2018
AL16.12.2020
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
MK16.12.2020
MT16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
TR16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE22.06.2021
LU22.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
[2024/42]
Former [2024/29]HU22.06.2018
AL16.12.2020
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
MK16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
TR16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE22.06.2021
LU22.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
Former [2024/23]HU22.06.2018
AL16.12.2020
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
MK16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE22.06.2021
LU22.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
Former [2023/33]HU22.06.2018
AL16.12.2020
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE22.06.2021
LU22.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
Former [2023/30]AL16.12.2020
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE22.06.2021
LU22.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
Former [2022/34]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE22.06.2021
LU22.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
Former [2022/23]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE22.06.2021
LU22.06.2021
CH30.06.2021
LI30.06.2021
Former [2022/21]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
IE22.06.2021
LU22.06.2021
CH30.06.2021
LI30.06.2021
Former [2022/18]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
LU22.06.2021
Former [2022/13]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2022/10]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2022/08]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/49]AL16.12.2020
AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/45]AL16.12.2020
AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/42]AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/39]AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/37]AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/36]CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/35]CZ16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RO16.12.2020
RS16.12.2020
SE16.12.2020
SK16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/33]FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RS16.12.2020
SE16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/32]FI16.12.2020
HR16.12.2020
LV16.12.2020
NL16.12.2020
RS16.12.2020
SE16.12.2020
SM16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/30]FI16.12.2020
HR16.12.2020
LV16.12.2020
NL16.12.2020
RS16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/28]FI16.12.2020
HR16.12.2020
LV16.12.2020
RS16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/24]FI16.12.2020
LV16.12.2020
RS16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/23]FI16.12.2020
LV16.12.2020
RS16.12.2020
SE16.12.2020
NO16.03.2021
GR17.03.2021
Former [2021/22]FI16.12.2020
RS16.12.2020
NO16.03.2021
Former [2021/20]FI16.12.2020
Documents cited:Search[A]US4554965  (BOCHINSKI ROLF [DE], et al) [A] 1-14 * the whole document *;
 [XAI]JP2001272199  (HITACHI PLANT ENG & CONSTR CO, et al) [X] 1,3-5,8 * figures 1,2 * [A] 2,9-14 [I] 6,7;
 [XAI]WO2005124261  (SEOL WON SEAL [KR]) [X] 1,3-5,8 * figures 2, 7 * [A] 2,9-14 [I] 6,7;
 [A]CN103712513  (BEIJING IVYQUEN ENERGY SAVING TECHNOLOGIES LTD) [A] 1-14* the whole document *
by applicantFR2716530
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.